PLANNING HEETI!«:

0900 5/3/79

l. Agenda, 0900, 5/3/79, Task Management/Schedule Meeting

2. Review Top Priorities List

3. Review .Action Items from "1800", 5/2/79, Technical Review Meeting

4. Review Taab Lists

Page 2: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

.. ·• !~.!.!~!

____ , ___ _

Task Kanag~t/Schedule Ueeting

0900 S/3/-79

1. Radioactive Releases

•> 748, 219

S/3/79

b) Vacuwa drav on Auxiliary Building ventheader and drain syst em

c) Auxiliary Building Fans

2. Plant Status - RCS Profile

3. Analytical:

a) Minimum secondary "water flov necessary to maintain natural circulation while in solid secondary circulation

b) ~n limit for Res

c) Temperature limit for BWST

d) Make up boron concentration to maintain 3000 ppm

4. Containment SUIIp Level

a) Elevation of DBR valve switches

b) Rec011111endation on !&R wiring modi!ication EQl

c) Critical it ... at elevations above DBR valves

d) Level measurement - piping runs/bubbler method

S. Solid pressurizer level benchmark test

6. Davis - Besse plant pressurizer level test

7. Mini-flov teat of uiating DBR system

8 . Construction Status:

a) Tank Farm in Unit 2 Spent Fuel Pool

b) Alternate System for solid circulation of OTSG

c) EPICOR (CAP-GUN II)

d) Reactor Coolant Preaaure/VolUIIe Control

e) Auxiliary Building roof ventilation system

f) DHR. upgrade

1) Alternate Decay Beat Removal System

Page 3: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

I -

i

I I i

.. . TOP PRIOJUnES

5/3/79

Development of plan for aanagement of radioactivity in A-l Auxiliary and Containmant ·Buildings.

Identify and isolate sourcas of iodine leakage. A-l

Collplete tank fana in Unit 2 spent fuel pool. A-1

Complete roof-top Stack Filtration System. A-2

Complete contingency plan for emergency cross-tie A-2 between the Auxiliary Building and Reactor Building Filtration System. ·

Completion of EPICOlt (CAP-ctJN II) System. A-2

Development of plan for treatment of Auxiliary Building B-1 liquid vaate.

Complete "B" OTSG cooling and modification (long-term). C-l

Upgrade Decay Beat ltemoval System. C-l

Develop and calibrate alterna~e pressurizer level C-l tranStiiJ.tter.

Developent of alternate system for pressure/volume C-1 control system.

Complete "A" OTSG cooling modification (lona-term). C-2

C011plete external valve pit for ADBR System. C-2

CATEGORY

Control (i.e., containment) of radioactivity in All'd liaey and Containment Buildings.

Recovery of Auxlliary Building to near normal operations.

C Place the plant in a cold condition auitable for depressurization vith long-term pressure/ volume control.

Page 4: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

5/3/79

Action Items

Technical Croup Meeting

1800 • 5/2/79

1. Reviae memo giving ill8tructiona/precautions to operations to ahov tb&t nut step vUl be to raise make up tank temperature. Bold bypass valve• at 84%.

2. ~check the ele~ation D~l. 2, 171 limit svitchea.

3. Detendne if there is an advantage to joggiDg the DBR valvea.

4. Continue to make up to RCS using 2000 PPM boron.

5. Recheck calculations of make up boron concentration for 0900 5/3. Include the effect of buildup in the pressurizer .

6. Verify RCS leakage vatar-steam split by checking the trending of RCS radio-isotopes and PB.

1. Plot vaste gas decay tank pressure.

8. Redo flov test vith an initial l gpm atiWI flov.

9. Detet"'lline vhy vacuum breakers on Awdliary BuildiDg roof ventilation system are opening. Ia the ductvork undersized?

10. Determine the best vay to drain 'A' steam line

ACTION

Wilson/ Herbein

Co bean

Co bean/ Wilson

Herbei.n

Wilson/ ICulynych

Wilson

Herbein

ICulynych

Wilson

Wilson/ Herbein/ Kulynych

Page 5: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

Paae 1 of 2 0800 5/3/79 •

PU..~ OPERATION s:t'AFF

Priority Er,lected Task Task Description ~let ion Status Coord.

