February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India3
■ HV-CONNEX Plug-in Bushings
■ MV-CONNEX Multiple Transformer Bushings
■ MV-CONNEX Separable Connectors
■ MV-CONNEX Surge Arresters
Power Transformers (outdoor)Our Solutions for
4
Public energy grids are our core markets since
almost 100 years.
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India6
CONNEX – Reliability and Safety with the Pluggable
Bushing and the Surge Arrester
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India7
An Universal Connection Interface
Designed not only to meet cable standards, the CONNEX socket is an integral part of the
transformer world
Cable termination
Testing: IEC 60840 and IEC 62067
TransformerTesting: IEC 60137Housing: EN 50299
GISTesting: IEC 62271-203Housing: IEC 62271-209
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India8
CONNEX Technology– high voltage
Size 4 Size 5-S Size 6 Size 6-S
Um 72.5kV 145kV 170kV 245kV
IN 2500A 2500A 2500A 2500A
Cross section* 1600 mm² 1600 mm² 2500 mm² 2500 mm²
Max. diameter over
conductor/insulatio
n
55.4 mm/
78.0 mm
55.4 mm/
76.0 mm
64.9 mm/
110.5 mm
64.9 mm/
113.5 mm
* Valid only, if values comply to max. diameter over conductor/max. diameter over insulation
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India9
CONNEX Plug in Contacts – extra high voltage
Size 7
245 – 362 kV
3000 mm2
4000 A
Size 8
362 kV – 420 kV
3000 mm2
4000 A
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India10
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
MV & HV CONNEX Plug in Terminations inHorizontal Position
11
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Connecting Principle - High Voltage (Um = 52..245 kV)
Air insulated Conventional Type / Wet Type Pluggable Dry-Type / CONNEX
Bare conductor Epoxy Insulator with Oil Filling Metal enclosed / touch proof
Frame construction needed Transformer compartment has to
be opened for assembly
Separation of Cable System and
Transformer in view of Assembly
and testing
Prevention against animals must
be taken
Relatively High Assembly Time Integration of Epoxy Insulator in
Transformer as an Interface
Space requirement very high Dielectric test of cable system
only with additional effort
feasible
Dielectric test of cable system
and transformer feasible
Medium Flexibility Low Flexibility Highest Flexibility
12
Principle & Function of the CONNEX pluggable
system
Figure 2: Example of a pluggable system UM = 550kV
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India13
Assembly directly on the cable
Compartment has to be opened
Treatment of oil
Expansion box necessary in horizontal
application
Motivation: conventional type vs. plug-in dry-type
transformer
compartment
Conventional type Plug-in dry-type
Transformer compartment completely closedand sealed at manufacturing site
Testing of transformer at manufacturing site
No expensive oil works on site
Quick assembly
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India14
Comparison
ESU 145 - V CONNEX Size 5-S 145kV
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India15
HV-CONNEX Pluggable Bushings
Initially designed for testing purposes, pluggable bushings were introduced
already 20 years ago
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India16
■ For conventional bushing, field control
inside and outside transformer is in one
piece
■ Pluggable bushings have two parts. One
integrated in the transformer (socket), the
other consists of the conventional part
and a plug connector
■ Socket is permanently installed in the
transformer and air and oil tight
■ Bushing is connected by plugging in
■ Connection is done automatically in the
socket during the plugging process
Principle of a pluggable HV-CONNEX Bushing
Bushing
Connector
Socket
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India17
■ Flexibility even for high voltage equipment
becomes more and more important
■ Very short connection and disconnection time
■ No oil or gas works on site due to dry system
■ Connection of Transformer by cable or
overhead line is interchangeable
■ Complete range of pluggable components
available
■ Sockets are pre-installed into the transformer
Benefit of a pluggable Bushing
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India18
The Bushing Advantages
■ Based on the proven technology of dry
RIP-Transformer bushing is designed for
Pfisterer socket CONNEX size 5-s, 6, 6-S,
7 and 7-S (145 kV up to 362 kV Umax)
■ Very compact dimensions
■ Heatpipe technology for higher currents
applicable
■ Oil and gas tight system
■ Core can be fixed to flange
■ No loss of insulation media
■ Operates with damaged housing
temporarily
■ No loss of insulation media
Pluggable Bushing Advantages
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India19
■ Short on site installation time with factory
tested components
■ Time Savings of 75%
■ Installation position can be freely selected
■ Compact design allows smaller
connection compartment
■ Maintenance free
■ Touch proof for maximum safety
■ Water tight and offshore proved
■ Individual installation instruction for all
cable types
Benefits of CONNEX
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India20
■ Transformer completed for Acceptance
Test at factory
■ Final configuration as later on site
■ Tests can be done as with conventional
bushings
■ Transformer stays sealed during transport
Tests at factory site
Fully pluggable transformer on HV and MV side
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India21
Preparing for
Plugging
■ Tests in High
Voltage Test
Laboratory
■ Combined test of
bushing and
PFISTERER
socket, IEC 60137
■ Test values cover
IEC and IEEE,
ANSI Test Tap
available
Laboratory Tests
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India22
Innovation in Protection –
Pluggable solid insulated Surge Arrester
HV-CONNEX Surge Arrester Size 4 up to Umax 72.5
kV
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India23
Innovation in Protection –
Pluggable solid insulated Surge Arrester
HV-CONNEX Surge Arrester Size 5-S up to Umax 145
kV
News: HV-CONNEX Surge Arrester Size 6 up to UC =
144 kV (Ur = 180 kV) will be available April 2017
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India24
Plug including contact and
insulating part
Polymer insulating part incl.
