S.A. TECHNOLOGIES PTE LTD PROJECT REFERENCE FOR PLC & SCADA System Another Quality Product from SATECH Client : Petronas Carigali Sdn Bhd (Schlumberger) Project : Bokor BODP-B ESP Project Completion Date : October 2010 Approx. Value : US$ 100,000.00 System Description Type : Integrated, Dual Redundancy SIL 3 PLC based Fire & Gas Panel Function : To monitor / control Fire Suppression System. Features : Dual Redundancy SIL 3 system for Zone 2 application. Configuration : Dual PLC controller and Ios Scope of Supply - Project management - Material selection and procurement. - Detail control logic analysis and design. - Installation and system wiring - Detail design for panel assembly - System assembly and production quality inspection. - Sizing calculation for utilities and system - System in-house simulation test power consumption - Factory acceptance testing. - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual Redundancy SIL 2 PLC Based Fire and Gas Panel Satech Project Reference List - PLC & SCADA System (Ed 140111)

Upload: others

Post on 28-Mar-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Petronas Carigali Sdn Bhd (Schlumberger)

Project : Bokor BODP-B ESP Project

Completion Date : October 2010

Approx. Value : US$ 100,000.00

System Description

Type : Integrated, Dual Redundancy SIL 3 PLC based Fire & Gas Panel

Function : To monitor / control Fire Suppression System.

Features : Dual Redundancy SIL 3 system for Zone 2 application.

Configuration : Dual PLC controller and Ios

Scope of Supply

- Project management - Material selection and procurement.

- Detail control logic analysis and design. - Installation and system wiring

- Detail design for panel assembly - System assembly and production quality inspection.

- Sizing calculation for utilities and system - System in-house simulation test

power consumption

- Factory acceptance testing.

- Detail configuration, setup and programming

of the controller - Final documentation (O&M Manual).

- Export packing & delivery.

Bokor Field Upgrade Dual Redundancy SIL 2 PLC Based Fire and Gas Panel

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 2: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Petronas Carigali Sdn Bhd (Schlumberger)

Project : Bokor Field Upgrade

Completion Date : October 2008

Approx. Value : US$ 100,000.00

System Description

Type : Integrated, Dual Redundancy SIL 3 PLC based Fire & Gas Panel

Function : To monitor / control Fire Suppression System.

Features : Dual Redundancy SIL 3 system for Zone 2 application.

Configuration : Dual PLC controller and Ios

Scope of Supply

- Project management - Material selection and procurement.

- Detail control logic analysis and design. - Installation and system wiring

- Detail design for panel assembly - System assembly and production quality inspection.

- Sizing calculation for utilities and system - System in-house simulation test

power consumption

- Factory acceptance testing.

- Detail configuration, setup and programming

of the controller - Final documentation (O&M Manual).

- Export packing & delivery.

Bokor Field Upgrade Dual Redundancy SIL 2 PLC Based Fire and Gas Panel

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 3: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Indorama Petrochem Ltd (Guardfire Ltd)

Project : Indorama PTA

Completion Date : February 2006

Approx. Value : US$ 400,000.00

System Description

Type : Integrated, Dual Redundancy SIL 2 PLC based control panels

Function : To monitor / control Fire and Gas System.

Features : HMI integrated for FGS system for refinary. System integration with deluge Systems,

Fire water pumps, etc. Modbus and Ethernet communication.

Configuration : Redundant CPUs Fire & Gas Detection system complete with one Engineering

Workstation and 4 nodes ethernet link to repeater panel.

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and equipment

mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual). Indorama PTA Project

- Export packing & delivery.

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 4: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Pak Arab Pipeline Co. Ltd. (China Petroleum, Eng. & Construction Corp.)

Project : White Oil Pipeline Project (WOPP)

Completion Date : November 2003

Approx. Value : US$ 600,000.00

System Description

Type : Integrated, designed to SIL 2 requirement PLC based control panels

Function : To monitor / control Fire and Gas System.

Features : HMI integrated for FGS system for refinary. System integration with deluge Systems,

Fire water pumps, etc. Modbus and Ethernet communication. Also integrated

with building FAP.

Configuration : Three systems, each comprising of PLC Fire Detection panel, workstation,

addressable fire alarm panel and all related field equipment.

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and equipment

mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

White Oil Pipeline Project (WOPP)

- Export packing & delivery.

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 5: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Korean National Oil Company (Baker Process)

Project : Donghae-1 Gas Project

Completion Date : October 2002

Approx. Value : US$ 50,000.00

System Description

Type : Integrated, continuous purged, PLC based control panels with motor starters

Function : To monitor / control the Seawater Electrochlorination .

Features : Facility for motors ESD shutdown from field actuators, 2 sets of duty standby

DC drives controlled pumps, 20 windows annunciator facilitate monitoring of

critical alarms, duty standby selectable operation, continuous purge system,

fuzzy logic tank level control.

