pilot cases description
DESCRIPTION
Pilot cases description. 2 nd Steering Committee Meeting Portugal, 8 th and 9 th July 2013 Arronches (PORTUGAL). Regional Energy and Environment Agency from North Alentejo (PORTUGAL). GREEN PARTNERSHIPS IN ALTO ALENTEJO REGION. MUNICIPALITIES INVOLVED:. PREVIOUS STUDIES. - PowerPoint PPT PresentationTRANSCRIPT
Green Partnerships Local Partnerships for Greener Cities and
Regions
Pilot cases description
2nd Steering Committee Meeting
Portugal, 8th and 9th July 2013
Arronches (PORTUGAL)
Regional Energy and Environment Agency from
North Alentejo(PORTUGAL)
Green PartnershipsArronches, 8 - 10 July 2013 2
GREEN PARTNERSHIPS IN ALTO ALENTEJO REGION
MUNICIPALITIES INVOLVED:
Green PartnershipsArronches, 8 - 10 July 2013 3
PREVIOUS STUDIES
ENERGY EFFICIENCY IN ALTO ALENTEJO REGION
ENERGY AUDITS TO MUNICIPAL BUILDINGS:
• Arronches:
- Municipal Sports Pavillion - Municipal Town Hall (main building)
Green PartnershipsArronches, 8 - 10 July 2013 4
PREVIOUS STUDIES
ENERGY USED (SPORTS PAVILLION):
• Electricity
• Propane Gas
BREAKDOWN OF ENERGY CONSUMPTION (SPORTS PAVILLION):
Green PartnershipsArronches, 8 - 10 July 2013 5
PREVIOUS STUDIES
ENERGY USED (TOWN HALL):
• Electricity
BREAKDOWN OF ENERGY CONSUMPTION (TOWN HALL):
Green PartnershipsArronches, 8 - 10 July 2013 6
PREVIOUS STUDIES
ENERGY EFFICIENCY IN ALTO ALENTEJO REGION
ENERGY AUDITS TO MUNICIPAL BUILDINGS:
• Avis:
- Ary dos Santos Auditorium
Green PartnershipsArronches, 8 - 10 July 2013 7
PREVIOUS STUDIES
ENERGY USED
• Electricity
BREAKDOWN OF ENERGY CONSUMPTION
Green PartnershipsArronches, 8 - 10 July 2013 8
PREVIOUS STUDIES
ENERGY EFFICIENCY IN ALTO ALENTEJO REGION
ENERGY AUDITS TO MUNICIPAL BUILDINGS:
• Crato:
- Municipal Town Hall - Sá Nogueira Building
Green PartnershipsArronches, 8 - 10 July 2013 9
PREVIOUS STUDIES
ENERGY EFFICIENCY IN ALTO ALENTEJO REGION
ENERGY AUDITS TO MUNICIPAL BUILDINGS:
• Elvas:
- Municipal Town Hall
Green PartnershipsArronches, 8 - 10 July 2013 10
PREVIOUS STUDIES
ENERGY USED
• Electricity
BREAKDOWN OF ENERGY CONSUMPTION
Green PartnershipsArronches, 8 - 10 July 2013 11
PREVIOUS STUDIES
ENERGY EFFICIENCY IN ALTO ALENTEJO REGION
ENERGY AUDITS TO MUNICIPAL BUILDINGS:
• Sousel:
- Sports Complex
Green PartnershipsArronches, 8 - 10 July 2013 12
EXPECTATIONS
IMPLEMENTATION OF THE IMPROVEMENT MEASURES IDENTIFIED
Example of Potential Improvement Measures Identified
1. Installation of power factor compensation systems (capacitor bank)
2. Replacement of the existing lamp by others more efficient (especially LED)
3. Installation of lighting control and regulation devices
4. Implementation of energy management systems
5. Instalation of a photovoltaic solar system
Green PartnershipsArronches, 8 - 10 July 2013 13
Local action group
ACRONYM FULL NAME TYPE REPRESENTANT
CIMAAAlto Alentejo Municipalities
AssociationPublic Carlos Nogueiro
ADRALRegional
Development Agency of Alentejo
Public Sónia Mendes
IPPPolytechnic Institute of Portalegre
Public Paulo Brito
RNAEEnergy and
Environment Agencies National
NetworkPrivate Luís Fernandes
Green PartnershipsArronches, 8 - 10 July 2013 14
Local action group
NAME INITIATION PLANNING IMPLEMENTATION MONITORING INFORMED/CONSENSUS
CIMAA 4 4 4 2 2
ADRAL 3 1 2 2 3
IPP 1 2 3 4 3
RNAE 2 3 4 4 4
Green PartnershipsArronches, 8 - 10 July 2013 15
Contacts
AREANATejo
E-mail: [email protected]: www.areanatejo.ptTel.: (+351) 245 309 084
Tiago Gaio (Manager): [email protected]
Ana Lacão (Financial & Dissemination):[email protected]élia Pereira (Technical):
[email protected] Saldanha (Technical):