Why Production Planning ?
Better Resource Utilization
Reduced Manufacturing Cycle
Minimize Throughput Time
Low Production Costs
Faster Delivery
Reduced Inventory
Better Customer Service
![Page 3: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/3.jpg)
What Plant Manager offers you ?
It offers you the Finite capacity planning and scheduling package, which
allows you to
Manage your resources optimally
Have greater visibility and control over manufacturing processes on day
to day basis.
Manage on time deliveries to the customer to his satisfaction
www.plantmanager.in Powered by
![Page 4: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/4.jpg)
Features of Plant Manager
Multiple operation capability of a workstation can be defined into the
system
Daily production capacities for different operations or combination of
operations can be defined for a workstation
Multiple resources for single operation can be defined
Sequence of operations for a raw material to convert it into a finished
product can be defined
Vendors, their resources and respective production capacities can be
defined
Human resource can be defined as individual work station
www.plantmanager.in Powered by
![Page 5: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/5.jpg)
The Plant Manager has three parts
Masters
Planning And Scheduling Part
Control Part
www.plantmanager.in Powered by
![Page 6: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/6.jpg)
Features : Planning & Scheduling Part
The planning & scheduling part allows you to
Set the priorities of the orders in hand
Use Gantt chart for scheduling the orders for different scenarios.
Schedule the orders on the basis of sequence of insertion , due dates,
priorities, combination of insertion date and priorities, combination of
due dates and priorities.
Identify and manage impact of high priority orders
Generate schedule for available machines considering their capacities on
daily basis
Facility of capacity calculator for each work station
www.plantmanager.in Powered by
![Page 7: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/7.jpg)
Features : Control Part
The Control part allows you to
Record shift wise production output at each workstation into the system
Manage the production at vendor site if any
Have quality control check if defined into the system on the production
quantity at both in-house and vendor site
It will not allow to override the sequence of manufacturing processes
already defined into the system for a particular product
Facility of Shift Management
www.plantmanager.in Powered by
![Page 8: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/8.jpg)
Differentiators of Plant Manager
www.plantmanager.in Powered by
![Page 9: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/9.jpg)
Resource Settings
The resource capacities can be defined for individual operation or
combination of multiple operations into the system. Hence if a machine
is doing multiple operations on a product in one setup, we can define the
combined capacity for all those operations and ultimately can record the
production against those combined operations.
The machine capacities can be set machine wise or product wise. i.e.
They can be set depending on the product to be manufactured on a
particular machine or irrespective of the product.
For a product to manufacture, the capacities can be set as combination of
machine wise or product wise settings for different processes in the
manufacturing cycle.
www.plantmanager.in Powered by
![Page 10: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/10.jpg)
Planning Settings
The planning can be done individually or for set of orders.
The settings page has facility to sort the orders to be planned on the basis
of due date, order insertion sequence, priority, combination of due date
and priority and combination of insertion sequence and priority.
The priorities are created automatically while sorting and will be in the
multiple of 10.
The order having priority 10 will have highest priority and will be
planned first and as the number increases the order priority will decrease
and will be given preference sequentially during planning.
As mentioned earlier the orders can be sorted for planning purely on the
basis of due date, order insertion sequence and priority.
www.plantmanager.in Powered by
![Page 11: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/11.jpg)
Planning Settings
The combination of due date and priority: The orders will be first sorted
on the basis of due date which will have some fixed priorities and these
can be altered specific to one or more orders to move them ahead or
behind while scheduling.
The combination of insertion sequence and priority: The orders will be
first sorted on the basis of insertion sequence which will have some fixed
priorities and these can be altered specific to one or more orders to move
them ahead or behind while scheduling.
To change the sort order of an order, in-between number of the priorities
can be chosen.
www.plantmanager.in Powered by
![Page 12: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/12.jpg)
Planning Settings
As many iterations can be done for an order or set of an orders during
planning on the Gantt chart before finalizing the schedule.
The facility to un-plan an order or set of orders is provided on the
planning page itself so as to make it more user-friendly.
The orders can be scheduled on the basis of material availability or
tentative material availability date.
The types statuses of the orders in the system are Pending, Scheduled
and in process and complete.
The pending status indicates that the order is not taken for planning.
www.plantmanager.in Powered by
![Page 13: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/13.jpg)
Settings Page
The option, not to schedule the orders for which material is not available
is also provided if required on the settings page.
The orders for which material is not available and are scheduled can be
swapped if the material does not come on the date already mentioned, by
number of days mentioned on the settings and the following order can be
preponed as and when required.
Powered bywww.plantmanager.in
![Page 14: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/14.jpg)
Gantt chart
The Gantt chart displays the resource, the process and the quantities to
be processed in corresponding duration.
The quantities mentioned on the Gantt chart are being reflected directly
on the production page which will enable the production department to
act on it directly as mentioned therein.
All orders are displayed with separate colors for easy identification.
Powered bywww.plantmanager.in
![Page 15: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/15.jpg)
Production Page
Since there are validations and compulsion to transfer the material from
one process to another process after its completion, there is complete
control over the production system and ultimately on the inventory.
The rescheduling of the orders scheduled can be done only if all the
production data inputs are given. Hence it is necessary to input all the
production data or mention the reasons if any to go for rescheduling.
The rework quantities will be rescheduled next day and new order will
be placed automatically for rejected quantities.
Powered bywww.plantmanager.in
![Page 16: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/16.jpg)
Other Important Features
Comparison of actual production against scheduled quantity on daily
basis at individual work stations
Daily, Weekly, Monthly reports on machine utilization ,employee output,
rework and rejection
Alerts to the corresponding team members in case of material stuck-up
Roles definition and Login/passwords.