1. Obtain RCS s~ple. C-1 To be scheduled Thorpe/ Be erick

2. PZR Bei.ae and diff. pr .. aure C-1 Correlaeing WUson/ aaae. re.adinae. Broughton

3. Obtain MEC approval (tie-in C-1 Need EQl I 8 13~ t Porter/ approval ollly). (B&R. Bald)' Faulkner/

035, 133, 148, Sulinger 172, 179, 180, 181, 182, 185, 141, 163, 170, 189, 191, 195, . 197, 204, 206, 214.

4. SSRW pumps. C-1 "A"-In Service Parts 5/04/79. "B"-Avai1able "C"-Under

Repair

5. Prepare instructions for loss C-1 Procedure Floyd/ of pand steam to turbine. iuued. Iunder - .. .

6. Be prepared to run ExisUn& C-l Expect to run Toole Decay Heat Pumps on Recirc:. "B" 5/3 a.m.

7. R.epair 2 secondary pllint leaks B-l In progress. co-V-53C Shovlin/ anJ clean up vater around c:ond. FW-V4B Iunder pumps. (Furmanite)

8. Get sec: . plant sump levels ltl.lllder dovn.

9. Drain OTSG "B" and process A-1 Start 4/30. On hold. lunder vater through CAP-GUN I.

~0. Isolate Unit 11 and 12 sample Need nev sample Limroth/ stations. sink. Seelinger

u. Trainin& on Diesel. In progress Troffer/ Jtunder/ . Toole

12. Training on Decay Heat. C-1 In progress Troffer/ Kunder/ Toole

. . .

----··-- --·---·-

Page 6: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

. Paa• 2 of 2 • 0800 S/3/19

Pt.A.'ll' OPE.~TION STAFF

£.'Qecud l"uk Tuk Descriotion Priority Co::toletion Status Coord.

13. Iasure HP-R-222 and 228 are Ongoing Lover sample ICunder c:Uibrated aad take daily rates . cartridge samples.

14. Sample AB/FHB charcoal beda. Jtuadu .

- ·~·

.

.

. .

-· -·~- -- .- ··- ---- ... --· ---- .... - · --·---··-· .... --·

Page 7: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

0800 S/3/79 •

P~~ MODIF!CATIONS

Task l ~eceed Task Desc:ri':)tfon Priorltv _Ce::lt»le:ion Status Coord.

WG-1 Install AB/FHB Filter system. A-1 Units 3 and Building com- Cunn/ 4 - SIS. plata by 5/5. Thorpe/

lachofar

~2 Dec:on. vater 1a AB udng EPICOR A-1 Turn over for Schedule being Co bean (L-1) ion exchange process. teat 5/5. revised.

Operational 5/-7.

~6 Install storage vessels in A-1 Operational Schedule Co bun/ (L-2) Fuel Pool "A". by S/9. slipping. CUlm

~ll Water Chemist~ Lab for A-1 System c:oc- Test run ~~&de Co bean use vith CAP-CUN (WG-2). p1ete by 5/4. vith temp.

power.

WG-12 Ventilation filtration systemfo A-1 System opera-decay hut pits. tional 5/4 .

TS-13 Install elec. heaters on Aux. A-2 Turn over for Bldg. intake duets. test S/4.

TS-3C Develop complete package for C-1 Instal. c:omp. Wilson/ loag-ter= cooling of OTSC "B". 5/8. Co bun Use Unit 12 Demins for long- - ::· ten system.

TS-6B RCS pressure control system. C-1 Turn over for Miller/ test 5/10. · LUly

·ts-6C Evaluate letdown capabilities C-1 To be scheduled for mod. to RCS.

TS-11 Develop electrical distribution C-1 Turn over for Schedule Co bean system for (2) 2500 kw diesel .

test S/7 ~ slipping. generators. - 13,2 kv line. Run on S/11.

" !S-14 Shielding for decay heat pump. .. t-2 To be scbedule1 • Wilson ,

. . -· - .

