pimpri-chinchwad municipal corporation brts project
DESCRIPTION
SESSION 2A - ‘Bus Rapid Transit – Stories from 2013TRANSCRIPT
Pimpri - Chinchwad Municipal Corporation, Pimpri BRTS PROJECTSShrikanth Savane, Pimpri – Chinchwad Municipal Corporation
WELCOME
Pimpri Chinchwad Municipal Corporation, Pimpri
BRTS PROJECTS
15th APRIL 2013
Would Like to Share
About Pimpri Chinchwad City
Institutional Set Up & Key Responsibilities
BRTS Projects
Progress / Achievements / Work completed
Bus Station
ITMS
.
About Pimpri Chinchwad City
Located towards North of Pune Area of 181 sq.km Population: 1.8 million (approx) PCMC received “BEST CITY “ award
0n 13th Dec.2012 From GOI for its best performance in JnNURM
• Area under Green Cover: 27%
• Annual Budget (2013-2014): Rs.
1800 Cr.
• Credit Rating: AA+ (SO) by CRISIL
Ratings (S&P)
Pimpri Chinchwad at a Glance
Vibrant city in the state of Maharashtra, India
Strong industrial base Small & medium industrial units of about 6,000 Large industrial units of about 50 Auto and ancillary industrial Hub
Presence of International IT Firms
Social and recreational facilities Strong Social Infrastructure with Municipal
Hospitals and Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.
Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.
Population growth
The city has a population of about 1.8 millions growing annually at over 6% p.a. (national average 2.1%)
Growth is fuelled by prospects of economic activity, good quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai
Population Growth
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1951 1961 1971 1981 1991 2001
Year
Pop
ula
tion
PopulationGrowth ofPCMC
Institutional Set-up
Key Responsibilities
Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the year 1982
The body constitutes of Elected wing headed by – Mayor Administrative wing headed by – Municipal Commissioner
We manage about 181 sq.kms of area through our 4 Ward offices We have over 40 departments with a workforce of about 7500
employees
Institutional set up
Institutional set up
We are fully e-governed Corporation We received International Organization of
Standard (ISO) Certification (ISO 9001:2008) for Quality Management System.
Responsible for Area planning
Infrastructure planning, implementation and operation &
maintenance of services in the areas of
Water Supply,
Sewerage and Sanitation,
Solid Waste Management,
Roads and Transportation,
Street lighting,
Health and recreational facilities,
Education (134 primary and 18 secondary schools)
Preservation of natural heritage (river conservation),
Development of housing facility for urban poor/ slums.
Vision
To make Pimpri Chinchwad, a city of and for the next generation
Economically vibrant, attracting top business houses
And meet the requirements of all its citizens
A city to Live, Spend and Entertain
BRTS PROJECTS
BRTS PROJECTS IN PCMC AREA
AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40
KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20
NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80
PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74
Total BRTS Corridor Length = 44.575 Km.
First Intersection
Second Intersection
DESCRIPTION OF REVISIONS INTIALS
A B C
REV DATE
NTS
SCALE:R1/R2 22-12-2006
TYPICAL CROSS SECTION
61 m BRTS CROSS SECTION
45 M BRTS CROSS SECTIONREVISED TYPICAL CROSS SECTION FOR 45.0M
300
REVISED TYPICAL CROSS SECTION WITH BUS STOP
300
CLIENTPROJECTDRAWING TITLE
SCALE-:1:100
DATEREV.
DATE : -09/12/2011DRG. NO:-CVKCPL/PCMC/ANNUITY/KALEWADI/CROSS-SECTION/45.00m/04
STATUS
C.V.KAND CONSULTANTSPRIVATE LIMITED
CONSTRUCTUION OF BRTS CORRIDORKALEWADI TO DEHU-ALANDI ROAD
(PACKAGE-II)FROM CH:-1+600 TO 3+000
410
8
.
