Pilot Scale Membrane BioreactorStudy at King County

Amanda McInnis Bob BucherSusan Anderson J.B. Neethling

Page 2: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

King County Water Reuse Pilot Facilities

Page 3: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

MBR Trains

Headworks Disinfect•Class A•All streams

Membrane BioReactor (nitrification only)

Headworks Disinfect

•Class A•All streams•All groundwater

Membrane BioReactor (BNR)

Page 4: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

MBR Trains

Headworks Disinfect

•Class A•Wetlands•All streams•All groundwater

•All lakes

MBR (nitrification)

Reverse Osmosis

Headworks Disinfect

•Class A•Wetlands•All streams•All groundwater

•All lakes

MBR (BNR)

Reverse Osmosis

Page 5: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Conventional Treatment

Aeration Basin

RAS

Influent

Secondary Clarifier

MLSS

Page 6: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

What Is a Membrane Bioreactor (MBR)?

Aeration Basin Membrane Tank

Vacuum Pump

RAS=MLSS

Influent

Page 7: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Presentation Overview

• Study overview• Turbidity removal• Peaking performance• Membrane Cleaning• Nitrogen Removal• Phosphorous Removal• Coliform removal• Operation at Low SRT

Page 8: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

MBR 3D View

Permeate

RAS/WAS

Membrane Cassette

Mixed Liquor

Diffusers

Page 9: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

System Schematic

Page 10: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Pilot Study Overview Process

Goal Actual

Aerobic TSA

(days)

Actual Total TSA

(days)

Average Flow (gpm)

Average Flux * (gfd)

Relax mode or

Backpulse mode

N/dN -- -- 5.4 11.7 Relax 8/29-9-13

Backpulse 9/14

N/dN 10.0 -- 5.3 11.5 Backpulse N/dN 10.0 15.0 7.4 16.1 Backpulse

11/16-12/2 Relax 12/3

N/dN -- -- 5.5 12.0 Relax N/dN 5.6 8.5 5.5 12.0 Relax N/dN -- -- 5.5 12.0 Relax Bio-P -- -- 5.5 12.0 Relax Bio-P 6.1 7.4 7.8 16.9 Relax

Page 11: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Process Overview

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

8/31 9/14 9/28 10/12 10/26 11/9 11/23 12/7 12/21 1/4 1/18 2/1 2/15 3/1 3/15

mg/

L

0.00

5.00

10.00

15.00

20.00

25.00

30.00

days

MLSS-Aerobic Tank Total TSA Aerobic TSA

Phase 3aPhase 1c

Phase 2a

Startup Phase 1a

Phase 1b Phase 3bPhase 2b

Page 12: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Turbidity Performance

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

8/31 9/14 9/28 10/12 10/26 11/9 11/23 12/7 12/21 1/4 1/18 2/1 2/15 3/1 3/15

ntu

0

5

10

15

20

25

30

gfd

Effluent Turbidity Temperature Corrected Flux (20 deg C)

Phase 3aPhase 1c

Phase 2a

Startup Phase 1a

Phase 1b Phase 3bPhase 2b

Page 13: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Turbidity Performance

• Produced consistently low (<0.02 NTU) effluent turbidities, even under peak flow conditions.

Page 14: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

4-hour Peaking Test

0

1

2

3

4

5

6

7

8

9

6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM

mg/

L/in

Hg

0

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.1

NTU

Dissolved Oxygen Pressure Before Backpulse Pressure after Backpulse Turbidity

Turbidity Probe removed

6 gpm 9 gpm 8 gpm

Page 15: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Peaking Performance• System operated for 22 days

at an avg flux of 20 gfd with effluent turbidity avg 0.02 NTU.

• The system responded well to (3) 4-hour peaking tests where flux was increased to >20 gfd.

• Effluent turbidities remained constant in the peaking tests with effluent turbidities 0.01 to 0.03 NTU.

Page 16: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Membrane Cleaning

0

5

10

15

20

25

8/31 9/14 9/28 10/12 10/26 11/9 11/23 12/7 12/21 1/4 1/18 2/1 2/15 3/1 3/15

in H

g;gf

d

Pre-Backpulse/Relax Vacuum Post Backpulse/Relax Vacuum Temperature Corrected Flux (20 deg C)

Relax Mode

Backpulse Mode Relax Mode

Stopped Maintenance Cleans

PerformedMaintenance Clean

Performed Disinfection Clean 10/15

Page 17: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Nitrogen RemovalProcess Goal Actual

Total TSA (days)

Average Flux (gfd)

Effluent NH4 (mg/L)

Effluent NO3 (mg/L)

-- 11.7 0.04 6.93

N/dN -- 11.5 0.03 7.90 N/dN 15.0 16.1 0.31 5.23 N/dN -- 12.0 0.40 5.88 N/dN 8.5 12.0 0.02 7.42 N/dN -- 12.0 0.02 9.37 Bio-P -- 12.0 0.02 8.52 Bio-P 7.4 16.9 0.34 9.53

Page 18: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Phosphorous RemovalProcess Goal Actual

Total TSA (days)

Average Flux (gfd)

Effluent TP (mg/L)

Effluent Ortho-P (mg/L)

-- 11.7 3.64 2.90

N/dN -- 11.5 1.62 1.39 N/dN 15.0 16.1 0.52 0.97 N/dN -- 12.0 0.62 0.52 N/dN 8.5 12.0 0.73 0.72 N/dN -- 12.0 1.09 1.00 Bio-P -- 12.0 0.95 0.92 Bio-P 7.4 16.9 0.97 0.92

Page 19: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Phosphorous Removal

• Unit was not designed for biological P removal.

• Did not meet removal goals

• No improvement in removal when process was modified for bio-P

Page 20: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Coliform Removal

• During Start-up, effluent total Coliform concentrations were as high as 1.7 x 103

CFU/100 mL. • Effluent Coliform levels

dropped in later phases and no Coliform was detected for the remainder of the study.

Page 21: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Operation at Low SRT

• The system operated successfully at a total SRT of 8 days and an aerobic SRT of 6 days for >3 months.

• The system did not have operation difficulties with high vacuum pressures

Page 22: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Operation at Low SRT

• Complete ammonia removal (<0.02 mg/L)was achieved

• Low effluent turbidities (0.02 NTU average) were achieved during the low SRT period.

Page 23: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Reverse Osmosis (RO)

• Four months of operation

• Feed trials

Page 24: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Reverse Osmosis (RO)Issue Pilot Experience

Performance TDS < 120 mg/L (>92%) TOC < 1.6 mg/L (83%) NH4-N < 0.02 mg/L (>90%) NO3-N < 0.2 mg/L (>97.5%) TP < 0.02 mg/L (>99%) Metals < MDL

Enhanced Treatment N/A

Startup Immediate

Unattended Operation Automatic/unattended

Flux 9 gfd

Footprint 2,000 to 5,000 sf/mgd

Page 25: Pilot Scale Membrane Bioreactor Study at King County · 2011-04-06 · Pilot Scale Membrane Bioreactor Study at King County Amanda McInnis . Bob Bucher. Susan Anderson . J.B. Neethling

Acknowledgement• King County Technology Assessment Program • West Point Treatment Plant Process Group• West Point Treatment Plant Process Laboratory• King County Environmental Laboratory• West Point Treatment Plant O & M Staff • King County Construction Management Staff• HDR (Bruce Willey, JB Neethling, Michael Norton)• B&V (Cindy Wallis-Lage)• Zenon Environmental, Inc.