Page 8: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

TECHNlCAL SUPPORT •

Task Description

LS.2 Tech. Spec. & Surveillance & !&••~ Changes to those left deletions additions

nl.21

'lM.23a

'lM.2Jb

'lM.JO

ni.JS

Closed coolioa syatca for S.C. I

b) Long term high pressure system using new BX, BP pump to be installed

Pauive system for pressure ~ volUI:le control of PRCS (N2 Bubble in water tank)

acs active pressure/vol control systeo (~ev H/U pump to N

2 tank system)

Determine what BOP loads need backup electrical power

Lona term plant inatl"UIUn­tation requirements (criteriJ )

M 66. D. Bow to aaintain prilllary bol'on cone.

AA 69. Define all plant mods needed for long term operations

AA 75. Equations for predicting boron concentration

AA 76, Prediction of primary leak rate with primary aide flooded

AA 77. Analysis & summary of 4/28 natural cil'culation mode. !valuate atabillty & equi­librium

M. 78. Evaluate options for mid-terc continued operation

a) Steam B to get nat. eire.

b) Taka B solid, aet nat. eire.

·-·-

Expected Priorm Completion

1 No Status

1 5/10

1 S/11

1 5/ll

1 Continuing

1 No Status

1 No Statue

1 No Status

1 Comp. 4/28

1 Completed

1 No Status

1 No Status

. - ~- .. - ------ ----. 0800 5/3/79

Task Status Coord.

Active: NRC L. V. Harding interactions under negoti-ation

Revised criteria document TSG095 Bard­vareinatallec In Progrua

Revised cri­teria docu. Bdw installed

Revised cri­teria docu. Hdv installed

Capodanno/ Langenbach

Capodanno/ Langenbach

Capodanno/ Langenbach

Draft criter- Capodanno/ ia document Langenbach issued 4/24

Criteria doe. Capodanno/ Being revised Langenbach

Active GPUSC/ . KPI.

Croneberger

RCS Boron J. Moore Cone . calcu-lations

TSG 126 J. Moore/ G. Bond

data summary G. Bond

Position paper recoacend next operating mode

Page 9: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

0800 5/3/79

.. 'IEClatCAL SUPPORT

Expecte4 task Tuk Descril)tion PrioritY Coapleti.on Status Coord.

M 78. c) I)ynamics of svitchina from A to B, B to A; combia.atiors of steaming & solid coad .

AA 79. Define .. alert levels" for l Do Status Not Active J. A. Danf el various parameters

AA 80. Analytical & Tech. Plazmin& l Cont1Du.ifta J. A. Dani e.l Support for updated procedures (EP-32, etc.)

AA 81. 'Estimate aUIIIp vater level 1ft 1 !fo Status Active reactor bulldin&

M 82. Determine which electrical 1 No Status Active shorts in containment could give 4ft iftcU.cation of contain-ment sump level.

M 83. Identify critical valves and l No Status Active instru=ents vhich may be dacaged by high SUIIIp levels.

M 84. Identify flov paths ~rom the contain=ent sump.

1 No Status Acthe

M 63. Report on nat. eire. other 1 No Status Report CrimllliJu/ analyses besides B&W Iaber/

Cunningham

M 64 . Report for Cooldovn on "B" 1 SIS Report Cr illllll1na S/G Report for Solid on A

'IM.2S Loss of offsite pover 2 S/8 Diesels oper- Capodanno/ protection of vital systems atioa.al and Langenbach

tied to buses •

.

Page 10: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

- --~.

' 0800 5i 3/79

• W'ESTINCHOUSE .

Exp~eted Task Taalt Deacrip t ion PrioritY Collll)letion Statu• Coord .

1.1.4 Inat&ll DBR remote opa. equip. 1 S/2 Ongoing Siano

I.I. S DRR f1ov/preaaur~ tests . 1 5/3 Ongoir.g Suno

II.A.l ADRR (ntn~) aya . design and 1 5/2 Ongoing Siano approval.

n.A.l Fiad ADHll teat procedure. 1 513 On&oin& Siano

tl.A.l Find ADHll ilultallation 1 5/10 Ongoing sU1lo procedure.

