plans by rogue engineer… · 2018. 6. 8. · plans by rogue engineer dimensions: 48" x...
TRANSCRIPT
P L A N S B Y R O G U E E N G I N E E R
D I M E N S I O N S : 4 8 " X 3 7 ½ " X 2 4 " ( C L O S E D. 9 6 " W O P E N ) D I F F I C U LT Y L E V E L : A D V A N C E D
CONCEALED BARCONSOLE TABLE
P L A N S B Y R O G U E E N G I N E E R PA G E : 2
TOOLS
ADDITIONAL REQUIRED ITEMS
PURCHASE LIST:
REQUIREDCircular Saw and/orJig SawMiter SawDrill/Driver
OPTIONALBrad NailerTable Saw
(2) 3/4" x 4’ x 8’ Hardwood Plywood(1) 1" x 2" x 8’ Board(6) 3" Casters(4) 30” Continuous HingeCabinet Knob/Pull (optional)1¼” Washer Head Screws1¼” Wood Screws (if not using Brad Nailer)1¼” Brad Nails (optional)Wood Glue
Tape MeasurePencilSafety GlassesHearing Protection
P L A N S B Y R O G U E E N G I N E E R PA G E : 3
LUMBER CUT LIST:48"
46½
"
24"
24"
11" 24¼"18"
5¾" 5¾" 5¾" 5¾" 14¾"
3½
"
5"
5"
18"
18"15"15"
6" 6"
18"
18"
CENTER BLADEON 24"
BOTTOM
CONSOLESHELF
CONSOLESHELF
CONSOLEVERTICAL
CONSOLEVERTICAL
SCRA
P
SCRAP
BA
R D
OO
R S
IDE
BA
R D
OO
R S
IDE
BA
R D
OO
R S
IDE
BA
R D
OO
R S
IDE
BA
R D
OO
RTO
P/B
OTT
OM
BA
R D
OO
RSH
ELF
BA
R D
OO
RSH
ELF
BA
R D
OO
RTO
P/B
OTT
OM
BA
R D
OO
RTO
P/B
OTT
OM
BAR DOOR FRONT EDGES
BA
R D
OO
RTO
P/B
OTT
OM
BACK
SIDE SIDE
BAR DOOR BACKBAR DOOR BACK
TOP LEAF
LEAF
UPPER SHELF
¾" X 4’ X 8’ HARDWOOD PLYWOOD
1" X 2" X 8’
11"
25"
22
7 / 16"
227/16"
227/16" 227/16" 227/16" 227/16"
227/16"
22
7 / 16"
22
7 / 16"
25¼" 25¼"
12"
23½
"
SCRAP
P L A N S B Y R O G U E E N G I N E E R PA G E : 4
ASSEMBLY:
HELPFUL HINTPrior to assembly, any exposed plywood edges should be edge banded. Also consider your finish and how to work that into the assembly most efficiently.
1 ASSEMBLE BASE
Layout a natural curve (same on both sides). Then, using a jigsaw cut out bottom as shown.
19"
6"
6"
6"
BOTTOM
SIDE
SIDE
TOP
BACK
Assemble the base as shown using wood glue and 1¼” screws (pre-drill holes using 7/64” drill bit) or use brad nails (not all shown).
P L A N S B Y R O G U E E N G I N E E R PA G E : 5
2 INSTALL CONSOLE
Apply wood glue and place upper shelf and verticals, check square and secure with 1¼” screws (pre-drill holes using 7/64” drill bit) or use brad nails. Then, install shelves with wood glue and 1¼” screws or brad nails.
15"
8¾"
8¾"
15"
CONSOLESHELF
CONSOLESHELF
CONSOLEVERTICAL
CONSOLEVERTICAL
UPPER SHELF
Start by attaching the upper shelf and vertical panels using wood glue and 1¼” screws (pre-drill holes using 7/64” drill bit) or use brad nails.
P L A N S B Y R O G U E E N G I N E E R PA G E : 6
3 INSTALL CASTERS AND DOOR
Trim door as required to fit, edge band, install knob or drill hole and install using desired hinges.
P L A N S B Y R O G U E E N G I N E E R PA G E : 7
4 ASSEMBLE BAR DOOR #1
Assemble the door as shown using wood glue and 1¼” screws (pre-drill holes using 7/64” drill bit) or use brad nails (not all shown).
BAR DOOR SIDE
BAR DOOR SIDE
BAR DOORSHELF
BAR DOORTOP/BOTTOM
BAR DOORTOP/BOTTOM
BAR DOOR FRONT EDGE
BAR DOOR FRONT EDGE
BAR DOOR BACK
9¼"
1½"GAP
P L A N S B Y R O G U E E N G I N E E R PA G E : 8
5 ASSEMBLE BAR DOOR #2
Assemble the door as shown using wood glue and 1¼” screws (pre-drill holes using 7/64” drill bit) or use brad nails (not all shown).
BAR DOOR SIDE
BAR DOOR SIDE
BAR DOORSHELF
BAR DOORTOP/BOTTOM
BAR DOORTOP/BOTTOM
BAR DOOR FRONT EDGE
BAR DOOR FRONT EDGE
BAR DOOR BACK
127/8"
1½"GAP
P L A N S B Y R O G U E E N G I N E E R PA G E : 9
6 ATTACH DOOR CASTERS
Secure 3½” x 6” spacers using wood glue and 1¼” screws (pre-drill holes using 7/64” drill bit) or use brad nails. Then, install casters using 1¼” washer head screws.
7 INSTALL BAR DOORS
Cut continuous hinges to 25”. Shim doors to correct height, then pre-drill and install hinges with included hardware.
11/8"SPACING FROM
EDGE
1/8" GAP FROM TOP
1/8" GAP FROM BOTTOM
CONTINUOUS HINGES CUT TO LENGTH
P L A N S B Y R O G U E E N G I N E E R PA G E : 1 0
8 INSTALL LEAFS
Cut continuous hinges to 18”. Pre-drill and install hinges with included hardware. Then add 1/8” thick bumpers to allow correct spacing when closed.
CONTINUOUS HINGES CUT TO LENGTH
LEAF
LEAF