plan · notes: 1.this drawing is to be read in conjunction with the environmental statement. 2.the...

2
FIGURE 5.8A MOY RAIL BRIDGE INDICATIVE ARRANGEMENT - SHEET 1 OF 2 FINAL B AS SHOWN RC 30/03/18 GA 30/03/18 RB 30/03/18 SB 30/03/18 P01 RC GA RB 30/03/18 FIRST ISSUE A_MLMOY_ST - DR - ST - 0001 A9P12 - AMJ - HGN - P01 5HSURGXFHG E\ SHUPLVVLRQ RI 2UGQDQFH 6XUYH\ RQ EHKDOI RI +062 &URZQ FRS\ULJKW DQG GDWDEDVH ULJKW 2018. All rights UHVHUYHG 2UGQDQFH 6XUYH\ /LFHQFH QXPEHU Date Designed / Drawn Scale Drawing Number Drawing Title Drawing Status DO NOT SCALE Date Date Date Checked Approved Client Original Size Suitability Millimetres 100 10 0 A1 Plotted: Apr 03, 2018 - 2:16pm by: UKSMY600 Drawn / Des Date Checked Rev Approved Description Authorised Location Type Role Number Originator Volume Project Revision PLAN SCALE 1:500 LOCATION PLAN SCALE 1:5000 - A SECTION SCALE 1:200 - B SECTION SCALE 1:100 EXISTING WATER COURSES & STREAMS NOTES: 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ENVIRONMENTAL STATEMENT. 2. THE DRAWING IS A STAGE 3 GENERAL ARRANGEMENT DRAWING AND MAY BE SUBJECT TO CHANGE. LOCATION PLAN (SCALE N.T.S)

Upload: others

Post on 12-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLAN · notes: 1.this drawing is to be read in conjunction with the environmental statement. 2.the drawing is a stage 3 general arrangement drawing and may be subject to change. location

FIGURE 5.8A

MOY RAIL BRIDGE

INDICATIVE ARRANGEMENT - SHEET 1 OF 2

FINAL B

AS SHOWN RC

30/03/18

GA

30/03/18

RB

30/03/18

SB

30/03/18

P01 RC GA RB 30/03/18

FIRST ISSUE

A_MLMOY_ST - DR - ST - 0001

A9P12 - AMJ - HGN -

P01

Reproduced by permission of Ordnance Survey on behalf of

HMSO. © Crown copyright and database right 2018. All rights

reserved. Ordnance Survey Licence number 100046668.

Date

Designed / DrawnScale

Drawing Number

Drawing Title

Drawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked Approved

Client

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: A

pr 0

3, 2

01

8 - 2

:1

6p

m b

y: U

KS

MY

60

0

Drawn / Des DateCheckedRev Approved

Description

Authorised

Location Type Role Number

Originator VolumeProject

Revision

PLAN

SCALE 1:500

LOCATION PLAN

SCALE 1:5000

-

A SECTION

SCALE 1:200

-

B SECTION

SCALE 1:100

EXISTING WATER COURSES & STREAMS

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE

ENVIRONMENTAL STATEMENT.

2. THE DRAWING IS A STAGE 3 GENERAL ARRANGEMENT

DRAWING AND MAY BE SUBJECT TO CHANGE.

LOCATION PLAN

(SCALE N.T.S)

Page 2: PLAN · notes: 1.this drawing is to be read in conjunction with the environmental statement. 2.the drawing is a stage 3 general arrangement drawing and may be subject to change. location

FIGURE 5.8B

MOY RAIL BRIDGE

INDICATIVE ARRANGEMENT - SHEET 2 OF 2

FINAL B

AS SHOWN RC

30/03/18

GA

30/03/18

RB

30/03/18

SB

30/03/18

P01 RC GA RB 30/03/18

FIRST ISSUE

A_MLMOY_ST - DR - ST - 0002

A9P12 - AMJ - HGN -

P01

Reproduced by permission of Ordnance Survey on behalf of

HMSO. © Crown copyright and database right 2018. All rights

reserved. Ordnance Survey Licence number 100046668.

Date

Designed / DrawnScale

Drawing Number

Drawing Title

Drawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked Approved

Client

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: A

pr 0

3, 2

01

8 - 2

:1

2p

m b

y: U

KS

MY

60

0

Drawn / Des DateCheckedRev Approved

Description

Authorised

Location Type Role Number

Originator VolumeProject

Revision

HIGHLAND MAINLINE

0001

D SECTION

SCALE 1:100

0001

C SECTION

SCALE 1:100

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE

ENVIRONMENTAL STATEMENT.

2. THE DRAWING IS A STAGE 3 GENERAL ARRANGEMENT

DRAWING AND MAY BE SUBJECT TO CHANGE.

LOCATION PLAN

(SCALE N.T.S)