II.I AHD~ Inat&llation. . 1 5/18 Ooaoing Siano

Licanaing Report. 1 4/26 Formal aub- SW1o llli.ttal to GPU

.

Page 11: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

0800 5/3/79 •

WASTE MANAGEMENT CROUP

Ex;lecteci Task Ta.slt De.scr11)tfon Priori tv Coc::;,letion Status Coord.

L-10 Pursue activities on processing A-1 In progress. Carman/ Unit l water through CAP-GUN to *Wel.ler both provide support to insure available freeboard for Unit 2 &Dd to develop ruin formula-tions for Unit 2 water.

L-14 Evaluate vaate g.. vent header A-1 Workina per McConnell I le&Uge problema and recoaaend :S. Seel.inger' s Arthur/ fixes depending on results. waste gas plan *Barr•tt

of 4/17/79.

L-36 Investigate the effects which C-1 In progress. Ml!Coey/ the operations associated with RJJu/ reactor plant long-term cool- *Collins dawn will have on discharge to the vaste systems. Ralated to L-6.

L-42 Develop=ent rec:om=endations and C-1 McGoey/ procedure for draining and RIJsa disposition of iCBT ~ter to aupport plant needs to make up wit h degassed demin. water . - ~·

L-44 Evaluate system designs with B-l Report being Xraft Technical functions and W to prepared; assess possible interference delayed by proble:u fr0111 standpoint of higher priority locations, operations , taalta. maintenance, etc.

G-1 Install AB/FBB off-gas filter A-l Phase I design Hontgomer y/ system to back-up plant system. complete . Itschner/

System descrip- *Collins tion and start-up procedures are complete. Stack cut-in is made. Phase II and III lud to permanent syste , schedule shova 5/5 operation. Dec::f.aion requirt ~ on charcoal . treatment •

*NRC contact

. .

-- -- ... - ----- ---- .. ·---

Page 12: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

Pa&a.]. of 6 0800 5/3/79

WASTE MA.~CEMENT CROUP

Er,lected Task Task Descript1on Priority Co::~~ let ion Status Coord. G-4 Vent stack monitoring system A-1 Eberline servic - tlorton/

to replace HP-R219. men and SRI Cline/ have calibrated Pelletier I on noble sa• *Stoddart and iodine. Capping stack takes BP 219 out of service. Supplemental system monitors are calibrated.

G-5 Change out AB/FH! HVAC vent A-1 Long-tet'lll McConnell filter train charcoal bed. storage plan Edwards

I

defined. 45 permanent storage/ahippin containers in fabrication. delivery starts 4/25. "A" train of the . AB filters and 11A11 train of

-.~ · CHB filters removed and replaced. units

. back in service High radiation level in "B" train cUctates delay "B" train change out. Deluge systems secured on all renewed filter trains. Spent filter tray

!d -removal acbedull to begin 5/2.

G-31 Detet'llline air flow paths in A-1 Oparatins matdx Nawaz/ AB/FHB. being developed· Itacbner/

available 4/22. Robison/ Update schedulec *Barrett 4/28.

G-32 Detet'llline that there are no A-1 FxamiMtion of Nawaz/ unidentified air flow paths. plant status/ Itschner/

configuration Robison/ underway • *Barrett . Firat cust.

* NRC contact review c0111plate

·· - --· -- · ·- -· --·- .. ... ·-- ····

Page 13: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

• Paae 3 of 6 - 0800 5/3/79

Priodty EJQeeted. l'ask Task Desc'!'i,tion Co~letion Status Coord.

Ci-34 Review overall Unit 1 and 2 AR !-1 Review underway· Itschner/ and FH! ventilation require=ents docum.ent.a t1.on Robison/ with a view towards Clini:IUm flo, completed. *Barrett/ from Unit 2 to Unit 1. . *Collins

Ci-40 Criteria for and control tasks A-1 20 ''Red DevU" resulting 1n the evolution of type local contaminates that could poison filtration charcoal fUters. aysteaa on . order to

control welding fWDes.

L-3 Deter=ination of leakage pathS 2 Plant staff Kraft/ and flow rates in Unit 2 Aux. folloving. Arthur/ Bldg. and FHB and repair •cwalina of laaks where possible. Plant has leakage lD and Status Board in Unit 2 Control Room. Pursue Plant activities associated vith this.

