F01-MNC1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :1CP400F01Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100070EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

F01-MNC2Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :1CP400F01Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100071EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-20-M1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP020Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100103EC1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-20-M2Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP020Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100104EC1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-20-B1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP020Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100074EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-20-B2Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP020Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100075EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-21-M1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP021Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100107EC1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-21-B1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP021Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100077EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-22-M1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP022Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100110EC1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-22-B1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP022Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100078EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-23-M1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP023Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100113EC1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-23-M2Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP023Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100114EC1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-23-B1Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP023Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100079EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001

Notification No. E-CP-036

PB-23-B2Pearl GTL Project Liquid Processing Unit (C5)Installation Inspection and Test (Pin Brazing Cable-to-Pipe Connection)Test Facility ID :51CPSTP023Date :Location :DN80 CW PIPE LINE (Phase 1)Sheet No. :E-T4109922-Cable No. :5100080EP1Check/TestCheck/Test ResultConnection areas cleaned to bright metal.Minimum pipe wall thickness not compromised.Connection point minimum of : 150mm from other pin braze connection(s). 200mm from welded pad connection(s) 150mm from any weld.Correct size stud and cable lug used(both proprietary Pin Braze item)Cable lug securely crimped to lugVisual examination of pin brazing connectionHammer test of connectionPull test of connectionPipe/Hydrant to potential(-mV wrt Cu/CuSO4 reference electrode)Cable-to-pipe connection encapsulated and sealed with suitable coating repair/insulation materialHoliday testing(test voltage 5KV/mm) satisfactoryStress relief loop in the cable providedCable routed to the designated test facility location without physical damages and correctly identifiedTest Instrument :Remarks :Completed By:Witnessed By:Approved By:CompanyNameSignatureDateForm No.:T-4.109.922-001