pm heavy tactical vehicles - national guard association of … ngaus... · · 2016-05-20pm heavy...
TRANSCRIPT
GO HEAVY and GO Home!
PM Heavy Tactical Vehicles
Product Manager: Wolfgang [email protected]
Deputy PM: Patricia [email protected]
Transform Combat Support (CS) and Combat ServiceSupport (CSS) Units by Equipping and Supporting Soldierswith Heavy Tactical Wheeled Vehicles and Tactical Trailers,along with their Associated Distribution Platforms andMission Modules.
To provide the Army logistician with the ultimateoperational capability to conduct resupply, re-arming,and recovery operations using the most adaptable,survivable equipment available.
VISION
MISSION
4 May 2016
HTV Brief to NGAUS
“DISTRIBUTION STATEMENT A: Approved for Public Release”
GO HEAVY and GO Home!
Agenda
• Portfolio Overview
• Modernization Through Recap (HEMTT/PLS)
• Modular Catastrophic Recovery System
• Heavy Dump Truck
• 25 Ton Trailer
• M870A4 40 Ton Trailer
• How Can the National Guard Help
• Questions
2
GO HEAVY and GO Home!
Product ManagerHeavy Tactical Vehicles
Heavy Expanded Mobility
Tactical Truck (HEMTT)
Heavy Equipment
Transport System (HETS)(in sustainment 1 October 2015)
Palletized Loading System (PLS)M915 Line Haul(in sustainment)
Heavy Dump Truck (HDT)
Modular Catastrophic
Recovery System (MCRS)
HET Urban Survivability Kit
(HUSK)
Under Development
AAO: 1,1542,106 Fielded
AAO: 2,096
Under Development
5,737 Fielded
AAO: 5,19825,888 Fielded
AAO: 20,077
7,140 Fielded
AAO: 6,956
92 Fielded
AAO: 123
40 Ton Semitrailer (STLB)
1,723 Fielded
AAO: 2,634
25TonTrailer (STLB)
0 Fielded
AAO: 1,475*
*per April 2014 CPD
3
GO HEAVY and GO Home!
Heavy Expandable Mobility Tactical Truck
(HEMTT)
Program Description• The HEMTT 10-ton, 8-wheel drive is designed for cross-country
military missions up to 11 tons to transport ammunition, petroleum, oils
and lubricants. Eight variants: M977, M985, M978, M983, M983 Light
Equipment Transporter (LET), M984, and M1120
• Prime Contractor: Oshkosh Truck Corporation, Oshkosh, WI
• Major Subcontractors: Caterpillar, Peoria, IL; Allison Transmission,
Indianapolis, IN; Michelin, Greenville, SC
The quantity of HEMTTs on hand: 25,188
HEMTT AAO: 20,077
Quantity on Contract:* 1824
*Contract is for HEMTT RECAP.
No new HEMTT production.
Recent Milestones or Events • HEMTT RECAP production ongoing
Near Term Milestones or Events
• Award STS contract
Schedule
ACAT I – P&D PEO CS&CSS/PM TS/PdM HTV
4
GO HEAVY and GO Home!
Palletized Load System (PLS)
Program Description• The PLSA1 Truck/Trailer is a 16.5-ton payload system (10x10) with an
Onboard Load Handling system (LHS) . The primary mission of the PLSA1 is
the rapid movement of combat configured loads of ammunition and all other
classes of supply, either containerized 20’ ISO containers (utilizing the
Enhanced Container Handling Unit (E-CHU) / Container Handling Unit (CHU)
or non-containerized. (utilizing the Flat rack or Container roll on/off platform
(CROP) systems)
• Prime Contractors:
• PLSA0/A1-Oshkosh Defense, LLC, Oshkosh WI
• PLS-T (Trailer); Container Transfer Enhancement (CTE), Oshkosh
Truck Corp
• Enhanced Container Handling Unit (E-CHU)-GT Machining, Canada
Quantity of PLS on hand: 7826
PLS AAO: 6956
Quantity on contract: 824
Recent Milestones or Events• PLS RECAP production ongoing
Near Term Milestones or Events• Award STS Contract
Schedule
ACAT I – P&D PEO CS&CSS/PM TS/PdM HTV
5
GO HEAVY and GO Home!
