Open House WELCOME February 28, 2013 PLESSIS ROAD Underpass

Upload: others

Post on 20-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

Open House

WELCOME

February 28, 2013

PLEssis ROadUnderpass

Page 2: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Welcome

The Plessis Road Underpass Open House is your opportunity to: » Review the conceptual design of the project.

» Review the construction process.

» Ask questions of the project team.

» Provide comments or concerns you may have.

1

Page 3: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Project Background

» The City`s 2012 capital budget identified $77-million for the Plessis Road twinning and grade separation at the CN Rail Redditt subdivision, including cost-sharing between the Federal (Building Canada Fund; $25-million), Provincial ($25-million) and City ($27-million) governments.

» The project will involve twinning Plessis Road between Dugald Road and Pandora Avenue W. and constructing an underpass at the CN Rail Redditt subdivision.

» Plessis Road, within the project area, is the highest volume two-lane street in the city and a priority for widening.

» The combination of limited street capacity and train movements results in congestion in the area.

» The City of Winnipeg is coordinating the design and construction of the project in conjunction with local engineering firms and contractors:

• AECOM / Dillon is responsible for the design of the project

• MMM Group is facilitating the public engagement process

2

Page 4: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass

CN

Rail

Kernaghan ave.

Barry ave.

Peake ave.

Pandora ave. W.

Mission Gardens

Paul Martin d

r.

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

stewn ave.

Robson st.

Pandora ave. W.

Crescent Multi-Foods

TransconaCountry

Club

Transcona Golf

Course

East sideself storage

Freshwater FishCorporation

GraceCanadianReformed

ChurchLocation of Future Plessis

Underpass

Location of UnderpassN

Birch G

rove

3

Page 5: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Project Benefits

The project will provide for the safe and efficient movement of vehicles, pedestrians and cyclists in the area. Following completion, benefits of the project will include:

» Elimination of delays at the rail crossing

» Improved response times for emergency vehicles

» Improvements to the Active Transportation sidewalk and bike path network

» Improved traffic flow by twinning Plessis Road between Pandora Avenue W. and Dugald Road and adding auxiliary lanes at the Dugald Road intersection

4

Page 6: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Project Components

Construction activities include: » Relocating existing utilities

» Roadway improvements along Plessis Road between Pandora Avenue W. and south of Dugald Road

» New rail bridge

» Adding new land drainage for the Underpass

» Creating new Active Transportation facilities

» Relocating Imperial Oil Limited and Shell Canada pipelines

» Constructing a temporary rail diversion

» Road closures and alternate routes during construction

» Temporary bus services and pedestrian movements during construction via Plessis Road; bus service will be provided on alternate routes

5

Page 7: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Underpass & Roadway Plan

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238

239

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238

239

BASE OF RAIL

EXISTING GROUND

CONTROL LINE PROFILE SOUTHBOUND(NORTHBOUND SIMILAR)

1.6

PROPOSED CN BRIDGESTRUCTUREEXISTING

DUGALD RD

EXISTING KERNAGHAN AVE

5.2

(MIN

CLE

AR

AN

CE

)

1+700 1+720 1+740 1+760 1+780 1+800 1+820 1+840 1+860 1+880 1+900 1+920 1+940 1+960 1+980 2+000 2+020 2+040 2+060 2+080 2+100 2+120 2+140 2+160 2+180 2+200 2+220 2+240 2+260 2+280 2+300 2+320 2+340 2+360 2+380 2+400 2+420 2+440 2+460 2+480 2+500 2+520 2+540 2+560 2+580 2+600 2+620 2+640 2+660 2+680 2+700 2+720 2+740 2+760 2+780 2+800 2+820 2+840 2+860 2+880 2+900 2+920

