Williamson Blvd Extension (Funded for Construction) Pioneer Trail I-95/Pioneer Trail Interchange Turn bull B ay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange to be evaluated for need & impacts New Interchan ge Location IJR LRTP ETDM Environmen tal Screening PD&E s o n B l vd S William

Upload: helen-carter

Post on 19-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange

Williamson Blvd Extension (Funded for Construction)

Pioneer Trail

I-95/Pioneer Trail Interchange

Turn

bull B

ay R

d

County & Port Orange request restoring interchange to TPO “unfunded” LRTP

To allow interchange to be evaluated for need & impacts

New Interchange Location

IJR

LRTP

ETDMEnvironmental

Screening

PD&E

son

Blvd

S W

illia

m

Page 2: Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange

I-95/Pioneer Trail Interchange

Previously Proposed Williamson Blvd Extension w/

I-95 Interchange

Pioneer Trail

Turn

bull B

ay R

d

Historical SummaryWilliamson Blvd previously crossed I-95 with interchange• 2010 LRTP (VCATS) Highway Needs Plan (Mar ‘83)

• 2015 LRTP MPO Transportation Study (Nov ‘94)

• 2020 LRTP MPO Transportation Plan (May ‘96)

Williamson Blvd alignment revised to stay west with interchange at Pioneer Trail• 2025 LRTP MPO Transportation Plan (Nov ‘05)

New Interchange Location

son

Blvd

S W

illia

m

Page 3: Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange

S Williamson Blvd Extension (Funded for Construction)

Pioneer Trail

I-95/Pioneer Trail Interchange

Turn

bull B

ay R

d

Historical Summary (Continued)

FDOT Studies:• I-95 Systems Operational Analysis Report - SOAR (Nov ‘05) - Pioneer Trail interchange meets minimum spacing requirements

• I-95 Sketch Interstate Plan - SIP (Mar 2010) – Pioneer Trail interchange included as “new” designated future roadway project

Interchange at I-95/Pioneer Trail not included in LRTP:• 2035 MPO Transportation Plan (Sept ‘10)

New Interchange Location

son

Blvd

S W

illia

m

Page 4: Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange

I-95/Pioneer Trail Interchange

Port Orange Comprehensive Plan Historical Summary

• Initially included in the 1998 Comprehensive Plan Transportation Element – Planned Capital Improvements

• Retained in the 2010 Comprehensive Plan update

Page 5: Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange

Williamson Blvd Extension (Funded for Construction)

Pioneer Trail

I-95/Pioneer Trail Interchange

Turn

bull B

ay R

d

Recommendation:

Restore interchange to TPO “unfunded” LRTP allowing it to be evaluated for need & impacts

New Interchange Location

IJR

LRTP

ETDMEnvironmental

Screening

PD&E