pittsburgh parking authority 9 and penn avenue replacement ......jan 09, 2020 · gate for two way...
TRANSCRIPT
December 23, 2019
1
Pittsburgh Parking Authority
9th and Penn Avenue
Replacement Garage
Planning Commission
Design Review Process
New Construction
December 23, 2019
December 23, 2019LOCATION MAP
2
December 23, 2019INTRODUCTION
• Location
• 136 9th Street, Pittsburgh, PA
• Zoning District: GT-C (Golden Triangle – C)
• Size
• Demolition of existing 586 space parking structure
• Build a 692 space facility
• Operations
• Functional and efficient for ease of operations
• Durable cast in place p/t structure with extended life
• Community
• Revitalization and building block for future development
• Architecturally sensitive, and aesthetically enhanced
• Safe pedestrian connections to destinations
• Creation of urban open space (10%)
• Public art requirement (1%)
• Feasibility of re-purposing- ground tier
December 23, 2019SITE PLAN – EXISTING PPAP OWNERSHIP
4
December 23, 2019EXISTING PPAP OWNERSHIP AND DEMOLITION
5
December 23, 2019CONDITIONS PRIOR TO DEMOLITION
December 23, 2019EXISTING PPAP OWNERSHIP AND DEMOLITION
7
December 23, 2019KEY DESIGN AND SITE CONSIDERATIONS
• User groups
• Daily Commuters
• Theatre District Patrons
• North Shore Stadium Events
• Architecture
• Open per code, and natural ventilated structure
• Horizontal lines and screening applications
• Recognition of proposed adjacent uses (hotel, condo)
• Traffic
• Traffic Study
• Primary entry/exits on 9th Street, overflow off of 8th Street
• Close coordination with the Cultural Trust
• Buildings owned by the Cultural Trust
• Maintaining the 3 buildings at corner of 9th and Penn Ave.
• Maintain the Goodyear building to the northwest of garage
• Coordination with demolition of the Duff’s building
• Property line consideration
• Sustainable
• ParkSmart Gold certified / Sustainable strategies
• Green Roof / City Park
December 23, 2019SURROUNDING CONTEXT
9
Intersection of 9th Street and Penn Avenue Benedum Center / Umbrella Sky Exhibit
December 23, 2019SURROUNDING CONTEXT
10
December 23, 2019PERSPECTIVE RENDERINGS / PPAP Existing Parking Structures
11
December 23, 2019RELATIONSHIP TO MASTER PLAN
12
PITTSBURGH CULTURAL TRUST MASTER PLAN
December 23, 2019RELATIONSHIP TO MASTER PLAN
13
December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue
14
Glass guardrail
pedestrian barrier
Cast-In-Place
Concrete
Perforated metal
panel; panels
project at varying
depth; multi-color
Curtainwall
Decorative /
Architectural
Fencing
December 23, 2019PERSPECTIVE RENDERINGS: 8th Street from Penn Avenue
15
Cast-In-Place
Concrete
Glass guardrail
pedestrian barrier
Perforated metal
panel; panels
project at same
depth; one color
Curtainwall
December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Fort Duquesne
16
Glass guardrail
pedestrian barrier
Cast-In-Place
Concrete
Perforated metal
panel; panels
project at varying
depth; multi-color
Curtainwall
Decorative /
Architectural
Fencing
December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue (night)
17
Glass guardrail
pedestrian barrier
Cast-In-Place
Concrete
Perforated metal
panel; panels
project at varying
depth; multi-color
Curtainwall
Decorative /
Architectural
Fencing
December 23, 2019AERIAL RENDERINGS: 9th Street from Fort Duquesne
18
Paver area;
temporary movie
area
Tall grasses
Children’s
playground; sport
turf
Artwork / sculpture
Dog park
Glass guardrail
pedestrian barrier
December 23, 2019WALL PANEL DETAIL
19
Perforated metal
panels in 6 shades
of grey, projecting
from the face of the
garage at varying
distance
December 23, 2019SITE PLAN
20
December 23, 2019SITE PLAN
21
December 23, 2019GROUND TIER PLAN
22
December 23, 2019GROUND TIER PLAN
23
December 23, 2019SECOND TIER PLAN
24
December 23, 2019TYPICAL TIER PLAN
25
December 23, 2019ROOF LEVEL PLAN – GREEN ROOF
26
PEN
N A
VEN
UE
→)
UB
UP
SPEED RAMPUP
PL PL PL PL
PL PL
P L
PL PL PL PL PL
PL
PROPOSED PARKINGGARAGE
URBAN OPEN SPACE ANDPEDESTRIAN ACCESS
EASEMENT #2
ACCESS DRIVEEASEMENT #1
SIT
E D
EV
ELO
PM
EN
T P
LAN
LD-5
NOTES:
1. SOIL CLASSIFICATION;
URBAN LAND (UB) - 0 TO 3 PERCENT SLOPES, PAVEMENT, BUILDINGS AND OTHER ARTIFICIALLY COVERED AREAS.
NOTE: FOR LEGEND OF EXISTING FEATURES SEE SHEET LD-2; NOTES, LEGEND AND ABBREVIATIONS
PIT
TS
BU
RG
H P
AR
KIN
G A
UT
HO
RIT
Y9T
H A
ND
PE
NN
PA
RK
ING
GA
RA
GE
CIT
Y O
F P
ITT
SB
UR
GH
ALL
EG
HE
NY
CO
UN
TY
P
A
N WC
ON
SU
LT
ING
EN
GIN
EE
RS
, IN
C.
151
REN
O A
VEN
UE
NEW
CU
MBE
RLAN
D, P
A 17
070
(717
) 441
-221
6
FA
X (7
17) 6
95-7
449
ww
w.n
avar
row
right
.com
NA
VA
RR
O &W
RIG
HT
DRAFTGoodyear Service Center
- No Access
Cultural Trust TempParking - Access neededfor easement construction
9th & Penn Garage FootprintOccupied Buildings- No Access
Sidewalk Closure forduration of project
9th Street
8th Street
Penn A
venue
Ft D
uquesne Blvd.
TemporaryConstructionFence
Site accessGate for twoway traffic
Tower CraneReach zone -Approx 150ft radius
Limited Delivery Zone Will need coordinated for lane closure
Site accessGate for twoway traffic
ConstructionTrailers
ConstructionAccess Zone
Temporary EasementDumpsterLocation
Main Delivery Zone Crane Hoisting Area
DRAFT - Site Logistics Plan
Developed by Massaro12/02/2019