Page 1 of 24 B I D T A B U L A T I O N BID OPENING DATE 07/01/14 IN PIER 1, SAN FRANCISCO CONTRACT NUMBER 2765 PROJECT NAME PIER 35 BUILDING & ROOF REPAIR PROJECT ALTERNATE PRIORITIES: 1 THEN 2 LBE GOAL: 19% TOTAL NUMBER OF CALENDAR DAYS: 365 ANNOUNCED CONSTRUCTION BUDGET: 2,250,000 NUMBER OF BIDDERS: 11 ESTIMATE: 2,250,000 LOW TOTAL BID PRICE: (APPARENT LOW BASE BID + ALT) 2,014,648 BIDDER ID NO. BASE BID ALT #1 ALT #2 APPARENT BID RANK BIDDER INFORMATION 1 2,070,000 37,000 60,000 5 WEST BAY BUILDERS PAUL THOMPSON, PRESIDENT 250 BEL MARIN KEYS BLVD, BLDG A NOVATO, CA. 94949 [email protected] 2 2,027,000 33,000 34,000 4 PIONEER CONTRACTORS INC. HERBERT LI, PRESIDENT 1485 ARMSTRONG AVE SAN FRANCISCO, CA. 94124 [email protected] 3 1,973,800 42,000 32,000 2 SVALA CONSTRUCTION INC. INESSA SVIDLER, PRESIDENT 139 MENDOSA AVE. SAN FRANCISCO, CA 94116 [email protected] 4 2,237,000 38,750 15,625 8 MH CONSTRUCTION MATTHEW HUEY, PRESIDENT 1630 7 TH STREET SAN FRANCISCO, CA 94107 [email protected] 5 1,998,556 8,864 33,590 3 ROEBUCK CONSTRUCTION INC. RUAIRI MURPHY, PRESIDENT 1780 OAKDALE AVE SAN FRANCISCO, CA 94124 [email protected]

Upload: others

Post on 03-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 1 of 24

B I D T A B U L A T I O N BID OPENING DATE 07/01/14 IN PIER 1, SAN FRANCISCO CONTRACT NUMBER 2765 PROJECT NAME PIER 35 BUILDING & ROOF REPAIR PROJECT ALTERNATE PRIORITIES: 1 THEN 2

LBE GOAL: 19% TOTAL NUMBER OF CALENDAR DAYS: 365 ANNOUNCED CONSTRUCTION BUDGET: 2,250,000

NUMBER OF BIDDERS: 11 ESTIMATE: 2,250,000 LOW TOTAL BID PRICE:

(APPARENT LOW BASE BID + ALT) 2,014,648

BIDDER ID NO.

BASE BID ALT #1 ALT #2 APPARENT BID RANK

BIDDER INFORMATION

1 2,070,000 37,000 60,000 5

WEST BAY BUILDERS PAUL THOMPSON, PRESIDENT 250 BEL MARIN KEYS BLVD, BLDG A NOVATO, CA. 94949 [email protected]

2 2,027,000 33,000 34,000 4

PIONEER CONTRACTORS INC. HERBERT LI, PRESIDENT 1485 ARMSTRONG AVE SAN FRANCISCO, CA. 94124 [email protected]

3 1,973,800 42,000 32,000 2

SVALA CONSTRUCTION INC. INESSA SVIDLER, PRESIDENT 139 MENDOSA AVE. SAN FRANCISCO, CA 94116 [email protected]

4 2,237,000 38,750 15,625 8

MH CONSTRUCTION MATTHEW HUEY, PRESIDENT 1630 7TH STREET SAN FRANCISCO, CA 94107 [email protected]

5 1,998,556 8,864 33,590 3

ROEBUCK CONSTRUCTION INC. RUAIRI MURPHY, PRESIDENT 1780 OAKDALE AVE SAN FRANCISCO, CA 94124 [email protected]

Page 2: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 2 of 24

BIDDER ID NO.