Program Description• The MCRS, formerly known as the Interim Stryker Recovery System
Generation II (ISRS GEN II), is designed to significantly enhance the
Commander’s ability to recover large wheeled vehicle platforms in
severe off-road conditions either in lift/tow or transport mode.
• Coupled with the Prime Mover (M983A4 LET), MCRS is capable of
recovering all Stryker variants and an estimated 95% of Mine
Resistant Ambush Protected (MRAPs) currently in theater.
• Includes an upgraded 35K winch, a winch control kit that allows
tandem winching operations, remote control winch operations,
expandable reinforced solid deck, pneumatic third axle on trailer,
sliding trailer axle, tilt deck trailer, & 90 degree recovery capability.
• Contractor: TRU-HITCH Inc, Pleasant Valley, CT
Milestones and Events Completed New Production of 20 Fifth Wheel Towing Recovery Devices (FWTRD)
& 49 Winch Control Kits (WCK) awarded 22 Oct 2015
Refurbishment contract for 11 FWTRD & 36 Tilt Deck Recovery Trailers
(TDRT) awarded 5 November 2015
Urgent Material Release (UMR) approved 2 February 2016 to support
2nd Cavalry Regiment (2CR) in Europe with 8 MCRS Assets
Completed successful Field Lighting Kits (FLK) Installation Verification
9 February 2016 & approved proto-type production for test
Near Term Milestones and Events • 2CR De-processing, New Equipment Training (NET) & Hand-Off NLT
30 April 2016
• MCRS Full Material Release (FMR) Testing to start May 2016
• J&A Approval for 8 FWTRDs/6 TDRTs May 2016
• J&A Approval for RESET May 2016
• Type Classification (TC) / FMR target 4QFY2017
Program Schedule, Budget and Status
Modular Catastrophic Recovery System (MCRS)
ACAT III
NOW
6
GO HEAVY and GO Home!7
Heavy Dump Truck (HDT)
Program Description• The HDT supports construction projects by loading, transporting and
dumping payloads of sand and gravel aggregates, crushed rock, hot
asphalt mixes, earth, clay, rubble, large boulders and other materials up
to gross vehicle weight rating to job sites under worldwide climatic
conditions.
• The HDT will also serve as a quarry truck for the quick transport of bulk
raw earth material to and from the crushing screening and washing plant
and the asphalt mixing plant.
• HDT also serves as a transportation asset for engineering equipment.
• The current HDT will be procured with an Armor Solution that is in
compliance with the Long Term Armor Strategy (LTAS) v3.6 perimeter
ballistic specification and Mine Resistant Ambush Protected (MRAP)
v1.1 underbody ballistic specification
Milestones and Events Completed CPD approved 22 October 2013
PEO Programmatic Review Decision 4 November 2014
Industry Day
Force Protection Level Review
DOORS – Dynamic Object Oriented Requirements System to
crosswalk past and current requirements
Force Development – Army assigned HDT Affordability Cap
Configuration Steering Board (September 2015)
WSTA – Whole Systems Trade-Study Analysis
Near Term Milestones and Events • Nevada Automotive Test Center Trade Study - 1 May 2016
• P-Spec requirements conversion - 1 June 2016
• Generate program documentation; Acquisition Strategy, Test and
Evaluation Master Plan (TEMP), Life Cycle Sustainment Plan
(LCSP), System Engineering Plan (SEP) and Acquisition Program
Baseline (APB),etc.
Program Schedule and Status
ACAT III – (Pre Milestone C)
NOW
GO HEAVY and GO Home!
Program Description• The STLB will be a commercially based semi-trailer used to
transport construction equipment, miscellaneous equipment,
disabled equipment, Class IV, and logistical provisions.
• 25T Trailer will feature a fixed goose with a flat/level deck and rear
loading ramps
• The trailer will be employed to perform line-haul, local-haul,
administrative and evacuation missions and supports
loading/unloading of equipment from the rear of the trailer through
the use of rear loading ramps.
• Prime movers : M1088, M983, M915/M916
• Contract Type: TBD
• Prime Contractor: TBD
Milestones and Events• CASCOM trailer study: M172 and M870A4
• Phase I complete 6 Mar 2015; 25 ton trailer not part of additional
phases.