field gradingFRP tube housing
Head flange incl. pressure release
system
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India25
Schedule of Test
Type test based on IEC 60099-4
Nominal discharge current (8/20 µs) 20 kA
Line discharge class 4
Dielectrical Test
Power frequency voltage test 275 kV
Lightning Impulse test (1.2/50 µs) 650 kV
Partial discharge test 1.05 * Uc
(<10 pC)
Short circuit test
Rated short circuit test (0.2 s) 40 kA
Reduced short circuit test (0.2 s) 25 kA, 12
kA
Operating duty test (Accelerated aging
procedure, Conditioning tests
and Operating duty test
HV-CONNEX Separable Surge Arrester
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India26
State of the Art:
Gas insulated Surge Arresters
■ Costly
■ Relatively long assembly time
■ A lot of space required
■ Complex assembly
HV-CONNEX Surge Arrester
Our approach …
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India27
HV-CONNEX Surge Arrester – Compact Design
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India28
GIS
Pluggable
AIS
Advantages & Benefit of HV-CONNEX Pluggable SA
series
+ No Frame construction
needed+ Space requirement
+ Minimum influence by
climatic conditions+ Optimum distance to the "hot
spot"+ Encapsulated - touchproof
systems
− Complex assembly
− Assembly time− FAT testing of equipment− testing of equipment at site− Monitoring, Regulations
Pressure Vessels,
Maintenance needed− In the event of an
breakdown, relatively long
down time
+ Easy assembly+ Quick Assembly
+ FAT testing of equipment
with minimal effort+ testing of equipment at site
with minimal effort
+ Monitoring, Maintenance not
needed+ In the event of an
overvoltage, relatively short
down time
− Frame construction needed− High space requirement
− Huge influence by climatic
conditions− Positioning crucial− Air insulated not touchproof
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India29
Country: any
Voltage level: up to Um = 245kV
Year: any
Description: Final test after cable installation and
accessory installation.
Using same interface for testing as for use.
Mobile HV generator built on trucks have to be
connected rapid and without complicated
procedures, ideally completely touch proof due to
safety issues. Using preassembled and tested
test equipment.
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study – Mobile test setup
Test joint Pre-assembled test cableTest truck in front of transformer
30
Country: Germany
Quantity: 3 substations
Base Parameters: Refurbishment of
substation due to urbanization
scheduled within 5 years.
Connection to an existing Overhead
Line (OHL).
Connection to a cable system as part
of the refurbishment.
Task: Reduction of down time.
Change of connecting elements from
OHL to cable without oil works at the
transformer.
Solution: Transformer equipped with
sockets as an interface, exchange of
connecting elements February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study EON Westfalen Weser
31
Country: any
Voltage level: up to Um = 170kV
Year: any
Description: Major events and Black Outs require
temporary power supply.
Mobile substation built on trucks have to be
connected rapid and without complicated
procedures, ideally completely touch proof due to
safety issues
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study – Mobile SubstationMobile Substation -
Italy
Mobile Substation -
Spain
32
Country: Canada
Voltage level: up to Um = 145kV
Year: any
Description: Padmount transformers
Transformer to be shipped completely assembled
(no onsite testing and oil processing required).
HV cable termination to be pre-assembled.
Short circuit tested design.
Safe for and from the public.
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study Canada – Padmount Transformers
33
Country: any
Voltage level: up to Um = 245kV
Year: any
Description: Wind farms require Off Shore
substations / transformer platforms.
Offshore Certification required
Special demand on material and components
Specially trained personnel required
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study – Offshore
34
High-Voltage Field-Installation Cables – Secure and
Reliable System Operation in Cases of
Reconstructions and Incidents from 145 kV to 362 kV
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India35
IXOSIL ESS cable termination
Technical data
Maximum nominal current limited only by the high-voltage
cable
Maximum operating voltage Um = 300 - 420 kV
Cu or Al conductors up to 2500 mm2
Tested according to IEC 62067
Pollution class (65 mm/kV) according to IEC 60815
Highest mechanical stability due to glass fiber
reinforced hollow insulator
Silicon shielding for ideal water-repellent behavior
Installation of overhead line conductors without
special tools thanks to SICON bolted technique
Maintenance-free
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India36
IXOSIL MSA slip-on joint
Technical data
Maximum nominal current limited only by the high-
voltage cable
Maximum operating voltage Um = 300 - 420 kV
Cu or Al conductors up to 2500 mm2
Tested according to IEC 62067
Simple installation due to proven
slip-on system
The patented SICON bolted
connection
allows easy and safe installation of
the conductor
Customized cable shielding
February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India37
The network is changing and higher voltages and increased power
transmission require new solutions
Liquid and gasous insulation is minimized and if possible