L-12 High level solid vast~ disposal B-2 In prosresa. Edwards/ 1nvestisation. - -:· *'l:eller/

*Collins

L-26 Perform assessment of the value A-2 Price proposal Xraft/ and need for a closed circuit being assessed Lutz/ TV Monitor to provide re=ote versus decon. *Stoddart indicator of radwaste panel schedule of data. Aux. Bldg.

L-29 B-2 .

lUlliams/ Investigate reported water Water f1:om collection 1n the "B" fuel pool, Unit 2 const. *Barrett obtain samples and make plans Sample needed. for disp~;aition. Also invest!-gate ~he - preoperational condition of the fuel pool from :

a lukage standpoint.

L-33 Develop a pl~n for tying in the . B-2 In progress - Snider/ tank farm to EPICOR 2. investigating *lleller/

.secondary tie-in.

*Collins

* NRC contac:c . ,

.• . . -. .

I I

1 -·--:--·--:------·-~--- - · ... - ---··. -- -·---·-·---

Page 14: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

Paae 4 of 6 • '\

WASTE MANAGEMEN't' GROUP

Tuk

L- 35

.

L-37

G-7

G-30

G-33

G-36

Descriotfon

Investigate the need for a design and construction task to erect a barrier betwe~ the U11it 1 and U11it 2 Fuel Banc! Ung llda. to enable Unit 1 opera-tiona with Unit 2 in processing Hod e.

Develop a plan for reaovina all radioactive aaaes from the ays-teaaa in the AB and FBB.

Condenser vacuum pump discharge filter ayst-:m·

. Reactor Purge Systeo Charcoal FUter Sample.

Desensitize AB and FRB Filter Monitors.

Develop "atandard" c:ontlU:linated vork area radiological protectio systm(a), including air supply, clothing, communications systems, etc., which permit best possible working condition&

* NRC contact

. -·· ··-- --- - .. -- -... .. . . . .

Priority E:Qected CQ_~:~plecion

B-2

B-2

A-2

A-2

A-2 -~·:·

B-2

.

0800 SI'J/19

ruk Stat:us Coord.

Alternate WUliaasl design Unit 1 *Barrett side to be submitted 4127/79.

. Require& COIIt- Ross pletion of L-14.

FUter opera- llobiaonl tionsl . Inves- !font gomer I tigating opera- *Collins tins criteria. Will evaluate DF •

Radiation sur- McConnell I vey requested . *Collins

Prelilllinary Siegl investigation - *Stoddart aeaensitization infeasible.

Suggest tasking *Stoddart a Met-Ed BP, Het-Ed Mainte-nance, ALARA

. on WMG tea::a to develop stan-dard vork package.

.

Page 15: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

Task

G-39

G-41

L-11

L-16

L-17

L-20

.

P~e,) of 6 \

Descri~tion

Develop and 4Ssess back-up gas filtration scheme to cross-connect the Auxiliary Buildlug filters to tb~ RB purge filters.

. . .

Develop filter unaament stratel)'. Inveatiaate/develop process for eliminating Unit 2 water in RCBT' a. Process plannina for Unit l and 2. Design (con-ceptually) a waste processing system for Unit 2 High Level Liquid Wastes.

Lov level vaate (paper . raas . vood , etc. ) disposal .

Develop CAP-ctrn 3 System.

Obtain a l evel measurement and a umple of water frora the RB sump and basement.

* NRC eoatact .

·:------ ---· - -·-·-:-- ---- ·-- ·- ····- · ..

Ex;lected Priori tv _j&tr.l)letion

B-2

.

8-2

8-3 - ·~

B-3

B-3

8-3

l

0800 5/3/79

Task Status Coord.

B&R. has devel- McConnell oped a concept. Second estimate scheduled shovs 14 day + schedule • Husman Co • has developed

. drawinas. Ex-posure/scbedule coat appears too hi&h. Coo-tinaency plan is to open rouahly filter manway if emer-seney vcu1tila-tion of Auxiliary Building is needed.