4.00%

0.50%

-5.75%

-1.50%-1.14%0.57%-0.54%0.30%

-0.60%0.52% -0.51%

STA

= 1

+969

.96

ELE

V =

233

.185

STA

= 2

+010

.00

ELE

V =

233

.305

STA

= 2

+020

.20

ELE

V =

233

.250

STA

= 2

+029

.00

ELE

V =

233

.300

STA

= 2

+042

.00

ELE

V =

233

.152

STA

= 2

+620

.03

ELE

V =

232

.332

STA

= 2

+650

.00

ELE

V =

232

.153

STA

= 2

+775

.00

ELE

V =

232

.803

STA

= 2

+848

.70

ELE

V =

232

.424

LOW PT STA: 73+84.92LOW PT ELEV: 737.68

PVI STA:2+242.17PVI ELEV:223.69

K:10.00LVC:97.50

BV

CS

: 2+1

93.4

2B

VC

E: 2

26.4

97

EV

CS

: 2+2

90.9

2E

VC

E: 2

25.6

44

HIGH PT STA: 24+77.00HIGH PT ELEV: 231.62

PVI STA:2+435.00PVI ELEV:231.41

K:24.00LVC:84.00

BV

CS

: 2+3

93.0

0B

VC

E: 2

29.7

27

EV

CS

: 2+4

77.0

0E

VC

E: 2

31.6

17

HIGH PT STA: 20+56.29HIGH PT ELEV: 232.94

PVI STA:2+090.29PVI ELEV:232.43

K:16.00LVC:68.00

BV

CS

: 2+0

56.2

9B

VC

E: 2

32.9

38

EV

CS

: 2+1

24.2

9E

VC

E: 2

30.4

73

N

P:\5

5121

00-5

5121

99\5

5121

55 -

Ple

ssis

Und

erpa

ss O

wne

rs E

ngin

eer\D

raw

ings

\MM

M D

wgs

\551

2155

-Und

erpa

ss C

ross

Sec

tion.

dwg

PLESSISUNDERPASS STUDY

FIGURE 2 SPAN SINGLE TRACK TPG OPTIONCAISSON FOUNDATION

CS13

RIGHTTURNLANE

THRULANE

THRULANE

LEFTTURNLANE

THRULANE

THRULANE

ACCEL./MERGE

LANECN

Rail

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

Underpass Cross-section

Kernaghan ave.

Barry ave.

Peake ave.

New dry Pond

New Liftstation

New sidewalk

New Traffic Lanes

New Median

Multi-UsePath

New second Left Turn Lane

New acceleration

Lane

New deceleration

Lane

Pandora ave. W.

FuturePlessis Road

Twinning

south Elevationscale 1:300

New Retaining

Wall

6

Page 8: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass active Transportation

» There are two existing Active Transportation paths in the project area:

• The Pandora Path, located on Pandora Avenue W. between Plessis Road and Day Street

• The South Transcona Community Path, which runs along Dugald Road between Borden Avenue and Terracon Place

» The proposed multi-use path will be similar in design to those along other major routes in Winnipeg.

» During construction, pedestrian and bicycle traffic will be suspended on Plessis Road between Dugald Road and Kernaghan Avenue.

» A sidewalk will be constructed on the west side of Plessis Road between Pandora Avenue and Dugald Road.

7

Page 9: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass active Transportation

CN

Rail

Kernaghan ave.

Barry ave.

Peake ave.

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

stewn ave.

Birch G

r.

Robson st.

Pandora ave. W.

New dry Pond

New Liftstation

Pandora Path

south Transcona Community Path

south Transcona Community Path

P:\5

5121

00-5

5121

99\5

5121

55 -

Ple

ssis

Und

erpa

ss O

wne

rs E

ngin

eer\D

raw

ings

\MM

M D

wgs

\551

2155

-Und

erpa

ss C

ross

Sec

tion.

dwg

PLESSISUNDERPASS STUDY

FIGURE 2 SPAN SINGLE TRACK TPG OPTIONCAISSON FOUNDATION

CS13

Underpass sidewalk & Multi-Use Path Cross-section

south Elevationscale 1:300

N

New Multi-Use PathExisting Multi-Use Path

New SidewalkExisting Sidewalk

Existing Sidewalk To Be Removed

8

Page 10: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass drainage Plans

» A new land drainage system is required to prevent water from accumulating below the underpass.

» A stormwater retention basin will be established to the west of the underpass. Water collected from the underpass will be redirected to the retention basin during precipitation events. The stormwater will be redirected to the City drainage system from the retention basin.

» The retention basin will be constructed concurrently with the underpass.

9

Page 11: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass drainage Plans

CN

Rail

CN

Rail

Plessis Rd.

Plessis Rd.

dugald R

d.d

ugald Rd.

Paul Martin d

r.

Robson st.

New dry Pond

New Liftstation

JEN - FYI

LAND DRAINAGE

UNDERPASS LDS (LAND DRAINAGE SYSTEM)

WASTEWATER SEWER

ABANDON LDS

Land Drainage

Underpass Land Drainage System (LDS)

Wastewater Sewer

Abandon LDS

To Existing Drainage

10

Page 12: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Utility Considerations

» Existing Imperial Oil Limited and Shell Canada pipelines will be re-aligned.

» Other utilities to be relocated include:

• Communication Lines

• Watermains

• Sewers

• Street Lights

• Power Lines

• Gas Line (abandoned)

11

Page 13: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Rail diversion

P:\5

5121

00-5

5121

99\5

5121

55 -

Ple

ssis

Und

erpa

ss O

wne

rs E

ngin

eer\D

raw

ings

\MM

M D

wgs

\551

2155

-CN

Tra

ck S

hoof

ly.d

wg

N

Temporary CN Rail

diversion(shoofly)

Ples

sis

Rd.

Ples

sis

Rd.

