December Sub Area Branch Total Weight / ton Erected weight / ton Balance weight / ton Planned Actual Balance Planned 47-I-0001A 54 39 15 47-I-0001B 23 23 0 47-I-0001C 85 85 0 47-I-0001D 102 101 2 47-I-0001E 81 80 1 47-I-0001F 89 88 1 47-I-0001G 99 76 23 47-I-0001H 103 90 14 Total 636 580 56 10 4 6 46 47-I-0002A 44 25 19 47-I-0002B 55 30 25 47-I-0002C 44 15 29 47-I-0002D 88 80 8 47-I-0002E 62 38 24 Total 293 188 105 38 12 26 67 PROCESS PURIFICATION PIPE RACK 47-I-2001 290 78 212 274 62 212 0 PROCESS PURIFICATION substation rack 47-I-2004 40 0 40 40 0 40 0 PROCESS PE-4 41.01 41-I-0101 340 0 340 114 0 114 226 PROCESS PE-5 42.01 42-I-0101 340 0 340 35 0 35 305 Purge Bin Gas Phase Structure 41.40 41-I-4002 1500 0 1500 0 0 0 380 Total 3440 846 2593 511 78 433 1024 47.20 NS Main Pipe Rack EW Main Pipe Rack November P3A-BOROUGE STEEL STRUCTURE PROGRESS AND PLAN Thursday, November 10, 2011 CURRENT STATUS OF ERECTION / TONNES ERECTION WORKFRONT / TONNES 47.00 Area Tons EW Main PIPERACK 10 NS PIPERACK 38 PROCESS PURIFICATION PIPE RACK 274 PROCESS PURIFICATION substation rack 40 PROCESS PE-4 114 PROCESS PE-5 35 Total 511

Upload: derwaishjee

Post on 05-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 1/9

Sub Area Branch Total Weight / ton Erected weight / to

47-I-0001A 54 39

47-I-0001B 23 23

47-I-0001C 85 85

47-I-0001D 102 101

47-I-0001E 81 80

47-I-0001F 89 88

47-I-0001G 99 76

47-I-0001H 103 90

Total 636 580

47-I-0002A 44 25

47-I-0002B 55 30

47-I-0002C 44 15

47-I-0002D 88 80

47-I-0002E 62 38

Total 293 188

PROCESS PURIFICATION PIPE RACK 47-I-2001 290 78

PROCESS PURIFICATION substation rack 47-I-2004 40 0

PROCESS PE-4 41.01 41-I-0101 340 0

PROCESS PE-5 42.01 42-I-0101 340 0

Purge Bin Gas Phase Structure 41.40 41-I-4002 1500 0

Total 3440 846

47.20

NS Main Pipe Rack

EW Main Pipe Rack

P3A-BOROUGE STEEL STRUCTURE PROGRESS AND

Thursday, November 10, 2011

CURRENT STATUS OF ERECTION / TONNES

47.00

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 2/9

Area Tons

EW Main PIPERACK 10

NS PIPERACK 38

PROCESS PURIFICATION PIPE RACK 274

PROCESS PURIFICATION substation rack 40

PROCESS PE-4 114

PROCESS PE-5 35

Total 511

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 3/9

Sub Area Branch Total Weight / ton Erected weight / to

47-I-0001A 54 39

47-I-0001B 23 23

47-I-0001C 85 85

47-I-0001D 102 101

47-I-0001E 81 80

47-I-0001F 89 88

47-I-0001G 99 76

47-I-0001H 103 90

Total 636 580

47-I-0002A 44 25

47-I-0002B 55 30

47-I-0002C 44 15

47-I-0002D 88 80

47-I-0002E 62 38

Total 293 188

PROCESS PURIFICATION PIPE RACK 47-I-2001 290 78

PROCESS PURIFICATION substation rack 47-I-2004 40 0

PROCESS PE-4 41.01 41-I-0101 340 0

PROCESS PE-5 42.01 42-I-0101 340 0

Purge Bin Gas Phase Structure 41.40 41-I-4002 1500 0

Total 3440 846

47.20

STEEL STRUCTURE PROGRESS AND PLAN 1342

CURRENT STATUS OF ERECTION / TONNES

Thursday, November 10, 2011

EW Main Pipe Rack

47.00

NS Main Pipe Rack

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 4/9

Branch Men Power Crane Supervisor

Total

Qty (Tons)