Drawing attachment facility to have better control over the processes
Powered bywww.plantmanager.in
![Page 17: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/17.jpg)
Features
Powered bywww.plantmanager.in
Administration
Company Details
System Settings
Departments
Profile Settings.
• Roles
• Users
• Privileges
Vendor Master
Resource (Machine) Master
• Machine Capability
• Machine Details
Customer Master
Raw Material Master
– Add Unit
Product Master
– Product Categories
– Product Details
Shift Master
Holiday Master
Operator Master
![Page 18: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/18.jpg)
Features
Powered bywww.plantmanager.in
Customer Section
• Order Inputs
• Completed Orders
Stores
• Material Availability
Planning
• Order Planning (Scheduling)
• Order Status
Production
• Daily Production Input
Quality Control
Reports
• Production Report
• Product wise order status
• Order wise status report
• Rejected Item Report
• Production Report (Raw
Material Wise)
• Material Status (Vendor)
![Page 19: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/19.jpg)
Powered bywww.plantmanager.in Powered bywww.plantmanager.in
• The PO will be in the name of CNCTimes Pvt. Ltd., Building No. 3,
Shripal Industrial Estate, Behind Varun Industries, Dist. Vasai, Thane.
• 100% advance payment along with the Purchase Order.
• Prices valid till 15 Days from the date of proposal.
• All Support will be provided online.
Terms And Conditions
![Page 20: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/20.jpg)
Screen-shot - www.plantmanager.in
Powered bywww.plantmanager.in
![Page 21: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/21.jpg)
Screen-shot - Login Page
Powered bywww.plantmanager.in
![Page 22: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/22.jpg)
Screen-shot - Plant Manager Menu
Powered bywww.plantmanager.in
![Page 23: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/23.jpg)
Screen-shot - Company Details
Powered bywww.plantmanager.in
![Page 24: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/24.jpg)
Screen-shot - System Settings
Powered bywww.plantmanager.in
![Page 25: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/25.jpg)
Screen-shot - Department Master
Powered bywww.plantmanager.in
![Page 26: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/26.jpg)
Screen-shot - Roles Master
Powered bywww.plantmanager.in
![Page 27: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/27.jpg)
Screen-shot - Users
Powered bywww.plantmanager.in
![Page 28: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/28.jpg)
Screen-shot - Privileges
Powered bywww.plantmanager.in
![Page 29: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/29.jpg)
Screen-shot - Customers Master
Powered bywww.plantmanager.in
![Page 30: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/30.jpg)
Screen-shot - Vendor Master
Powered bywww.plantmanager.in
![Page 31: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/31.jpg)
Screen-shot - Machine Capabilities
Powered bywww.plantmanager.in
![Page 32: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/32.jpg)
Screen-shot - Machine Details
Powered bywww.plantmanager.in
![Page 33: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/33.jpg)
Screen-shot - Raw Material Master
Powered bywww.plantmanager.in
![Page 34: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/34.jpg)
Screen-shot - Raw Material Unit Master
Powered bywww.plantmanager.in
![Page 35: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/35.jpg)
Screen-shot - Product Categories Master
Powered bywww.plantmanager.in
![Page 36: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/36.jpg)
Screen-shot - Product Details
Powered bywww.plantmanager.in
![Page 37: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/37.jpg)
Screen-shot - Shift Master
Powered bywww.plantmanager.in
![Page 38: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/38.jpg)
Screen-shot - Shift Assignment
Powered bywww.plantmanager.in
![Page 39: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/39.jpg)
Screen-shot - Holiday Master
Powered bywww.plantmanager.in
![Page 40: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/40.jpg)
Screen-shot - Order Input
Powered bywww.plantmanager.in
![Page 41: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/41.jpg)
Screen-shot - Completed Orders
Powered bywww.plantmanager.in
![Page 42: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/42.jpg)
Screen-shot - Material Availability
Powered bywww.plantmanager.in
![Page 43: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/43.jpg)
Screen-shot - Order Planning
Powered bywww.plantmanager.in
![Page 44: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/44.jpg)
Screen-shot - Capacity Setting Page
Powered bywww.plantmanager.in
![Page 45: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/45.jpg)
Screen-shot - Order Status
Powered bywww.plantmanager.in
![Page 46: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/46.jpg)
Screen-shot - Daily Production Input
Powered bywww.plantmanager.in
![Page 47: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/47.jpg)
Screen-shot - Gantt Chart
Powered bywww.plantmanager.in
![Page 48: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/48.jpg)
Screen-shot - Quality Control Input
Powered bywww.plantmanager.in
![Page 49: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/49.jpg)
Screen-shot - Daily Production Schedule
Powered bywww.plantmanager.in
![Page 50: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/50.jpg)
Screen-shot - Daily Production Report
Powered bywww.plantmanager.in
![Page 51: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/51.jpg)
Screen-shot - Production Report
Powered bywww.plantmanager.in
![Page 52: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/52.jpg)
Screen-shot - Process wise Schedule
Powered bywww.plantmanager.in
![Page 53: Plant Manager Production Planning and Control](https://reader036.vdocuments.mx/reader036/viewer/2022062310/588af8991a28abf8548b5af9/html5/thumbnails/53.jpg)
Virendra Rale
CNCTIMES.COMGokulam, First Floor, Plot No.: 59 + 60, Survey No. 150/7,
Lane No.:1, Prathamesh Park, Balewadi, Baner,
Pune – 411 045, Maharashtra, India. Cell : +91 77188 31474
Email : [email protected] | www.plantmanager.in