Morton/ Plannina started Clure/

*Bland t>etail duign Snider/ scheduled to *Weller sta.rt 4/25/79.

In progress: Edwards/ second com- lt\leller/ pactor ordered. *Collins

Initial planninl Snider/ only. Detail lt\leller/ design *Collins scheduled to start 4/25/79.

Measurement Rosa/ using Heise *Cwalina gage being explored .

.

Page 16: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

Paie 6 of 6 0800 S/3/79 ~ .

WASTE MANAC~tnrr ~ROUP

Pdod.~ Ex,ected Task

Tuk Desc:r~tfon Coa;:~leeion Status Coord.

L-22 Develop a plan for long-te~ B-3 Open/ cleanup to provide access to *Collins Auxiliary Blda. for restoration activities.

1.-30 Develop plan for radiation ' B-3 Open/ survey in Auxil.iary and Fuel *Stoddart H.andlina !lda.

G-15 Emaraenc:r RB Cas Purse Cleanup A-3 On bold; 'Q.O Open/ System. · plan to *Collins

implement.

G-29 FliB Airlock. B-3 Airlock Inactive/ unnecessary at *Barrett this ti;le.

:

-.·~· .

:

!

.

:

• NRC contact

. . .

----·---:----·· -· --- ··---· ----·-----· ·- - . .. . __ I

-~-----· - ·~-

Page 17: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

• INDUSTRIAL ADVISORY CROUP

Task

2.

ll.

20.

De!crbtion

Provide racocmendation for alternate methods of P/V control.

Instrument di&gcoatics.

Evaluate various alternatives to dec:onta=inata plant; long­tam.

25. Instrument

40.

42.

43.

44.

45.

46.

48.

a. 12 selected TC's on recorder or computer

b. TH & TC on recorder

Participate in EP-32 changes.

Options for chort-term core cooling (2-3 mos.)

Long-term cooling

Level of water in containment

When v1ll natural c:irc:ulation atop on the "B" loop?

Beat losa from pipe and reactor vs. temperature

Comments on continued natural circulation operations.

12. Specifications for Reflux Boller Test

14.

19.

a. Feasibility

b. Specific: parameter

Model for boron/g .. in primary ayatem.

Time to core melt vith no external cooling and removal through flooding of contain­ant.

Expected Prioritv Cq_~letion

l

1

1

l

1

1

l

l

l

1

1

2

2

2

2

Comp. 5/2

Comp. 5/2

Comp. 5/2

0800 '5/3/79

Status

In progreu

Not started

In proaress

In progress

IA 40

IA 42

In progress

In progress

In progress

In progress

IA 48

In typing

In typing

task Coord.

Ackerman

Lawborski

Stroupe

Stroupe

Stroupe

Stroupe

~lar

land ell

Meyer

lColar

Levy

Fornandoz

Fornandoz

Being written JColar

Sot started Fornandoz

------~--

Page 18: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

·. 0800 S/3/79

• INDUSTRIAL ADVISORY CllOUP

Expected Task Tuk DescriPtion Priorit~ Completion Se.tus Coord.

22. Plan Mod - piping and equip- 2 In progress Lavborski caant.

47. Suaaastion for &oing solid on 2 In prngress Tooker "8" vitb tbe lona-tera systera

.

.

Page 19: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

,.., ... ·::> 1}1 -t"· u p _l.~.:.l',l:.t:f.~{.L,· ·- ·----

•a· o:.U ~11"' Cl& ID' 7 K •U1 ··a· ••L $1llot Dl& IDII K 011111 $111111

. .. -·-

'l-\,.., -z.a18

T-: .. :-••• (w •• .-.~!i

Z.\ ,..,

t.l.., 8

f l~P IIIOil: 01 l&~l

111 :UrAD. i

fOil INS1Ali..'110H I'Uli,OS[S US( CU1111(0 DIL~NSIOIIS OMlT.

· ·~ ::7 :~..;(·-'··!~~ !4·5:-;$~?;.::-;~;;:z.r.$:31QE] PARTS LIST W.6;-L¢~ed:-~~?\~:t-;s:&-%-"i *•7;;::;;::'.!. .;: .. c-i ·~.--, .

