Sub Area Branch Total Weight / ton Erected weight / to
47-I-0001A 54 39
47-I-0001B 23 23
47-I-0001C 85 85
47-I-0001D 102 101
47-I-0001E 81 80
47-I-0001F 89 88
47-I-0001G 99 76
47-I-0001H 103 90
Total 636 580
47-I-0002A 44 25
47-I-0002B 55 30
47-I-0002C 44 15
47-I-0002D 88 80
47-I-0002E 62 38
Total 293 188
PROCESS PURIFICATION PIPE RACK 47-I-2001 290 78
PROCESS PURIFICATION substation rack 47-I-2004 40 0
PROCESS PE-4 41.01 41-I-0101 340 0
PROCESS PE-5 42.01 42-I-0101 340 0
Purge Bin Gas Phase Structure 41.40 41-I-4002 1500 0
Total 3440 846
47.20
NS Main Pipe Rack
EW Main Pipe Rack
P3A-BOROUGE STEEL STRUCTURE PROGRESS AND
Thursday, November 10, 2011
CURRENT STATUS OF ERECTION / TONNES
47.00
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 2/9
Area Tons
EW Main PIPERACK 10
NS PIPERACK 38
PROCESS PURIFICATION PIPE RACK 274
PROCESS PURIFICATION substation rack 40
PROCESS PE-4 114
PROCESS PE-5 35
Total 511
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 3/9
Sub Area Branch Total Weight / ton Erected weight / to
47-I-0001A 54 39
47-I-0001B 23 23
47-I-0001C 85 85
47-I-0001D 102 101
47-I-0001E 81 80
47-I-0001F 89 88
47-I-0001G 99 76
47-I-0001H 103 90
Total 636 580
47-I-0002A 44 25
47-I-0002B 55 30
47-I-0002C 44 15
47-I-0002D 88 80
47-I-0002E 62 38
Total 293 188
PROCESS PURIFICATION PIPE RACK 47-I-2001 290 78
PROCESS PURIFICATION substation rack 47-I-2004 40 0
PROCESS PE-4 41.01 41-I-0101 340 0
PROCESS PE-5 42.01 42-I-0101 340 0
Purge Bin Gas Phase Structure 41.40 41-I-4002 1500 0
Total 3440 846
47.20
STEEL STRUCTURE PROGRESS AND PLAN 1342
CURRENT STATUS OF ERECTION / TONNES
Thursday, November 10, 2011
EW Main Pipe Rack
47.00
NS Main Pipe Rack
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 4/9
Branch Men Power Crane Supervisor
Total
Qty (Tons)
47-I-0001A 54
47-I-0001B 23
47-I-0001C 85
47-I-0001D 102
47-I-0001E 81
47-I-0001F 89
47-I-0001G 99
47-I-0001H 103
Total 636
47-I-0002A 44
47-I-0002B 55
47-I-0002C 44
47-I-0002D 88
47-I-0002E 62
Total 293
3PROCESS PURIFICATION PIPE RACK 47-I-2001 290
4 PROCESS PURIFICATION substation rack 47-I-2004 40
47-I-21044
M. Siddiqui 82
47-I-2101 35
6PE PURIFICATION STEEL STR. 47.20 47-I-2002
13130 T Hunaid 688
7 PP PURIFICATION STEEL STR. 47.92 195
8 PE Cocatalyst Steel Structure 47.60 47-I-6002 144
9PE4/PE5 Powder Compressors P/R,
Pneumatic haulage 41.72 41-I-7201 62
10PE4 KO DRUM 41.00 41-I-0001
570 T Mumtaz 190
11 PROCESS PE-4 PR 41.01 41-I-0101 340
12 41 02
47
1 EW Main Pipe Rack
47.00
2
5
PP PURIFICATION PIPE RACK 47.21
NS Main Pipe Rack
47.20
Sub Area
STEEL STRUCTURE PROGRESS AND PLAN (13
S. No DescriptionUnit
CURRENT STATUS (TONNES)
Saturday, June 02, 2012
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 5/9
Branch Men Power Crane Supervisor
Total
Qty (Tons)
P
(
Sub Area
STEEL STRUCTURE PROGRESS AND PLAN (1342)
S. No DescriptionUnit
CURRENT STATUS (TONNES)
Saturday, June 02, 2012
28PE4 Extrusion substation cable rack 47.00 47-I-0007 79
29PE5 Extrusion substation cable rack 41.92 41.-I-9202 29
30PE4 Sub rack and surge tank structure 41.03 41-I-3005 55
31PE5 Sub rack and surge tank structure 42.03 42-I-3005 55
32
Powder Silos 41.71
41-I-7101, 7102,
7103; 42-I-7151,
7152,7153 388
33Blender Silos 30.10 840
34Secondary Steel Str 985
Torquing All Areas24
Tanveer
Total 120 11922
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 6/9
Branch
Total
Qty (Tons)
47-I-0001A 54
47-I-0001B 23
47-I-0001C 85
47-I-0001D 102
47-I-0001E 81
47-I-0001F 89
47-I-0001G 99
47-I-0001H 103
Total 636
47-I-0002A 44
47-I-0002B 55
47-I-0002C 44
47-I-0002D 88
47-I-0002E 62
Total 293
3PROCESS PURIFICATION PIPE RACK 47-I-2001 290
4 PROCESS PURIFICATION substation rack 47-I-2004 40
47-I-2104 82
47-I-2101 35
6PE PURIFICATION STEEL STR. 47.20 47-I-2002 688
7 PP PURIFICATION STEEL STR. 47.92 195