BASE BID ALT #1 ALT #2 APPARENT BID RANK

BIDDER INFORMATION

6 1,867,648 85,000 62,000 1

ROOFING CONSTRUCTORS INC dba WESTERN ROOFING SERVICE MARK BLEDSOE, PRESIDENT 15002 WICKS BOULEVARD SAN LEANDRO, CA 94577 [email protected]

7 2,450,597 38,948 31,685 10

GALLIERA INC dba TRICO CONSTRUCTION CARMEN BRUSCHERA, PRESIDENT 981 HOWARD STREET SAN FRANCISCO, CA 94103 [email protected]

8 2,454,600 35,000 15,000 11

BEST CONTRACTING SERVICES, INC. MOHAMMAD H. BEIGI, COO/GENERAL MANAGER 4301 BETTENCOURT WAY UNION CITY, CA 94587 [email protected]

9 2,117,030 20,845 21,966 6

FIDELITY ROOF COMPANY KENNETH WHITE, PRESIDENT 1075 40TH STREET OAKLAND, CA 94608 [email protected]

10 2,359,995 39,000 25,000 9

ANVIL BUILDERS, INC HEIN TRAN, CEO & PRESIDENT 1475 DONNER AVE, 2ND FLR SAN FRANCISCO, CA 94124 [email protected]

11 2,160,000 18,000 64,000 7

CLW BUILDERS INC DAVID LIANG, PRESIDENT 1431 OCEAN AVE SAN FRANCISCO, CA 94112 [email protected]

Page 3: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 3 of 24

SCHEDULE OF BID PRICES WEST BAY BUILDERS

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,647,000

2 Repair Elevator #1 1 LS $ 200,000

3 Repair Elevator #2 1 LS $ 98,000

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 100,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,070,000

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 37,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 60,000

Page 4: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 4 of 24

SUBCONTRACTOR LIST WEST BAY BUILDERS

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

01 ALLIED ENVIRONMENTAL NO ABATEMENT/ROOF DEMO 240,000 ANDY’S ROOF COMPANY NO ROOFING 153,300 FINE POINT SHEET METAL YES FLASHING 50,000 EXCELLO COATING YES WINDOWS 279,000 RHODES PAINTING AND

DECORATING YES PAINTING 79,000

ASCENT ELEVATOR SERVICES INC.

NO ELEVATORS 288,000

TOTAL 01

$1,089,300

Page 5: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 5 of 24

SCHEDULE OF BID PRICES PIONEER CONTRACTORS INC

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,447,000

2 Repair Elevator #1 1 LS $ 330,000

3 Repair Elevator #2 1 LS $ 140,000

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 85,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,027,000

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 33,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 34,000

Page 6: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 6 of 24

SUBCONTRACTOR LIST PIONEER CONTRACTORS

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

02 FINE POINT SHEET METAL YES SHEET METAL MATERIAL 70,000 TOM’S METAL SPECIALISTS YES DEMOLITION 45,000 EXCELLO COATING YES PAINTING 372,058 HAWAII PACIFIC INTERNATIONAL YES SUPPLIER (ROOFING) 120,000 AMERICAN OVERHEAD NO DOORS 10,400 STAR ELEVATOR NO ELEVATOR 402,000 ALLIANCE CONTRACTING

SERVICES NO DEMOLITION/HAZMAT 191,500

TOTAL 02

$1,210,958

Page 7: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 7 of 24

SCHEDULE OF BID PRICES SVALA CONSTRUCTION, INC

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,506,000

2 Repair Elevator #1 1 LS $ 218,000

3 Repair Elevator #2 1 LS $ 132,000

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 92,800

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $1,973,800

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 42,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 32,000

Page 8: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 8 of 24

SUBCONTRACTOR LIST SVALA CONSTRUCTION, INC

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

03 ECO BAY YES HAZMAT, DEMO 369,000 EVRA CONSTRUCTION, INC. NO CARPENTRY 90,000 SLATER CUSTOM PAINTING YES PAINTING 97,500 RANIS CONSTRUCTION &

ELECTRIC INC YES PLUMBING 25,000

ASCENT ELEVATOR NO ELEVATOR 288,000 ANDY’S ROOFING NO ROOFING 150,300 AHC GLASS NO GLAZING 87,400 FINE POINT SHEET METAL YES SHEET METAL 30,000 CITY LUMBER HARDWARE YES SUPPLIER 4,000 APEX ENGINEERING &

CONSTRUCTION CORP NO ASPHALT 20,000

TOTAL 03

$1,161,200

Page 9: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 9 of 24

SCHEDULE OF BID PRICES MH CONSTRUCTION

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,802,830

2 Repair Elevator #1 1 LS $ 137,363

3 Repair Elevator #2 1 LS $ 211,807

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 60,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,237,000