Existing CN Rail

Line

During construction, a temporary rail diversion, called a “shoofly”, will be constructed to re-route rail traffic. The shoofly will be removed following completion of the underpass.

12

Page 14: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Construction activites

» In order to complete construction by the end of 2014, a full closure of Plessis Road from Dugald Road to Kernaghan Avenue will be required during construction from July 2013 to the end of 2014 (local access to Mission Gardens will be maintained).

» Traffic flow will be monitored on an ongoing basis during construction.

» Ongoing discussions with Bernie Wolfe Community School are taking place with respect to traffic flow around the school grounds during construction.

PLE

SS

IS

RD

BARRY AVE

PEAKE AVE

KERNAGHAN AVE

RO

BS

ON

S

T

PLE

SS

IS

RD

PANDORA AVE W

DUGALD RD

PANDORA AVE W

PAUL MARTIN DR

PAUL MARTIN DR

RO

BS

ON

S

T

LOCAL ACCESS ONLYDURING CONSTRUCTION

CLOSED DURINGCONSTRUCTION

C.N.R. REDDITT

FUTURE UNDERPASSLOCATION

13

Page 15: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass alternative Routes » The closing of Plessis Road during construction is expected to increase traffic volumes on adjacent streets. The City`s

intent is to maximize the use of regional street alternatives (e.g., Regent Avenue W.) and minimize traffic increases on non-regional streets (e.g., Bournais Drive) without restricting access for local residents.

» Advance signage, at nearby major regional street intersections, will advise drivers of the road closure on Plessis Road and direct them to alternate regional street routes.

» Intersections on Plessis Road directly affected by the closure (Regent Avenue W., Pandora Avenue W. and Dugald Road) will have their traffic signals retimed. These changes will improve the flow of traffic and encourage drivers to stay on the regional street system.

RA

VE

NH

UR

ST

ST

DUGALD RD

PE

RIM

ETE

R 1

01 H

WY

PANDORA AVE W

PLE

SS

IS

RD

REGENT AVE W

LAG

IMO

DIE

RE

B

LVD

TRANS-CANADA HWY

PLE

SS

IS

RD

CONSTRUCTION ZONE

ALTERNATE ROUTES

SIGNAL RETIMING

REGIONAL INFORMATION SIGN

EXAMPLE REGIONALINFORMATION SIGN :

PLESSIS RDCLOSED

DUGALD RD TO PANDORA AVEJULY 2013 TO DEC 2014

14

Page 16: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Transit Routes

Winnipeg Transit routes will be temporarily modified to maintain service in the area. The re-routes will temporarily increase transit traffic on Bournais Drive and Pandora Avenue W.

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

ROUTE 87: SOUTH TRANSCONA - CROSSROADS STATION

ROUTE 49: DUGALD

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

BOU

RN

AIS

D

R

HO

KA

ST

PEAKE AVE

BARRY AVE

OW

EN

ST

HATCHER RD

REGENT AVE W

HATCHER RD

REGENT AVE W

DUGALD RD

ROUGEAU AVE

KERNAGHAN AVE

ATW

OO

D S

T

DEBAETS ST

RO

BS

ON

ST

DURAND RD

PANDORA AVE W

PLE

SS

IS

RD

CLOSED FOR UNDERPASSCONSTRUCTIOIN

BEG

HIN

AVE

ROUTE 87: SOUTH TRANSCONA - CROSSROADS STATION

ROUTE 49: DUGALD

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

ROUTE DURING CONSTRUCTION

ROUTE TEMPORARILY DISCONTINUED

15

Page 17: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass

2012 2013 2014

Project Start-Up(July 2012)

We Are Here

Construction Completed

(December 2014)

Preliminary Design Approved

Rail DiversionConstruction Start

(May 2013)

Preliminary DesignUnderpass & Roadway Construction

Project schedule

Detailed Design

Second Public Open House

16

Page 18: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Conceptual Future Plessis Road Twinning

6:1

3:14:1

6:1

EXIST.WEST ROW

3:1 4:1

FUTURESOUTHBOUND

FUTURENORTHBOUND

EXISTING ROAD

Existing Road

dug

ald

Rd.

Cam

iel s

ys s

t. N

Future southboundFuture Northbound

17

Page 19: PLEssis ROad Underpass - Winnipeg€¦ · UNDERPASS STUDY 2 SPAN SINGLE TRACK TPG OPTION FIGURE CAISSON FOUNDATION CS13 RIGHT TURN LANE THRU LANE THRU LANE LEFT TURN LANE THRU LANE

PLEssis ROadUnderpass Thank You

For further information on the project, please visit the City of Winnipeg’s website at:

http://winnipeg.ca/PlessisUnderpass

Or Contact:

Call 311 or email [email protected]

Thank you for attending, please fill out a comment form before you leave.

Please join us at the next open house in late spring 2013

18