plan for day three of shooting

4
PLAN FOR THIRD DAY OF SHOOTING Halfwit Productions

Upload: sahraahmedali

Post on 14-Jun-2015

129 views

Category:

Education


1 download

DESCRIPTION

Media Studies A2

TRANSCRIPT

Page 1: Plan for day three of shooting

PLAN FOR THIRD DAY OF SHOOTING

Halfwit Productions

Page 2: Plan for day three of shooting

GENERAL

Date: Wednesday 15th July 2014

Start time: 4:00pm

Shooting crew: Sahra Ahmed – Director,

Camerawoman

Cast crew: Jordan Hewitt & Arran Sharma

Transport/ chauffeur: Train

Equipment: Camera, tripod, SD card, extra battery

Page 3: Plan for day three of shooting

PRE-SHOOTING PLAN

In school:

Pick up the camera from Mr Brown, call sheet has already been filled in and booked for the

15th July 2014.

Before we leave we must make sure that the battery is fully charged and that I have a spare

battery as well as the charger.

Once all the equipment is gathered, it is to be taken home to be practiced with by the

camerawoman so that she is ready for Tuesday.

Once at the locations to film:

Once shooting:

Pontoon Dock

Meet Scene

Walking POV – anytime, not of high importance

Tom‘s split screen

Page 4: Plan for day three of shooting

CONTINUED ( I F T H E R E I S T I M E )

Photo shoot for pictures for the magazine

Location pictures taken

Costume pictures

Cake scene

- End of filming session 3