~c. I NO. DUCitiP1101C

I CIU1CH "DUSING ~ I .. DUSING ·-3 .. D~:S•"c: cove• ---£ 1 s~a ... c; c•u ••oc;t c .. ~ !I I >!A"D\'IMI H IT ----& lu .. n sw co .. ~ . CD"'" - ----7 _I_H .. NC\'oHIIl Gt All ---• I we••' SMAll flAIIn•G c·~ t I Dl Cl UlCH ll"ll

~---

10 I DICIU1CH HVtll II I OIIIW( Sltf¥(

~; 'OICIUICM IDitOl --------,. WDo1-.t G(AII ----

U I Sl'll t"G llo,.c; ,. aus .. ••G --,, I IUSHING ----70 sH•• "Uf -:1'4 I t.!ANU&I DICIUICH SHAn

!...___ 7) I H&f<O\'," Wf II !.""" ~(Al ll(~.l~(lt ~l .. l(_ --,

)1'111 "'"G •t , ..... ,. "3==: 71 1 wc.a.., Gta.a :SI-•Clll :l't 11CC0Ut \UAI1 SHIV(

,_ 30 I IOCo;IHCO WUT --,---Jl ... ~1"\( --I .. DlDit C-~"~Uil l7 ICIU1C• . ... ~t~l· fJ 1--

!--*l)~ICIU~ICHH~,;t-J'I.~t~ -- --

;)C liCit .. l't\'01 "'" -----• _1 ·-- -

JS I".L"Dil L..!.-:"iC'i:No:;,~,'-=•oo=--·-==. ::-:: -: J - - -

Page 20: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

~--------~~~~--------~--~~~----------·

·BURNS AND ROE. INC.

W.O. No. _______ Oar•--------Book No.------- Pag~ No.-----O,._ij,g ND.~r.":":":T'P"------Calc. No. Shtet _of---8y lf .Sr'"' /lf; Checkld ________ .Approvld ______ ...... ______ _

Title .1> N-V- 7

e .. r " SECTtON D-D _

'?.fit PW~. 2.1'78 ~t'ol. I'Z.,

Page 21: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

.. ·. BURNS AND ROE, INC.

W.O. No. _______ oa~ ________ Book No. -------'• No.-----Drawing NQ. Calc. No. Sheet __ of __ _

By If 5?h ,f}- Chtckld~-------APPfO~------~------TiU. YA.V ($ ~\\-V• I '>-'·'-~- ,,, \)

5I" _.y"i . ~~ lY ~ ,.,.

,_~,

I

' i . I

' ·I .. .·

, -------~ >'-=-----E!---------....:..- f £/ )91-o •

i xl

'Ot'" '" 1002·2

I ,. ~((1 -o

Page 22: PLANNING HEETI!«: 0900 5/3/79 l. 0900, 5/3/79, Task ...1979... · Task Kanag~t/Schedule Ueeting 0900 S/3/-79 1. Radioactive Releases •> 748, 219 S/3/79 b) Vacuwa drav on Auxiliary

.,

0900 (5/2/79)*

A I

th 176.3 178.5

Tc 163.6 101.5

AT 12.7 77.0

Tatm 162.0 130.0

PZR LEVEL C&l. . 266.8/ITO? DVM 281 LT-3

R..C. Prass 924 .

S/C Level 430" 92.5%

Turh . B/P 84%* Closed

I.C.T. IU&h 320 Ava.

M.U. Temp.

ACTION ItniS:

~~

0900 5/3/79

PLANT STATDS

1800 (5/2/79)

A . I

176.9 177.5

163.7 101. 2

13.2 76.3

162.3 130.9

151. 5 237.0

920

412" 92%

84% Closed

321.2

98

* Valve Position Chan&ed - Only Significant Oparation

SEALS VALVED OUT

0900 (5/3/79)

A f3

17~ 8 ']~.~

/~/. ~ 1rs.e>

p. -z. j' ~. t;

/€-d· 9 1~3- 7

/~/ • t!J-'~ -'-, ,t. s-.,..,., I e.

z !r/

t?fL:r ~Z1.

,, Yz?;

1!'4- C'~

318

~'