Pilot cases description. 2 nd Steering Committee Meeting Portugal, 8 th and 9 th July 2013 Arronches (PORTUGAL). Regional Energy and Environment Agency from North Alentejo (PORTUGAL). GREEN PARTNERSHIPS IN ALTO ALENTEJO REGION. MUNICIPALITIES INVOLVED:. PREVIOUS STUDIES. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Pilot  cases  description

Green Partnerships Local Partnerships for Greener Cities and

Regions

Pilot cases description

2nd Steering Committee Meeting

Portugal, 8th and 9th July 2013

Arronches (PORTUGAL)

Regional Energy and Environment Agency from

North Alentejo(PORTUGAL)

Page 2: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 2

GREEN PARTNERSHIPS IN ALTO ALENTEJO REGION

MUNICIPALITIES INVOLVED:

Page 3: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 3

PREVIOUS STUDIES

ENERGY EFFICIENCY IN ALTO ALENTEJO REGION

ENERGY AUDITS TO MUNICIPAL BUILDINGS:

• Arronches:

- Municipal Sports Pavillion - Municipal Town Hall (main building)

Page 4: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 4

PREVIOUS STUDIES

ENERGY USED (SPORTS PAVILLION):

• Electricity

• Propane Gas

BREAKDOWN OF ENERGY CONSUMPTION (SPORTS PAVILLION):

Page 5: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 5

PREVIOUS STUDIES

ENERGY USED (TOWN HALL):

• Electricity

BREAKDOWN OF ENERGY CONSUMPTION (TOWN HALL):

Page 6: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 6

PREVIOUS STUDIES

ENERGY EFFICIENCY IN ALTO ALENTEJO REGION

ENERGY AUDITS TO MUNICIPAL BUILDINGS:

• Avis:

- Ary dos Santos Auditorium

Page 7: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 7

PREVIOUS STUDIES

ENERGY USED

• Electricity

BREAKDOWN OF ENERGY CONSUMPTION

Page 8: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 8

PREVIOUS STUDIES

ENERGY EFFICIENCY IN ALTO ALENTEJO REGION

ENERGY AUDITS TO MUNICIPAL BUILDINGS:

• Crato:

- Municipal Town Hall - Sá Nogueira Building

Page 9: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 9

PREVIOUS STUDIES

ENERGY EFFICIENCY IN ALTO ALENTEJO REGION

ENERGY AUDITS TO MUNICIPAL BUILDINGS:

• Elvas:

- Municipal Town Hall

Page 10: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 10

PREVIOUS STUDIES

ENERGY USED

• Electricity

BREAKDOWN OF ENERGY CONSUMPTION

Page 11: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 11

PREVIOUS STUDIES

ENERGY EFFICIENCY IN ALTO ALENTEJO REGION

ENERGY AUDITS TO MUNICIPAL BUILDINGS:

• Sousel:

- Sports Complex

Page 12: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 12

EXPECTATIONS

IMPLEMENTATION OF THE IMPROVEMENT MEASURES IDENTIFIED

Example of Potential Improvement Measures Identified

1. Installation of power factor compensation systems (capacitor bank)

2. Replacement of the existing lamp by others more efficient (especially LED)

3. Installation of lighting control and regulation devices

4. Implementation of energy management systems

5. Instalation of a photovoltaic solar system

Page 13: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 13

Local action group

ACRONYM FULL NAME TYPE REPRESENTANT

CIMAAAlto Alentejo Municipalities

AssociationPublic Carlos Nogueiro

ADRALRegional

Development Agency of Alentejo

Public Sónia Mendes

IPPPolytechnic Institute of Portalegre

Public Paulo Brito

RNAEEnergy and

Environment Agencies National

NetworkPrivate Luís Fernandes

Page 14: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 14

Local action group

NAME INITIATION PLANNING IMPLEMENTATION MONITORING INFORMED/CONSENSUS

CIMAA 4 4 4 2 2

ADRAL 3 1 2 2 3

IPP 1 2 3 4 3

RNAE 2 3 4 4 4

Page 15: Pilot  cases  description

Green PartnershipsArronches, 8 - 10 July 2013 15

Contacts

AREANATejo

E-mail: [email protected]: www.areanatejo.ptTel.: (+351) 245 309 084

Tiago Gaio (Manager): [email protected]

Ana Lacão (Financial & Dissemination):[email protected]élia Pereira (Technical):

[email protected] Saldanha (Technical):

[email protected]