planning & development department - phoenix, arizona › pddsite › documents › trt ›...
TRANSCRIPT
Planning & Development Department
Self Certification TrainingStructural for Architects
1
2
Rost Sapon, P.E.Structural Plans EngineerAccessibility Technical Lead
3
Client ?
Architect?
4
Project Scope?
5
Project Timeline?
6
Communication
Coordination
7
STRUCTURAL CHECKLIST
8
9
Documents Sealed
General Structural Notes
Foundation Plan
Floor Framing Plan
Roof Framing Plan
Structural Details
STRUCTURAL DRAWINGS
10
Documents Sealed
Geotechnical Report
Geotechnical Special Inspection Certificate
Structural Special Inspection Certificate
Structural Observation Certificate
OTHER DOCUMENTS
11
GENERAL STRUCTURAL NOTES
⦁ Building Code⦁ Design Live Loads⦁ Wind Design Data⦁ Earthquake Design Data⦁ Geotechnical Report Number and Date Listed⦁ Soil Bearing Values Listed⦁ Special Structural and Geotechnical Inspections Listed
⦁ Deferred Submittals Listed⦁ Structural Observations Listed
12
GENERAL STRUCTURAL NOTES
⦁ Material Specifications
Review materials listed with the project scope
13
STRUCTURAL OPTIONS
Deferred Designs
Delegated Designs
14
DEFERRED DESIGNS
LIMITED ITEMS CAN BE DEFERRED
ITEMS PROHIBITED FROM DEFERRAL(NO EXCEPTIONS):
StairsGuards and HandrailsStructural Connection Design and Detailing
15
DEFERRED DESIGNS
The construction permit drawings shall:
⦁ Identify all deferred design items, ⦁ Specify the design loads for the deferred items, ⦁ Lay out the deferred items within the construction, ⦁ Detail the supports for the deferred items, ⦁ Show deferred items on the plans and in the details.
16
DEFERRED DESIGNS
Each deferred submittal is required to be reviewed and approved by both the ARCHITECT AND the STRUCTURAL ENGINEER before they get to the field for construction.
17
DELEGATED DESIGN
ANY PORTION OF THE STRUCTURAL DESIGN MAY BE DELEGATED TO ANOTHER QUALIFIED LICENSED ENGINEER BY THE ENGINEER OF RECORD.
!!! BUT !!!THE COMPLETE DELEGATED DESIGN DRAWINGS SHALL BE INCLUDED AS AN INTEGRAL PART OF THE CONSTRUCTION DOCUMENTS.
18
DELEGATED DESIGN
THE ENGINEER OF RECORD IS RESPONSIBLE FOR EACH DELEGATED DESIGN, AND SHALL PROVIDE:
⦁ The design loads required for the delegated design,⦁ The design for the supports of the delegated design,⦁ The review and coordination of the delegated design.
19
DELEGATED DESIGN
DELEGATED DESIGN DRAWINGS
!!! ARE NOT !!!
SHOP DRAWINGS
20
FOUNDATION PLAN
21
FLOOR FRAMING PLAN
22
ROOF FRAMING PLAN
23
ANCILLARY STRUCTURE PLANS
⦁ Ramada
⦁ Gate House
⦁ Shade Structure
24
DETAILS
25
WALL DETAILS
26
STRUCTURAL CALCULATIONS
Calcs R Us
Build –N-Git Development
DD&R Inc
Big and BeautifulComplex
54321HughKnew
27
GEOTECHNICAL REPORT
Drilling, Digging, and ReportingGeotechnical Engineers
Playing with dirt for 45 Years
Big and Beautiful Complex
Build N GitDevelopment
12345Sandy Clay
28
SPECIAL INSPECTION CERTS
12345Sandy Clay
54321HughKnew
29
STRUCTURAL OBSERVATIONS
54321HughKnew
30
PRE-ENGINEERED METAL BLDG
⦁ Are the drawings sealed with an ARIZONA seal?⦁ Are the drawings labelled “FOR CONSTRUCTION”?⦁ Do the drawings appear complete? Notes, Plans, Details.
The Pre-engineered Metal Building is an example of DELEGATED DESIGN.
⦁ Do the drawings look like the project?
31
Precast Concrete Structures
⦁ Are the drawings sealed with an ARIZONA seal?⦁ Are the drawings labelled “FOR CONSTRUCTION”?⦁ Do the drawings appear complete? Notes, Plans, Details.
The Precast Concrete Structure is an example of DELEGATED DESIGN.
⦁ Do the drawings look like the project?
32
Post-Tensioned Concrete Slab
⦁ PT Slabs are typically designed by the E.O.R. using standard design procedures and typical material parameters.
Post-Tensioned Concrete Slabs may be aDELEGATED DESIGN
⦁ The construction drawings show the tendon layout and specify the design assumptions and material parameters used.⦁ Contractor submits sealed adjusted tendon placement drawings and calculations to E.O.R., using specific, tested, tendon properties, to meet the original E.O.R. design.
33
QUESTIONS?