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 38,750

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 15,625

Page 10: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 10 of 24

SUBCONTRACTOR LIST MH CONSTRUCTION

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

04 MC METAL YES LADDERS, FLASHING & INSTALLATION

18,900

D & S ASSOCIATES YES PLUMBING 6,000 PIONEER CONTRACTORS INC NO DEMO ROOFING, FLASHING, SHEET

METAL WORK, BUTTER 680,000

SCHINDLER ELEVATOR NO ROOFING 309,000 EXCELLO COATING INC YES COATING, GLAZING, PAINTING

WINDOW 372,058

ECO BAY SERVICE INC YES ABATEMENT 189,559

TOTAL 04

$1,575,517

Page 11: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 11 of 24

SCHEDULE OF BID PRICES ROEBUCK CONSTRUCTION

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,573,556

2 Repair Elevator #1 1 LS $ 225,000

3 Repair Elevator #2 1 LS $ 100,000

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 75,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $1,998,556

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 8,864

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 33,590

Page 12: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 12 of 24

SUBCONTRACTOR LIST ROEBUCK CONSTRUCTION

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

05 ECO BAY YES HAZMAT ABATEMENT 69,730 PIONEER CONTRACTORS NO ROOFING, SHEET METAL & DEMO 596,590 SMITH COMPANY NO COILING DOORS 10,046 WOODBROOK YES PAINTING, GLAZING, LEAD

ABATEMENT 276,314

ASCENT ELEVATOR NO ELEVATORS 288,000 AYOOB PAINTING NO PLUMBING 20,000

TOTAL 05

$1,260,680

Page 13: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 13 of 24

SCHEDULE OF BID PRICES

WESTERN ROOFING SERVICE

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,457,317

2 Repair Elevator #1 1 LS $ 145,949

3 Repair Elevator #2 1 LS $ 221,138

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 18,244

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $1,867,648

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 85,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 62,000

Page 14: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 14 of 24

SUBCONTRACTOR LIST WESTERN ROOFING SERVICE

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

06 HAWAII PACIFIC INTERNATIONAL YES SUPPLIER 130,000 EXCELLO COATING INC YES PAINTING, GLAZING 373,000 SCHINDLER NO ELEVATORS 367,087 ECO BAY SERVICES YES ABATEMENT 190,000

TOTAL 06

$1,060,087

Page 15: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 15 of 24

SCHEDULE OF BID PRICES TRICO CONSTRUCTION

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,949,597

2 Repair Elevator #1 1 LS $ 243,000

3 Repair Elevator #2 1 LS $ 133,000

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 100,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,450,597

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 38,948

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 31,685

Page 16: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 16 of 24

SUBCONTRACTOR LIST TRICO CONSTRUCTION

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

07 ECO BAY SERVICES YES HAZARDOUS ABATEMENT 189,460 DRYCO NO PAVING & SAW CUTTING 26,600 EXCELLO COATING YES WINDOW RESTORATION & GLAZING 233,642 PIONEER CONTRACTING YES ROOFING & FLASHING 596,590 DLI MECHANICAL YES PLUMBING & MATERIAL 50,000 ASCENT NO ELEVATORS 288,000 BASS NO ELECTRICAL 96,000 VALVE FIRE PROTECTION YES FIRE SPRINKLERS 3,000 MC METAL YES MISC IRON 18,900 ALPHA PRO NO PAINTING 107,000

TOTAL 07

$1,609,192

Page 17: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 17 of 24

SCHEDULE OF BID PRICES BEST CONTRACTING

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,908,660

2 Repair Elevator #1 1 LS $ 282,466

3 Repair Elevator #2 1 LS $ 120,494

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 117,980

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,454,600

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 35,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 15,000

Page 18: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 18 of 24

SUBCONTRACTOR LIST BEST CONTRACTING

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

08 HAWAII PACIFIC YES MATERIAL SUPPLIER 132,200 CAL PACIFIC INC. YES PLUMBING 78,000 ALLIANCE CONTRACTING NO ASBESTOS/DEMO 230,000 STAR ELEVATOR NO ELEVATOR 402,960 RHODES PAINTING & DECORATING YES PAINTING 98,750 TOM’S METAL SPECIALIST YES METAL FABRICATION 38,800