• MDD = 4QTR FY17
• Contract award = 3QTR FY19
• FRP Decision = 2QTR FY21
• ADM Approved 9 May 2015 to accelerate schedule by 2 years
• MDA approved use of HTV RDT&E FY15 funds to support pre-MDD
efforts for the 25 ton trailer program (ADM signed 9 May 2015)
• 14 Aug 2015 – RDT&E funding rescinded by Congress
• 7 March 2016 – Briefed PEO on 3 COA’s for program. PEO
concurred verbally with COA 3 to initiate program at production,
perform a bid sample test, down select and award at MS C w/NATC
trade study. COA depends on willingness of prospective contractors
to provide bid samples and will be determined by RFI results.
• 20 April 2016 – RFI released to industry. Will be out on fed biz ops
for 30 days for potential bidders to respond.
Program Schedule, Budget and Status
25T Semitrailer Low Bed(STLB)ACAT III
8
GO HEAVY and GO Home!
Program Description
•The M870A4 is a three-axle, dual wheel tactical, low-bed
semitrailer used to transport tracked vehicles, wheeled vehicles
and Engineer Construction Equipment (ECE) weighing up to 40
tons.
• The M870A4 features mechanical folding gooseneck, level deck
and rear ramps.
• Contract Type: Multiple Award, Firm Fixed Price, Indefinite
Delivery, Indefinite Quantity w/ Options
• Commercial Market will drive costs
Milestones and Events Completed
RFP released on 4 December 2015 (most recent ADM)
Received proposals 11 January 2016
Source Selection Evaluation Board (SSEB) is continuing to
evaluate.
Near Term Milestones and Events • Completion of SSEB.• Contract award 4QFY16.
• MS C \ LRIP decision: 2QFY18
Program Schedule and Status
M870A4 40-Ton TrailerACAT III – Pre-MSC PEO CS&CSS/PM TS/PdM HTV
1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR
Program
Management
Engineering
Testing
Logisitics
Production
CON MGMT
FY 24FY 22 FY 23FY 19 FY 20 FY 21FY 17 FY 1825-Nov-15 FY 14 FY 15 FY16
ACAT IIIADM
Draft Solicitation andProgram Documentation
Release RFP
Multi ContractAward (DO #1)
SSEB
Assemble Prototype Trailers
PVT
Full Rate Production Decision
(DO #3)
Start of Work Meeting
Validate PurchaseDescription
FPVI DT/OT
TC/Mat Rel Decision
Logistics Demonstration
TM Verification
Assemble LRIP Trailers
Award (DO #2)
Start of Work Meeting
Production
Run-Off TestProduction
Prove-Out Test (PPT)
NATC
Assessment of Run-Off testresults and Fair Opportunity Submissions
Validate PurchaseDescription
TRRA-FPVI
Functional Baseline
DARAllocated Baseline
Phase I Design Review
TRR
FC Audit
PRR
PC Audit
Process Audit
Production Baseline
Phase II Design
P-BL approved / Lock
A-BL Lock
First Article Test (FAT)
Commerical Manual Log Development
MS C
1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR 1QTR 2QTR 3QTR 4QTR
Program
Management
Engineering
Testing
Logisitics
Production
CON MGMT
FY 24FY 22 FY 23FY 19 FY 20 FY 21FY 17 FY 1825-Nov-15 FY 14 FY 15 FY16
ACAT IIIADM
Draft Solicitation andProgram Documentation
Release RFP
Multi ContractAward (DO #1)
SSEB
Assemble Prototype Trailers
PVT
Full Rate Production Decision
(DO #3)
Start of Work Meeting
Validate PurchaseDescription
FPVI DT/OT
TC/Mat Rel Decision
Logistics Demonstration
TM Verification
Assemble LRIP Trailers
Award (DO #2)
Start of Work Meeting
Production
Run-Off TestProduction
Prove-Out Test (PPT)
NATC
Assessment of Run-Off testresults and Fair Opportunity Submissions
Validate PurchaseDescription
TRRA-FPVI
Functional Baseline
DARAllocated Baseline
Phase I Design Review
TRR
FC Audit
PRR
PC Audit
Process Audit
Production Baseline
Phase II Design
P-BL approved / Lock
A-BL Lock
First Article Test (FAT)
Commerical Manual Log Development
MS C
NOW
9
GO HEAVY and GO Home!
How Can the National Guard Help
• Timely MSP submissions
• NEGREA funding M872 Trailer
• RECAP carcass supply of HEMTT and PLS
10
GO HEAVY and GO Home!
Questions?
?
11