    Pilrig Park Improvement Plan

    Aim 1: to ensure Pilrig Park is welcoming and accessible to all possible users

    Objectives Action Lead Timetable Status

    1.1 To ensure

    consistent, up-to-

    date signage

    throughout

    Keep all notice boards up to date with

    relevant information

    Park

    Rangers

    On-going on-going

    Identify signage requirements (e.g

    directional signs, interpretation, site

    maps) and put costed plan together

    2013 -

    1.2 To ensure high

    quality welcoming

    entrance points

    Develop project to create designed

    gateways to mark key entrance nodes.

    2015 -

    1.3 To enhance and

    promote cycle path

    network

    2012

    Install cycle racks at play area CC&L

    parks team

    2014

    Aim 2 : to ensure the safety of all staff and users of the park

    Objectives Action Lead Timetable Status

    2.1 Reduce anti-

    social behaviour

    Work with community safety and police

    to tackle problems.

    CPO On-going Started

    Work with Environmental Wardens to

    reduce dog fouling (campaigns, green

    dog walkers, etc)

    CC&L

    parks

    team

    On-going Started

    Tackle graffiti problem work with

    community safety and environmental

    wardens

    CC&L

    parks

    team

    On-going Started

    2.2 Well maintained

    play area

    CPO 2013

    Carry out weekly checks of play area to

    ensure Landscape Quality Standards

    are met (e.g. surface regulation, litter,

    glass)

    Park

    Ranger

    On-going Started

    2.3 Reduce

    vehicles in park

    Work with football clubs to stop

    unauthorised vehicles in park.

    CC&L

    parks

    team

    2012 Started

  • 7/28/2019 Pilrig park Development Plan

    2/4

    Aim 3: to improve the range of facilities in Pilrig Park

    3.1 Enhance

    current facilities of

    park

    Upgrade of children play areas. P&G Play

    team

    2014

    (dependi

    ng on

    capital

    funding)

    -

    Use developer contributions (and

    explore other funding streams)

    2017 -

    3.3 Create picnic

    area

    Install picnic tables and consider BBQ

    slabs

    CC&L

    parks

    team

    2014 -

    3.4 Install further

    seating

    Find locations where seats have been

    removed and seek funding to install new

    seats

    CC&L

    parks

    team

    2013 -

    Aim 4: to maintain the highest standards cleanliness, grounds and building maintenance

    Objectives Action Lead Timetable Status

    4.1 To ensure a

    high standard of

    waste management

    Replace damaged and old style bins. CC&L

    parks

    team

    2013 Feb

    Sports clubs to remove litter after

    matches

    Sports

    clubs

    2013 Started

    Increase frequency of bin servicing at

    peak times

    TF 2013 -

    Identify benches/bins for programme of

    painting/cleaning

    CC&L

    parks

    team

    2013 -

    4.2 To improve

    standard of

    infrastructure

    (railings, pathways

    etc)

    Review of assets Park

    Ranger

    2012 Started

    Survey all paths and develop a costed

    plan for upgrading network.

    CC&L

    parks

    team

    2013

    Apply for capital funding to upgrade

    paths

    CC&L

    parks

    team

    2013

    Carry out consultation for future planting

    e.g herbaceous perennials (beefriendly)

    CPO &

    GreenerLeith

    2013 -

  • 7/28/2019 Pilrig park Development Plan

    3/4

    Remove tree stumps to improve ease of

    grass cutting

    Forestry

    Service

    2013

    Re-instate grass where stumps have

    been removed

    CC&L

    parks

    team

    2013 -

    Aim 5: To promote biodiversity and sustainability through appropriate management

    Objectives Action Lead Timetable Status

    5.1 Promote

    management for

    biodiversity

    Create a bee caf (link with Action 4.4) Greener

    Leith

    2013 -

    Identify appropriate actions from the

    Biodiversity options for parks and

    greenspaces a guide for park

    managers

    CPO 2014 -

    5.2 To maintain and

    increase tree stock

    Assess condition and manage current

    tree stock

    Forestry

    Service

    Annual On-

    going

    Carryout annual survey for Dutch Elm

    Disease

    Forestry

    Service

    Annual On-

    going

    Create a programme for replacement

    and new structural planting of forest and

    amenity species

    Forestry

    Service.

    2013 Started

    Aim 6: To maintain and promote the historic landscape

    Objectives Action Lead Timetable Status

    Aim 7: To encourage and promote community involvement and engagement

    Objectives Action Lead Timetable Status7.1 To engage with

    local community

    Promote Parks and Greenspace Survey CC&L

    parks

    team

    On-going -

    Identify range of potential community led

    projects (e.g Community garden, bee

    caf etc)

    CC&L

    parks

    team

    2013 -

    7.2 Improve

    promotion of park

    Review and update web content KR 2013

    7.3 Ensure robust Undertake annual review of events that Annual -

  • 7/28/2019 Pilrig park Development Plan

    4/4

    event management have happened.

    Aim 8: To provide a responsive, flexible and high quality management service

    Objectives Action Lead Timetable Status8.1 Ensure co-

    ordinated approach

    to management

    Set up a steering group (key

    stakeholders) to develop a Park

    Improvement Plan

    CPO 2013

    8.2 Apply for Green Flag status CC&L

    parks

    team

    -

    The following documents and information have been used to develop a draft Park ImprovementPlan for Pilrig Park:

    Park Quality Assessments (annual)

    Parks and Greenspace on-line survey responses (2011)

    Park Audit (2001)