pm check list

Upload: sachinsharma31

Post on 24-Feb-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 PM Check List

    1/10

    t week (8HRS.) Date:

    Units Parts to be clean/Check

    Responsibility

    Rearks!aint. "pr.

    #ee$er %nit

    All Filters

    Static eliminator

    Air & vaccum pipe lines

    Lifting suckers & Forwarding suckers

    Sidelay & frontlay timing

    rintin& %nits

    Gripper

    Plate or blanket bearing

    Plate chase

    I Paper clean!hange"Per unit#

    Packing of plate & $lanket check"Per unit#

    Ink duct

    All %ollers clean with calcium wash

    irculation of warm water in Aeous unit

    'ampening water tray

    All points of Ink wash!Impression wash

    elie'ery %nit

    All fans

    Powder holes

    All filters

    (!c full body

    Static eliminator

    ccessories

    'ampening tank clean

    #ee$eren

    sst."pr.

    Cont.abo%r

    Powder from )oggers *chains & suctionwheel

    Filling of $lanket wash!Impressionwash!%oller wash solvent

    heck blanket wash cloth!Impression wash

    cloth & change if necessary

  • 7/25/2019 PM Check List

    2/10

    *ote: ll sche$%le$ work as per !its%bishi +%i$elines

  • 7/25/2019 PM Check List

    3/10

    $ week (8 HRS.) Date:

    Units Parts to be clean/Check

    Responsibility - tie

    Rearks!aint. "pr.

    #ee$erAll Filters

    Static eliminator

    rintin& %nits

    Gripper

    + ,nits %oller

    Packing of plate & $lanket check"Per unit#

    irculation of warm water in Aeous unit

    'ampening water tray

    elie'ery %nit

    All fans

    Powder holes

    Static eliminator

    (!c full body

    ccessories'ampening tank clean

    All filters

    *ote: ll sche$%le$ work as per !its%bishi +%i$elines

    #ee$eren

    sst."pr.

    Cont.abo%r

    Powder from )oggers *chains & suctionwheel

  • 7/25/2019 PM Check List

    4/10

    $ week(1, HRS.) Date:

    Units Parts to be clean/Check

    Responsibility - tie

    Rearks

    !aint. "pr.

    #ee$er %nitAll Filters

    Static eliminator

    rintin& %nits

    I Paper clean!hange"Per unit#

    Ink duct

    All %ollers clean with calcium wash

    irculation of warm water in Aeous unit

    'ampening water tray

    elie'ery %nit

    All fans

    Powder holes

    All filters

    Powder from )oggers *chains & suction wheel

    (!c full body

    Static eliminator

    ccessories'ampening tank clean

    hiller tank

    *ote: ll sche$%le$ work as per !its%bishi +%i$elines

    #ee$eren

    sst."pr.

    Cont.abo%r

  • 7/25/2019 PM Check List

    5/10

    r$ week(1, HRS.)

    S.*o. Contents

    - Inspect feeder drive hain .ension

    + Inspect separator drive chain tension

    / Inspect separator $rake lining

    0

    1 lean the filter oil cleaner

    2 Inspect main motor 34belt tension

    5 lean the air filter piping

    6 lean lifting and forwarding suckers7 Inspect feeder pump vane blade for wear"1889rs:#

    -8 lean vaccum slowdown wheel piping

    --

    -+ lean the Impression & .ransfer ylinder gripper serrations

    -/ lean feed & discharge no;;le for coolong water tanks

    -0 lean the separtor %otary 3alve

    -1 Inspect the Feeder pile ,p4'own chain

    -2 hange the feeder pump air filter"/888 hrs:#-5 Inspect the Inking System drive chain tension:-6 Inspect the delivery pile ,p4'own chain-7 Inspect the chain gripper chain elongation+8 Ad)ust chain gripper

    +- Inspect seprator drive universal )oint

    ++ Inspect the sidelay & Frontlay tips+/ lean the printing unit chase oil tank+0 Inspect the powder spray timing valve+1 %eplace the delivery chain lubrication pump filters

    +2 %eplace the delivery ring blower filters+5 %eplace the pan oil"Lubricant#

    lean gripper shaft for Impression *.ransfer*Swing and'elivery

    Inspect

  • 7/25/2019 PM Check List

    6/10

    Responsibility Rearks

  • 7/25/2019 PM Check List

    7/10

    r$ week(1, HRS.)

    S.*o. Contents Responsibility

    - lean the static eliminator electrodischarge bar:

    + lean the delivery fan:

    /

    0

    1

    2

    5

    6

    7 Inspect the delivery )am4up detector:

    -8 Inspect the board insertion board thrusting limit:

    -- lean the delivery fan upper part:

    -+ Inspect the activation of S.

  • 7/25/2019 PM Check List

    8/10

    +-Inspect the delivery pile upper* lower and -88mmlimit switch:

  • 7/25/2019 PM Check List

    9/10

    Rearks

  • 7/25/2019 PM Check List

    10/10