planning for success: applying systems engineering to asct implementation
DESCRIPTION
Planning for Success: Applying Systems Engineering to ASCT Implementation. TRANSPO 2012 October 29, 2012. Eddie Curtis, PE FHWA Office of Operations / Resource Center. Trigger Event. 1 Monitor Traffic. A daptive S ignal C ontrol T echnology. Data Collection. Modeling / Optimization. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/1.jpg)
Planning for Success: Applying Systems Engineering to
ASCT Implementation
TRANSPO 2012October 29, 2012
Eddie Curtis, PEFHWA
Office of Operations / Resource Center
![Page 2: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/2.jpg)
2
Adaptive Signal Control Technology
1Monitor Traffic
2Evaluate Performance
3Update Timing
Trigger Event
Data Collection
Modeling / Optimization
Implement & Fine Tune
Reporting
![Page 3: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/3.jpg)
US Implementation 1992-2009
Source: NCHRP 403 2010 & FHWA Arterial Management Program
![Page 4: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/4.jpg)
ASCT Systems Deactivated 1992 - 2009
![Page 5: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/5.jpg)
Knowledge gained from demonstrations
• Substantial benefits over coordinated TOD operation– Travel time, Delay, Emissions, – Congestion, Safety
• Most effective where demand conditions are Variable and unpredictable
• Linear Arterials, limited success within tight grids
• Under Saturated
![Page 6: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/6.jpg)
What we know about Traffic Signal Management & Operations Practices
2005 2007 2012
![Page 7: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/7.jpg)
Technology Innovation
• Warm Mix Asphalt
• Precast Bridge Elements
• Geosynthetic Reinforced Soil
• Safety Edge
• Adaptive Signal Control Technology
Better, Faster, Smarter
Shortening Project Deliveryo Planning & Environmental Linkages
o Legal Sufficiency Enhancements
o Expanding Use of Programmatic Agreements
o Use of In–Lieu Fee and Mitigation Banking
o Clarifying the Scope of Preliminary Design
o Flexibilities in ROW
o Flexibilities in Utility Accommodation and Relocation
o Enhanced Technical Assistance on Ongoing EISs
![Page 8: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/8.jpg)
Benefits• Better
– Benefits to Road Users & Agencies• Travel time reduction 13% - 50% • Fuel Consumption 8% - 38%
– Ongoing performance measurement• Smarter
– Solves problems that are difficult to address with time-of-day and traffic responsive
– Saves cost of mundane data collection and retiming• Faster
– Reduces retiming intervals from years to minutes
![Page 9: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/9.jpg)
9
Barriers to Adoption
– Complexity
– Cost
– Uncertainty about Benefits
![Page 10: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/10.jpg)
Possible Approaches
• Consumer Reports – Evaluate Available
Technology– Consult with vendors /
Distributors– Deploy small scale
system (DEMONSTRATION)
– Evaluate– Abandon or Expand
• Systems Engineering– Objectives– Needs / Constraints– Requirements– Design– Implement– Verification– Validation– (Operate & Maintain)– Abandon or Expand
10
![Page 11: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/11.jpg)
11
Successful Deployment
• Goals well understood• Agency describes its needs• Positive response to requirements in RFP• Requirements are verified • Performance objectives are validated • System is effective over entire life cycle
![Page 12: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/12.jpg)
12
What are the Risks - ASCT?
• Problem could be solved with other strategies• Functional Objectives of the system do not
align with agency objectives• Loss of other critical functions / features• Constraints not properly addressed• Cost• Maintenance
![Page 13: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/13.jpg)
13
Other Risk Issues• Technology NEW to most• Technology still evolving• Most systems have very limited track record• Documented history of failed ASCT projects (40%+)• Significantly increased complexity• Extremely dependant upon infrastructure
– Communications systems– Detection– Staff
• Not “one size fits all”• Marketing often exceeds performance
![Page 14: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/14.jpg)
The Role of Systems Engineering
Understanding the problem
•Projects getting bogged down with shifting requirements
•Acquisitions being challenged by unsuccessful bidders/proposers/vendors
•Projects not meeting agency needs
Managing risk
+ it is mandatory for federal-aid projects
![Page 15: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/15.jpg)
Purpose of SE Model Documents• Evaluate need for Adaptive Control• Help agencies identify verifiable,
needs-driven requirements for evaluating design and implementation choices
• Model documents greatly reduce systems engineering effort by providing wording and documentation…
• …but agencies still must identify their needs
![Page 16: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/16.jpg)
Model Document Process
Build Requirements• Answer questions• About the situation• About you
• Select and tailor ConOps statements
• Select and tailor requirements
Evaluate Alternatives• Evaluate proposed
approaches/products against requirements
• Solution feasible given constraints?
Continue Tailoring Until Solutions… • Fulfill requirements• Are feasible
![Page 17: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/17.jpg)
FHWA Every Day Counts Outreach/Support/Technical Assistance
![Page 18: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/18.jpg)
US Implementation 2010 - 2012
![Page 19: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/19.jpg)
FHWA EDC/ASCT Influence 2010-2012
![Page 20: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/20.jpg)
Rate of Implementation
Deployment 1
992 - 2009
Deployment 2
010 - 2012
Planned Deploym
ent
Deactiva
tions 1992 -2
0090
10203040506070
38
63
42
20
![Page 21: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/21.jpg)
Application of Systems Engineering
Completed Deployments applying SE (1992 - 2012)
Planned Deployments using SE
0%
10%
20%
30%
40%
50%
60%
70%
8%
62%
![Page 22: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/22.jpg)
22
Influencing Change
“Innovation is not what the customers does it is what the customer adopts”
~ Jesse Glazer CAL-SOUTH Change Agent
![Page 23: Planning for Success: Applying Systems Engineering to ASCT Implementation](https://reader030.vdocuments.mx/reader030/viewer/2022020417/56815c57550346895dca5945/html5/thumbnails/23.jpg)
Questions?
Eddie Curtis, P.E.Traffic Management Specialist
(404) 562-3920