pm check list
TRANSCRIPT
-
7/25/2019 PM Check List
1/10
t week (8HRS.) Date:
Units Parts to be clean/Check
Responsibility
Rearks!aint. "pr.
#ee$er %nit
All Filters
Static eliminator
Air & vaccum pipe lines
Lifting suckers & Forwarding suckers
Sidelay & frontlay timing
rintin& %nits
Gripper
Plate or blanket bearing
Plate chase
I Paper clean!hange"Per unit#
Packing of plate & $lanket check"Per unit#
Ink duct
All %ollers clean with calcium wash
irculation of warm water in Aeous unit
'ampening water tray
All points of Ink wash!Impression wash
elie'ery %nit
All fans
Powder holes
All filters
(!c full body
Static eliminator
ccessories
'ampening tank clean
#ee$eren
sst."pr.
Cont.abo%r
Powder from )oggers *chains & suctionwheel
Filling of $lanket wash!Impressionwash!%oller wash solvent
heck blanket wash cloth!Impression wash
cloth & change if necessary
-
7/25/2019 PM Check List
2/10
*ote: ll sche$%le$ work as per !its%bishi +%i$elines
-
7/25/2019 PM Check List
3/10
$ week (8 HRS.) Date:
Units Parts to be clean/Check
Responsibility - tie
Rearks!aint. "pr.
#ee$erAll Filters
Static eliminator
rintin& %nits
Gripper
+ ,nits %oller
Packing of plate & $lanket check"Per unit#
irculation of warm water in Aeous unit
'ampening water tray
elie'ery %nit
All fans
Powder holes
Static eliminator
(!c full body
ccessories'ampening tank clean
All filters
*ote: ll sche$%le$ work as per !its%bishi +%i$elines
#ee$eren
sst."pr.
Cont.abo%r
Powder from )oggers *chains & suctionwheel
-
7/25/2019 PM Check List
4/10
$ week(1, HRS.) Date:
Units Parts to be clean/Check
Responsibility - tie
Rearks
!aint. "pr.
#ee$er %nitAll Filters
Static eliminator
rintin& %nits
I Paper clean!hange"Per unit#
Ink duct
All %ollers clean with calcium wash
irculation of warm water in Aeous unit
'ampening water tray
elie'ery %nit
All fans
Powder holes
All filters
Powder from )oggers *chains & suction wheel
(!c full body
Static eliminator
ccessories'ampening tank clean
hiller tank
*ote: ll sche$%le$ work as per !its%bishi +%i$elines
#ee$eren
sst."pr.
Cont.abo%r
-
7/25/2019 PM Check List
5/10
r$ week(1, HRS.)
S.*o. Contents
- Inspect feeder drive hain .ension
+ Inspect separator drive chain tension
/ Inspect separator $rake lining
0
1 lean the filter oil cleaner
2 Inspect main motor 34belt tension
5 lean the air filter piping
6 lean lifting and forwarding suckers7 Inspect feeder pump vane blade for wear"1889rs:#
-8 lean vaccum slowdown wheel piping
--
-+ lean the Impression & .ransfer ylinder gripper serrations
-/ lean feed & discharge no;;le for coolong water tanks
-0 lean the separtor %otary 3alve
-1 Inspect the Feeder pile ,p4'own chain
-2 hange the feeder pump air filter"/888 hrs:#-5 Inspect the Inking System drive chain tension:-6 Inspect the delivery pile ,p4'own chain-7 Inspect the chain gripper chain elongation+8 Ad)ust chain gripper
+- Inspect seprator drive universal )oint
++ Inspect the sidelay & Frontlay tips+/ lean the printing unit chase oil tank+0 Inspect the powder spray timing valve+1 %eplace the delivery chain lubrication pump filters
+2 %eplace the delivery ring blower filters+5 %eplace the pan oil"Lubricant#
lean gripper shaft for Impression *.ransfer*Swing and'elivery
Inspect
-
7/25/2019 PM Check List
6/10
Responsibility Rearks
-
7/25/2019 PM Check List
7/10
r$ week(1, HRS.)
S.*o. Contents Responsibility
- lean the static eliminator electrodischarge bar:
+ lean the delivery fan:
/
0
1
2
5
6
7 Inspect the delivery )am4up detector:
-8 Inspect the board insertion board thrusting limit:
-- lean the delivery fan upper part:
-+ Inspect the activation of S.
-
7/25/2019 PM Check List
8/10
+-Inspect the delivery pile upper* lower and -88mmlimit switch:
-
7/25/2019 PM Check List
9/10
Rearks
-
7/25/2019 PM Check List
10/10