TOTAL 08

$980,710

Page 19: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 19 of 24

SCHEDULE OF BID PRICES FIDELITY ROOF COMPANY

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,584,468

2 Repair Elevator #1 1 LS $ 282,466

3 Repair Elevator #2 1 LS $ 120,494

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 104,602

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,117,030

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 20,845

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 21,966

Page 20: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 20 of 24

SUBCONTRACTOR LIST BEST CONTRACTING

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

09 EXCELLO COATING YES GLAZING AND PAINTING 407,235 HAWAII PACIFIC YES SUPPLIER, ROOFING MATERIALS 111,000 FINE POINT SHEET METAL YES SUPPLIER – SHEET METAL

SUPPLIES 30,000

BASS BAY AREA SECURITY SERVICE

YES SITE SECURITY 37,198

ECO BAY SERVICES YES HAZMAT 165,310 STAR ELEVATOR NO ELEVATOR WORK 402,960 CAL PACIFIC PLUMBING SYSTEMS YES PLUMBING 78,000 CAMAJANI TRUCKING YES TRUCKING/HAULING 5,433 CITY SOURCE RENTALS YES TOILET RENTAL, KNUCKLE BOOM

RENTAL 5,049

TOTAL 09

$1,242,185

Page 21: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 21 of 24

SCHEDULE OF BID PRICES ANVIL BUILDERS

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,774,995

2 Repair Elevator #1 1 LS $ 325,000

3 Repair Elevator #2 1 LS $ 135,000

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 100,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,359,995

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 39,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 25,000

Page 22: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 22 of 24

SUBCONTRACTOR LIST ANVIL BUILDERS

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

10 EXCELLO COATING YES (P) 372,000 MC METALS YES (P) METALS 12,000 PIONEER CONTRACTORS YES ( ) 596,000 STAR ELEVATOR INC NO ( ) 405,000 ECO BAY SERVICES YES 220,000

TOTAL 10

$1,605,000

Page 23: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 23 of 24

SCHEDULE OF BID PRICES CLW BUILDERS

Bid Item No.

Bid Item Description Estimated Quantity

Unit* Extension

1 Furnish and install all Work as shown on the Architectural/ Structural drawings & related specifications, excluding the elevator Work noted in Bid Items 2 & 3 below.

1 LS $ 1,693,700

2 Repair Elevator #1 1 LS $ 152,000

3 Repair Elevator #2 1 LS $ 234,300

4 Mobilization Allowance (Maximum 5% of the sum of Bid Items 1 through 3) 1 AL $ 55,000

5 Partnering Allowance, Level 1 (Refer to Document 00823) 1 AL $ 25,000

TOTAL BASE BID PRICE (Summation of Bid Items 1 through 5 above): $2,160,000

*Note: LS = Lump Sum; EA= Each; LF = Linear Feet; SF = Square Feet; CY = Cubic Yards; AL = Allowance

Alternate No.

Additive Alternate Description Amount

1 ADD Lump Sum: Installation of roll-up door & door hardware, shown in Drawing A-803.

$ 18,000

2 ADD Lump Sum: Removal & installation of asphalt, shown in Drawing A-803.

$ 64,000

Page 24: Pier 80 Security Fence - mission.sfgov.orgmission.sfgov.org/OCA_BID_ATTACHMENTS/FA35551.pdf · page 1 of 24 b i d t a b u l a t i o n . bid opening date 07/01/14 in pier 1, san francisco

Page 24 of 24

SUBCONTRACTOR LIST CLW BUILDERS

BIDDER ID

NO. NAME AND LOCATION CERTIFIED

LBE DESCRIPTION OF PORTION OF WORK SUBCONTRACTED

AMOUNT

11 RELIANCE CONSTRUCTION NO ABATEMENT PIONEER CONTRACTORS YES ROOFING/SHEET METAL/DEMO 596,590 GOLDEN STATE PLUMBING NO PLUMBING, SPRINKLER SCHINDLER ELEVATOR NO ELEVATOR / FIRE ALARM /

ELECTRIC

EXCELLO COATING YES GLAZING/ WOOD WINDOW RESTORATION/ PAINTING

372,058

TOTAL 11

$372,058