8 PE Cocatalyst Steel Structure 47.60 47-I-6002 144
9PE4/PE5 Powder Compressors P/R, Pneumatic haulage 41.72 41-I-7201 62
10PE4 KO DRUM 41.00 41-I-0001 190
11 PROCESS PE-4 PR 41.01 41-I-0101 340
12 PROCESS PE-4 Substation 41.02 41-I-0201 48
5
PP PURIFICATION PIPE RACK 47.21
47
1 EW Main Pipe Rack
47.00
2 NS Main Pipe Rack
47.20
Unit S. No Description Sub Area
CURRENT STATUS (TONNES)
Sunday, May 27, 2012
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 7/9
Branch
Total
Qty (Tons)
Unit S. No Description Sub Area
CURRENT STATUS (TONNES)
Sunday, May 27, 2012
19PROCESS PE-5 PR
42.0142-I-0101 340
20PROCESS PE-5 Substation
42.0242-I-0201 48
21PE5 Loop Reactor Steel Structure 42.30 42-I-3004 64
22 PE5 Dump Tank Steel Str. 42.30 42-I-3002 243
23 PE5 Catalyst Steel Str. 42.30 42-I-3003 114
24PE5 Purge Bin Gas Phase Structure
42.4042-I-4002 1239
25 PE5 Recovery Structure 42.50 42-I-5001 436
26PE4 Extrusion Steel structure 41.70 839
27PE5 Extrusion Steel structure 42.70 839
28PE4 Extrusion substation cable rack 47.00 47-I-0007 79
29PE5 Extrusion substation cable rack 41.92 41.-I-9202 29
30PE4 Sub rack and surge tank structure 41.03 41-I-3005 55
31PE5 Sub rack and surge tank structure 42.03 42-I-3005 55
32Powder Silos 41.71
41-I-7101, 7102, 7103; 42-I-
7151, 7152,7153 388
33Blender Silos 30.10 840
34Secondary Steel Str 985
42
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 8/9
May May
Plan LF
Branch Planned Planned
1 EW Main Pipe Rack47-I-0001A 636 14 Handrails a
47-I-0002A
47-I-0002B
47-I-0002C
47-I-0002D
47-I-0002E
Total 293 62 0 10 Road crossi
3PROCESS PURIFICATION PIPE RACK 47-I-2001 290 56 0 15
PROCESS PURIFICATION substation rack 47-I-2004 40 15 0 0
47-I-2104 82 22 0 0
47-I-2101 35 8 0 0
4PE PURIFICATION STEEL STR. 47.20 47-I-2002 688 688 180 120 70 T constr
5PE4/PE5 Powder Compressors P/R,
Pneumatic haulage 41.72 41-I-7201 62 13 0 4 Platform ha
6PE4 KO DRUM 41.00 41-I-0001 190 113 45 35 Area will be
7 PROCESS PE-4 PR 41.01 41-I-0101 340 72 38 7 Piping activ
PROCESS PE-4 Substation41.02
41-I-0201 48 17 0 0 Road crossi
8PE4 Loop Reactor Steel Structure 41.30 41-I-3004 64 64 29 30 Interface w
9PE4 Dump Tank Steel Str. 41.30 41-I-3002 243 243 54 50
Interface w2012, May
10PE4 Catalyst Steel Str. 41.30 41-I-3003 114 114 54 20 Interface w
11
PE4 Purge Bin Gas Phase Structure
41.40
41-I-4002 1239 680 120 130
47
41
47.00
2
Total Balance
STEEL STRUCTURE PLAN
Summary s
PP PURIFICATION PIPE RACK 47.21
Description Sub AreaUnit
NS Main Pipe Rack
S. No
7/31/2019 Plan and Summary Steel Structure 01 June ModifiedfHS
http://slidepdf.com/reader/full/plan-and-summary-steel-structure-01-june-modifiedfhs 9/9
May May
Plan LF
Branch Planned PlannedTotal Balance
STEEL STRUCTURE PLAN
Summary s
Description Sub AreaUnit S. No
12
PE4 Recovery Structure 41.50 41-I-5001 436 229 0 30 Bolts not av
13 PE5 KO DRUM 42.00 42-I-0001 190 108 45 45
14PROCESS PE-5 PR
42.0142-I-0101 340 74 23 15 Piping activ
PROCESS PE-5 Substation42.02
42-I-0201 48 18 0 0 Road crossi
15PE5 Loop Reactor Steel Structure 42.30 42-I-3004 64 64 15 0 Equipment
16 PE5 Dump Tank Steel Str. 42.30 42-I-3002 243 243 30 0 Equipment
17PE5 Catalyst Steel Str. 42.30 42-I-3003 114 107 26 0 Equipment
18
PE5 Purge Bin Gas Phase Structure
42.40
42-I-4002 1239 828 130 84
Structure to
into accoun
date: 30 Ju
19
PE5 Recovery Structure 42.50 42-I-5001 436 224 0 20 Bolts not av
PE4 Extrusion substation cable rack 47.00 47-I-0007 79 79
PE5 Extrusion substation cable rack 41.92 41.-I-9202 29 29
20PE4 Sub rack and surge tank structure 41.03 41-I-3005 55 32 20 20 Erection in
21PE5 Sub rack and surge tank structure 42.03 42-I-3005 55 32 20 20
22
Powder Silos 41.71
41-I-7101, 7102,
7103; 42-I-7101,
7152,7153 388 388 73 45 45T erectab
Total 11922 8476 902 700