![Page 1: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/1.jpg)
Physical Grid Vulnerabilities
Dr. John G. Kassakian The Massachusetts Institute of Technology
NRC Workshop on the Resiliency of the Electric Power Delivery System in Response to Terrorism
and National Disasters
February 27, 2013
![Page 2: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/2.jpg)
Geographic Reach
• Localized attacks similar to common contingencies. – Unplanned line/generator outage
– N-1, N-2 reserve protocols
– Restoration procedures well documented
• Wide-area assaults more difficult to anticipate/remediate – Katrina
– 1965/2003 blackouts
2 NRC Workshop on Grid Resiliency February 28, 2013
![Page 3: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/3.jpg)
Restoration/Repair Challenges
• Limited scope
– Restoration rapid.
– Time available for repair.
– Exception may be under-street metropolitan cables.
• Wide-area affected
– 1965/2003 need was restoration, not repair.
– Katrina required repair.
• Restoration on order of weeks/months
• Repair on order of years
3 NRC Workshop on Grid Resiliency February 28, 2013
![Page 4: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/4.jpg)
The Transformer Problem
• Large transformers no longer manufactured in U.S.
• Lead times on order of years.
• Spares and suitability are limited.
• Transport requires unique equipment, detailed routing, and is slow.
4 NRC Workshop on Grid Resiliency February 28, 2013
![Page 5: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/5.jpg)
Unit Transformer on a Schnabel Car
Source: Consumers Power
5 NRC Workshop on Grid Resiliency February 28, 2013
![Page 6: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/6.jpg)
Another Schnabel Car Example
Source: Raimond Spekking
6 NRC Workshop on Grid Resiliency February 28, 2013
![Page 7: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/7.jpg)
Stator Being Loaded on Schnabel Car
Source: Carl Youman
7 NRC Workshop on Grid Resiliency February 28, 2013
![Page 8: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/8.jpg)
Operational Intrusion
• System collapse – Scope can be limited.
• New technology (e.g., synchrophasor network).
• New system topology (e.g., islands with dc interties).
• Physical damage – Due to misoperation of relays/generators/SCADA
systems.
• Prevention responsive to cybersecurity measures.
8 NRC Workshop on Grid Resiliency February 28, 2013
![Page 9: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/9.jpg)
Physical Intrusion
• NERC audits.
• Can be uncoordinated and limited.
– Most likely in dispersed parts of system
• Lines, substations.
– Treated as single contingency.
– Propagation circumscribed.
9 NRC Workshop on Grid Resiliency February 28, 2013
![Page 10: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/10.jpg)
Physical Intrusion (cont’d)
• Can be coordinated and widespread
– Communication and action protocols critical.
– Rapid identification of event.
– Creates human and equipment resource problem.
– Extensive and prolonged social disruption.
– Most debilitating if transformers involved.
– Greatest vulnerability is multiple substations.
10 NRC Workshop on Grid Resiliency February 28, 2013
![Page 11: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/11.jpg)
50 kV/10 kV Substation (Innsbruck)
Source: www.e-architect.co.uk
11 NRC Workshop on Grid Resiliency February 28, 2013
![Page 12: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/12.jpg)
Substation/Switchyard
Source: www.rtcmagazine.com
12 NRC Workshop on Grid Resiliency February 28, 2013
![Page 13: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/13.jpg)
Switchyard
Source: www.firstelectricnewspaper.com
13 NRC Workshop on Grid Resiliency February 28, 2013
![Page 14: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/14.jpg)
Terrorism by Electromagnetic Pulse • EMP has potential for massive disruption.
– Electronics vector of high vulnerability. • Loss of sensing, data exchange, control, SCADA.
• Loss of infrastructure, e.g., transport, fuel.
– Large quasi-dc fields can cause extensive heavy equipment damage.
• Potential demonstrated by geomagnetic storms. – Solar flares.
– Causal but limited damage.
14 NRC Workshop on Grid Resiliency February 28, 2013
![Page 15: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/15.jpg)
Sequence of 1989 HQ GMD Event
• 02:44:17 Tripping of static VAR compensator CLC 12 at Chibougamau.
• 02:44:19 Tripping of static VAR compensator CLC 11 at Chibougamau.
• 02:44:33 to 02:44:46 Shutdown of the four SVCs at the Albanel and Nemiscau substations.
• 02:45:16 Tripping of static VAR compensator CLC 2 at La Verendrye.
• 02:45:24.682 Tripping of line 7025 at the Jacques Cartier substation.
• 02:45:24.936 Tripping of line 7044 at the La Verendrye substation.
• 02:45:24.948 Tripping of line 7016 at the La Verendrye substation.
• 02:45:24.951 Tripping of line 7026 at Chamouchouane substation.
• 02:45:24.978 Tripping of line 7045 at the Grand-Brule and La Verendrye substations.
• 02:46:00 HQ system down.
15 NRC Workshop on Grid Resiliency February 28, 2013
![Page 16: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/16.jpg)
The 2008 Florida Blackout
16 NRC Workshop on Grid Resiliency February 28, 2013
![Page 17: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/17.jpg)
Mitigation Approaches
• Reserve capacity
• Spares
• Hardening of electronics
• Perimeter security
• Islanding thru dc interconnects
17 NRC Workshop on Grid Resiliency February 28, 2013
![Page 18: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/18.jpg)
Conclusions
• Geographically limited intrusion: – manageable.
• Wide-area operational intrusion: – responsive to cybersecurity measures.
• Wide-area physical intrusion: – Approach is response vs. prevention.
– Standard communication network and protocols essential.
– Situational awareness and response through synchrophasor network could mitigate damage.
February 28, 2013 NRC Workshop on Grid Resiliency 18
![Page 19: Physical Grid Vulnerabilites...Physical Grid Vulnerabilities Dr. John G. Kassakian The Massachusetts Institute of Technology NRC Workshop on the Resiliency of the Electric Power Delivery](https://reader035.vdocuments.mx/reader035/viewer/2022070214/61133a5e49a96d781e19b6fe/html5/thumbnails/19.jpg)
Loaded Stator
Source: Carl Youman 19 NRC Workshop on Grid Resiliency February 28, 2013