47-I-0001A 54

47-I-0001B 23

47-I-0001C 85

47-I-0001D 102

47-I-0001E 81

47-I-0001F 89

47-I-0001G 99

47-I-0001H 103

Total 636

47-I-0002A 44

47-I-0002B 55

47-I-0002C 44

47-I-0002D 88

47-I-0002E 62

Total 293

3PROCESS PURIFICATION PIPE RACK 47-I-2001 290

4 PROCESS PURIFICATION substation rack 47-I-2004 40

47-I-21044

M. Siddiqui 82

47-I-2101 35

6PE PURIFICATION STEEL STR. 47.20 47-I-2002

13130 T Hunaid 688

7 PP PURIFICATION STEEL STR. 47.92 195

8 PE Cocatalyst Steel Structure 47.60 47-I-6002 144

9PE4/PE5 Powder Compressors P/R,

Pneumatic haulage 41.72 41-I-7201 62

10PE4 KO DRUM 41.00 41-I-0001

570 T Mumtaz 190

11 PROCESS PE-4 PR 41.01 41-I-0101 340

12 41 02

47

1 EW Main Pipe Rack

47.00

2

5

PP PURIFICATION PIPE RACK 47.21

NS Main Pipe Rack

47.20

Sub Area

STEEL STRUCTURE PROGRESS AND PLAN (13

S. No DescriptionUnit

CURRENT STATUS (TONNES)

Saturday, June 02, 2012

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 5/9

Branch Men Power Crane Supervisor

Total

Qty (Tons)

P

(

 

Sub Area

STEEL STRUCTURE PROGRESS AND PLAN (1342)

S. No DescriptionUnit

CURRENT STATUS (TONNES)

Saturday, June 02, 2012

28PE4 Extrusion substation cable rack 47.00 47-I-0007 79

29PE5 Extrusion substation cable rack 41.92 41.-I-9202 29

30PE4 Sub rack and surge tank structure 41.03 41-I-3005 55

31PE5 Sub rack and surge tank structure 42.03 42-I-3005 55

32

Powder Silos 41.71

41-I-7101, 7102,

7103; 42-I-7151,

7152,7153 388

33Blender Silos 30.10 840

34Secondary Steel Str 985

Torquing All Areas24

Tanveer

Total 120 11922

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 6/9

Branch

Total

Qty (Tons)

47-I-0001A 54

47-I-0001B 23

47-I-0001C 85

47-I-0001D 102

47-I-0001E 81

47-I-0001F 89

47-I-0001G 99

47-I-0001H 103

Total 636

47-I-0002A 44

47-I-0002B 55

47-I-0002C 44

47-I-0002D 88

47-I-0002E 62

Total 293

3PROCESS PURIFICATION PIPE RACK 47-I-2001 290

4 PROCESS PURIFICATION substation rack 47-I-2004 40

47-I-2104 82

47-I-2101 35

6PE PURIFICATION STEEL STR. 47.20 47-I-2002 688

7 PP PURIFICATION STEEL STR. 47.92 195

8 PE Cocatalyst Steel Structure 47.60 47-I-6002 144

9PE4/PE5 Powder Compressors P/R, Pneumatic haulage 41.72 41-I-7201 62

10PE4 KO DRUM 41.00 41-I-0001 190

11 PROCESS PE-4 PR 41.01 41-I-0101 340

12 PROCESS PE-4 Substation 41.02 41-I-0201 48

5

PP PURIFICATION PIPE RACK 47.21

47

1 EW Main Pipe Rack

47.00

2 NS Main Pipe Rack

47.20

Unit S. No Description Sub Area

CURRENT STATUS (TONNES)

Sunday, May 27, 2012

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 7/9

Branch

Total

Qty (Tons)

 

Unit S. No Description Sub Area

CURRENT STATUS (TONNES)