11
icaM
kiTbaQda janaihtaya
mahanagarpailaka
REVISED TYPICAL CROSS SECTION & PLANFOR 45.00 m WIDE ROAD
PIMPRI CHINCHWAD MUNICIPAL CORPORATION15/07/2011R1
R2 08/12/2011
R3 22/12/2011
SHEET 1 OF 1
Corridor No 1 2 3 4
BRT CORRIDOR
Pune-Mumbai Highway
Aundh Ravet RoadNashik Phata To
WakadKalewadi Phata to
Dehu Alandi
Length in KM. 12.00 14.50 8.0010.275
Expected Project Cost
on completion Rs. In. Cr.
254.59 305.00 227.00 241.00
Expenditure as on 31St March 2013. Rs. In.
Cr.
254.59 229.65 180.82 86.50
Expected Completion
Date Dec 2013 Dec 2013 Dec 2013 Oct. 2014
BRTS Project Status
BRTS Project statusCorridor No 1 2 3 4
BRT CORRIDORPune-Mumbai Highway Aundh Ravet Road Nashik Phata To Wakad
Kalewadi Phata to Dehu Alandi
Present Status
Work is completed 16 BRT bus
stations are under construction on PPP basis.
Remaining 20 BRT bus stations will be completed by Dec-13.
Out of 16 BRT bus stations 12 bus stations completed & remaining 4 are in progress.
Unless all bus stations (16+20) completed BRT service cannot be started, so far all bus station will be completed by Dec. 13.
Length 14.50 Km- length 10.5 km completed.
4.00 km work is in Progress. Defence land is transferred in the month of Aug.12.
20 bus stations are planned & execution will be completed by Dec 13.
Work is in Progress. 83% of flyover work is
completed and total completion is expected by Oct. 13.
Road work is in Progress. Defence land is transferred in the month of Aug.12.
75% of road work is completed other than WP in High Court/District Court against land acquisition. (600m length of road out of 7.90 km).
15 bus stations are planned & execution will be completed by Dec 13.
Work is in Progress.
28% of flyover work is completed and stipulated date of completion is Oct. 13 and extension of time requested is 31st Aug 2014.
Road work is in Progress.
WP in High Court against land acquisition. Rehabilitation & Resettlement of 184 PAP’s is in process (1.6 km out of 10.275).
19 bus stations are planned & execution will be completed by Oct 14.
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – IV WORK COMPLETED
SECTION – III WORK COMPLETED
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – VI WORK COMPLETED
SECTION – V WORK COMPLETED
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – I & II WORK IN PROGRESS
SECTION – VII WORK COMPLETED
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)
NASHIK PHATA JUNCTION - 2nd Tier
NASHIK PHATA JUNCTION - 1st Tier
BRTS SUTP PROJECT STATUS BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)
ROAD WORK IN PROGRESS
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)
EMPIRE ESTATE PORTION
SEGEMENT CASTING YARD
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)
ROAD WORK IN PROGRESS
BUS STATION
Conceptual Layout
BRTS STATIONS -51.0 X 3.0 M SIZE FOR ONE SIDE DOCKING
Conceptual Layout
BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING
BRT BUS STOP DESIGN
The Intelligent Transit Management System (ITMS) shall comprise of the following distinctive applications.
• Automated Fare Collection System• GPS based Fleet Monitoring System• Vehicle Scheduling & Dispatch System• Passenger Information System• Financial Management System / Central Clearing House System• Depot Management System & Bus Terminal Management System• Incident Management System / Call centre Management System• Business Intelligent System• Enterprise Management System
The estimated cost is Rs.19.07 Cr. for both hardware & software part of ITMS. The total O & M cost for 6 years on annuity basis is worked out as Rs. 30.65 Cr.
ITMS
Technical Studies
Procurement of Consultant for Monitoring & Evaluation of BTRS services on all 4 corridors in PCMC area
—
IBI Group, Canada has been appointed on 1st March 2013. Access plan to BRT corridor by Pedestrian & NMT–
Proposal from MVA Asia consultancy is in process of acceptance. Parking policy & Management --
Proposal from UMTC consultancy is in process of acceptance. Promotion & Out reach Program –
Proposal from IBI Group Canada consultancy is in process of acceptance.
Consultancy for O & D survey of corridor No. 3&4 –
Aakar Abhinav,Mumbai has been appointed on 1st March 2013. Consultancy for Safety Audit of Pune –Mumbai Road.
Proposal from IIT Mumbai (Powai) is in process of acceptance.