PI Portfolio Project UpdateAcademic Senate

Committee on Research

June 18, 2012

Agenda

Introduction

System Overview

Project Status

Planned Enhancements

Timeline

Roll-out Approach

Training Approach

2

PI Portfolio System Overview What will the PI Portfolio system provide?

It provides a snapshot at a summary level of the PI’s Portfolio It provides BSR reports, detail transaction reports, and a forecasting

tool

What is the value? Increases automation and accuracy of data, provides projections

capability, and standardizes reports Eliminates or reduces the need for departmental systems/tools for

generating BSRs Provides timely and readily accessible reports for PIs, Analysts,

Department Managers, Chairs, etc.

3

Diagram of the PI Portfolio system

Reports

Library

(Cognos)

Cognos

Portal Data

Warehouse

Projections

Worksheets

(TM1)

PI

Analyst

Run Reports

Run Reports

Create PROJECTIONS

Actuals

Actuals

PROJECTIONS

PROJECTIONS

So

urc

e S

yste

ms

The application delivers reports and projections capability

MyA

ccessInquiry

Run Reports

Portfolio Summary

5Example Data Only

BSR Summary

6

BSR Detail

7

Payroll Detail

8

9

10

The Pilot phase, begun in January, continues with additional departments and users invited to participate The goal of the pilot is to assess functionality, confirm validity of data, and

provide valuable feedback and suggestions for improvement Involved departments include Radiology, FCM, CAPS, CTSI, HDF

Comprehensive Cancer Center, and others; Approximately 38 users in 15 departments are involved in the Pilot

Improvements to the system are ongoing To date, over 25 bug fixes and 20 enhancements have been implemented

based on Pilot input A redesign is underway to improve functionality and usability,

with the ultimate goal of increasing user adoption

PI Portfolio Status

11

Simplify the portal page

Improve report readability and presentation

Combine and simplify projections functionality

Provide ability to customize a PI’s portfolio report (for example, to include Non-Sponsored Projects)

Include transactions to support clinical trials and STIP income

Include budget and actuals transactions on a nightly basis

PI Portfolio Planned Enhancements

PI Portfolio Current Landing Page Layout

12

Summary reports

Detail reports

Analyst-only hyperlinks to create projections

Example: Improving the User Experience

PI Portfolio by PI

PI Portfolio select view

Payroll Distribution by PI

Detail Report with budget, expenses, and

projections

Detail Report with expenses and projections by

month

Detail Report with transactions by NCA Group

and date

Detail Report with payroll transactions

Detail Report with GL Liens

Detail Report with Sub-award transactions 

Welcome to PI Portfolio

·˧ PI Portfolio will be unavailable 5/12-5/13 for

system maintenance.

·˧ CTSI joined the Pilot in April.

·˧ The PI Summary report has been enhanced to display the fund title.

Possible New Layout

13

Reports Projections Support

Example: Improving the User Experience

PI Portfolio Roll-out Activities2012

Pilot (continuing)

System Finalization

Communications

Outreach

Go-Live

Training and Support

NovemberOctoberSeptemberMay June July August

High-Level Timeline for System Roll-Out

14

Roll-out Approach We recognize that the campus is undergoing an enormous

amount of change

We will leverage the consolidated OE Finance change management plan Department Champions will be a key point of contact

We will encourage adoption at all levels of the campus

Go-Live System made available late summer (big splash) with a “ripple” roll-out

over several months Roll-out sequencing will be tied to department readiness, access to

Faculty meetings, scheduling, etc.

15

Training approach Training will be flexible, available, and repeatable Online training

Will address system use, running reports, and creating projections Will include job aids, quick reference guides, brief demo videos

Hands-on training Will be regularly scheduled Requires sign-up to attend (as opposed to “drop in”) Requires having completed the online training

Links to training will be posted on the PI Portfolio Portal page and on the Controller’s Office website

Training will be required before analysts can gain access to the forecasting tool

16

Wrap-up

Finance3 Project Updates:http://controller.ucsf.edu/finance3/

Additional Questions/Feedback?

[email protected]

17