Sunday, May 27, 2012

19PROCESS PE-5 PR

42.0142-I-0101 340

20PROCESS PE-5 Substation

42.0242-I-0201 48

21PE5 Loop Reactor Steel Structure 42.30 42-I-3004 64

22 PE5 Dump Tank Steel Str. 42.30 42-I-3002 243

23 PE5 Catalyst Steel Str. 42.30 42-I-3003 114

24PE5 Purge Bin Gas Phase Structure

42.4042-I-4002 1239

25 PE5 Recovery Structure 42.50 42-I-5001 436

26PE4 Extrusion Steel structure 41.70 839

27PE5 Extrusion Steel structure 42.70 839

28PE4 Extrusion substation cable rack 47.00 47-I-0007 79

29PE5 Extrusion substation cable rack 41.92 41.-I-9202 29

30PE4 Sub rack and surge tank structure 41.03 41-I-3005 55

31PE5 Sub rack and surge tank structure 42.03 42-I-3005 55

32Powder Silos 41.71

41-I-7101, 7102, 7103; 42-I-

7151, 7152,7153 388

33Blender Silos 30.10 840

34Secondary Steel Str 985

42

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 8/9

May May

Plan LF

Branch Planned Planned

1 EW Main Pipe Rack47-I-0001A 636 14 Handrails a

47-I-0002A

47-I-0002B

47-I-0002C

47-I-0002D

47-I-0002E

Total 293 62 0 10 Road crossi

3PROCESS PURIFICATION PIPE RACK 47-I-2001 290 56 0 15

PROCESS PURIFICATION substation rack 47-I-2004 40 15 0 0

47-I-2104 82 22 0 0

47-I-2101 35 8 0 0

4PE PURIFICATION STEEL STR. 47.20 47-I-2002 688 688 180 120 70 T constr

5PE4/PE5 Powder Compressors P/R,

Pneumatic haulage 41.72 41-I-7201 62 13 0 4 Platform ha

6PE4 KO DRUM 41.00 41-I-0001 190 113 45 35 Area will be

7 PROCESS PE-4 PR 41.01 41-I-0101 340 72 38 7 Piping activ

PROCESS PE-4 Substation41.02

41-I-0201 48 17 0 0 Road crossi

8PE4 Loop Reactor Steel Structure 41.30 41-I-3004 64 64 29 30 Interface w

9PE4 Dump Tank Steel Str. 41.30 41-I-3002 243 243 54 50

Interface w2012, May

10PE4 Catalyst Steel Str. 41.30 41-I-3003 114 114 54 20 Interface w

11

PE4 Purge Bin Gas Phase Structure

41.40

41-I-4002 1239 680 120 130

47

41

47.00

2

Total Balance

STEEL STRUCTURE PLAN

Summary s

PP PURIFICATION PIPE RACK 47.21

Description Sub AreaUnit

NS Main Pipe Rack

S. No

7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS

http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 9/9

May May

Plan LF

Branch Planned PlannedTotal Balance

STEEL STRUCTURE PLAN

Summary s

Description Sub AreaUnit S. No

12

PE4 Recovery Structure 41.50 41-I-5001 436 229 0 30 Bolts not av

13 PE5 KO DRUM 42.00 42-I-0001 190 108 45 45

14PROCESS PE-5 PR

42.0142-I-0101 340 74 23 15 Piping activ

PROCESS PE-5 Substation42.02

42-I-0201 48 18 0 0 Road crossi

15PE5 Loop Reactor Steel Structure 42.30 42-I-3004 64 64 15 0 Equipment

16 PE5 Dump Tank Steel Str. 42.30 42-I-3002 243 243 30 0 Equipment

17PE5 Catalyst Steel Str. 42.30 42-I-3003 114 107 26 0 Equipment

18

PE5 Purge Bin Gas Phase Structure

42.40

42-I-4002 1239 828 130 84

Structure to

into accoun

date: 30 Ju

19

PE5 Recovery Structure 42.50 42-I-5001 436 224 0 20 Bolts not av

PE4 Extrusion substation cable rack 47.00 47-I-0007 79 79

PE5 Extrusion substation cable rack 41.92 41.-I-9202 29 29

20PE4 Sub rack and surge tank structure 41.03 41-I-3005 55 32 20 20 Erection in

21PE5 Sub rack and surge tank structure 42.03 42-I-3005 55 32 20 20

22

Powder Silos 41.71

41-I-7101, 7102,

7103; 42-I-7101,

7152,7153 388 388 73 45 45T erectab

Total 11922 8476 902 700

42