Configuration : 2 panels comprising of 1 purged panel with PLC controller, motor starters, DC motor

drives, annunciator and related operator actuators and 1 transformer panel.

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and equipment

mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

- Export packing & delivery. Donghae-1 Gas Project

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 6: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Chevron Offshore (Thailand) Ltd. (Baker Process)

Project : Benchamas Upgrade Program COT / 2008

Completion Date : October 2001

Approx. Value : US$20,000.00

System Description

Type : Integrated PLC based control panel with motor starter control panel

Function : To monitor / control the Produce Water Media Filter Skid.

Configuration : 2 panels comprising of PLC Control panel and Motor Starter panel

Scope of Supply

- Project management - Material selection and procurement.

- Detail control logic analysis and design. - Installation and system wiring

- Detail design for panel assembly and equipment - System assembly and production quality inspection.

mounting.

- System in-house simulation test

- Sizing calculation for utilities and system

power consumption - Factory acceptance testing.

- Detail configuration, setup and programming - Final documentation (O&M Manual).

of the controller

- Export packing & delivery.

Benchamas Upgrade Program COT/2008 Control Panel

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 7: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Elf Petroleum Iran / National Iran Oil Corporation (Baker Process)

Project : Balal Field Development - PLQ

Completion Date : October 2001

Approx. Value : US$40,000.00

System Description

Type : Integrated PLC based control panels.

Function : To monitor / control the Seawater Strainers & Seawater Injection Filters System

Features : Facility for monitoring and operating via front panel mounted workstation, modbus

link to DCS is preconfigured and set

Configuration : 1 panel comprising of PLC controller and MMI workstation

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and equipment

mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

- Export packing & delivery.

Balal Field Development Control Panel

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 8: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : BP Vietnam (Baker Process)

Project : Nam Con Son Gas Project

Completion Date : November 2001

Approx. Value : US$50,000.00

System Description

Type : Integrated PLC based control panels with motor starters

Function : To monitor / control one (1) Electroclorinator skid

Features : Facility for motors ESD shutdown from field actuators, 1 set of duty standby

DC drives controlled pumps, 16 windows annunciator facilitate monitoring of

critical alarms, duty standby selectable operation

Configuration : 1 panel comprising of PLC controller, motor starters, DC motor drives and annunciator

and related operator actuators

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and equipment

mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

- Export packing & delivery.

Nam Con Son Gas

Electrochlorination Control Panel

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 9: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Chartered Semiconductor Manufacturing (US Filter Asia Pte Ltd)

Project : Chartered Semiconductor Fab7 - UPW System

Completion Date : November 2000

Approx. Value : US$20,000.00

System Description

Type : Integrated PLC based control panels with related operator actuators

Function : To monitor / control plant process control system.

Features : Facility for monitoring temperature, media flow, pressure via digital indicator mounted

on front of the panels

Configuration : 1 Master panel, 30 Local Control panels and 9 Remote Control panels

are linked via Controlnet network platform

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and

equipment mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration and setup

of digital indicators

- Material selection and procurement.

- Installation and system wiring

- System assembly and

production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

- Export packing & delivery.

Chartered Semiconductor Fab7 - UPW System

Local Control Panel (Typical)

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 10: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : Caltex Indonesia (Baker Process)

Project : Caltex Duri Sand Plant

Completion Date : August 1999

Approx. Value : US$100,000.00

System Description

Type : Integrated PLC based controllers with networking to monitoring workstations

Function : To monitor / control two (2) process control system.

Configuration : 2 sets of PLC controllers and 2 sets of workstations linked via DH+ network

platform

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and

equipment mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and

production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

- Export packing & delivery.

Satech Project Reference List - PLC & SCADA System (Ed 140111)

Page 11: PLC & SCADA System€¦ · - Detail configuration, setup and programming of the controller - Final documentation (O&M Manual). - Export packing & delivery. Bokor Field Upgrade Dual

S.A. TECHNOLOGIES PTE LTD

PROJECT REFERENCE FOR

PLC & SCADA SystemAnother Quality Product from SATECH

Client : De Nora Permelec Pte Ltd

Project : AL Shoaiba Power Station, KHI 357

Completion Date : December 1997

Approx. Value : US$100,000.00

System Description

Type : Integrated microprocessor based controller.

Function : To monitor / control three (3) chlorination generator group and its related instruments.

Configuration : 1 panel comprising of microprocessor based controller and monitoring station

Scope of Supply

- Project management

- Detail control logic analysis and design.

- Detail design for panel assembly and equipment

mounting.

- Sizing calculation for utilities and system

power consumption

- Detail configuration, setup and programming

of the controller

- Material selection and procurement.

- Installation and system wiring

- System assembly and production quality inspection.

- System in-house simulation test

- Factory acceptance testing.

- Final documentation (O&M Manual).

- Export packing & delivery.