phulpur parliamentary constituency

8
NORTH CENTRAL RAILWAY PHULPUR PARLIAMENTARY CONSTITUENCY Shri Narendra Modi Hon'ble Prime Minister

Upload: others

Post on 24-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

NORTH CENTRAL RAILWAY

PHULPUR PARLIAMENTARY CONSTITUENCY

Shri Narendra ModiHon'ble Prime Minister

Uttar Pradesh, the most populous state of the nation, is

served by North Central Railway along with Northern, North

Eastern and East Central Railways. Indian Railways (IR) plays a

very important role in development of the state and provide

connectivity for freight and passengers, including international

tourists. IR has a history of more than 160 years in the state and

has the highest route kilometers - 9100 route kilometers-with in it,

which is 14% of entire Indian Railways network.

IR has made Uttar Pradesh proud by giving it Nation's first

semi high speed train Gatimaan Express, which initially ran

between Agra and Delhi. It has now been extended upto Jhansi - a

move that will boost tourism in Bundelkhand region of Uttar

Pradesh. After Gatiman, the nation's first engineless semi high

speed train set "Vande Bharat Express" which is running from

New Delhi to Varanasi is also serving the state of Uttar Pradesh.

Efforts for further development of railway infrastructure in

Uttar Pradesh have been intensified in last seven years with

461% more investment in comparison to previous years. Results

of such a massive investment are becoming visible with

enhanced infrastructure and modern passenger amenities. Soon

the era of congestion and inconvenience will be matter of past and

a new Railway equipped with state-of-the art facilities will be able

to serve the citizens in a better manner and provide them

enhanced value for their money. The longest stretch of the under

construction Eastern Dedicated Freight Corridor i.e. almost 57%

of the entire length lies in Uttar Pradesh from Pt. Deen Dayal

Upadhyaya Jn. to Ghaziabad.

In this brochure, we have compiled the important

contributions and achievements of Indian Railways in the

development of the constituency of Uttar Pradesh in

last seven years.

I hope that it will serve as a ready reckoner for those eager to

know about the role of Railways in the development of this

constituency.

It may be noted that the budgets allocated to various projects

are not apportioned constituency wise but reflect the cost of the

project.

PHULPUR

Vinay Kumar TripathiGeneral Manager

North Central Railway

INPUTS BY RAILWAY IN PHULPUR PARLIAMENTARY CONSTITUENCY

PHULPUR PARLIAMENTARY CONSTITUENCYA. ASSEMBLY SEGMENTS :

Phaphamau, North, Prayagraj West, Soraon, Phulpur.

B. WORK COMPLETED IN LAST SEVEN YEARS :

1. INFRASTRUCTURAL DEVELOPMENTS:

At Prayagraj Station

Prayagraj

Prayagraj

Provision of diesel loco service centre near old electric loco shed at a cost of Rs. 2.4 Cr.

Rebuilding of bridge no. 38 at Prayagraj.

Providing Centralized godown facilities for divisional store department at a cost of Rs. 1Cr.

Construction of 4 passengers shelters, skywalk and improvement in circulating area at a cost of Rs. 113 Cr.

Construction of new platform no. 6 at a cost of Rs. 17.24 Cr.

Widening of FOB no. 2 at a cost of Rs. 10.21 Cr.

At Prayag Station

Prayag Ghat-Up-gradation as coaching terminal.

Prayagraj- Phaphamau - 2- lane road over bridge in lieu of LC No.74-A near Prayag station at a cost of Rs. 42.9 Cr.

RRI building on Platform 1 at Prayag station at a cost of Rs. 1 Cr.

RCC tank 225 KL with one deep tubewell at Prayag station at a cost of Rs. 0.6 Cr.

At Phaphamau Station

RRI building on Platform 1 at Phaphamau at a cost of Rs. 1.5 Cr.

RCC tank 225 KL with one deep tube well at Phaphamau at a cost of Rs. 0.6 Cr.

Cover shed using polycorbonate sheet at the entrance of station building at Phaphamau station.

Cover shed at entrance, PRS window, improvement on platform & circulating area at a cost of Rs. 0.22 Cr.

Extension of platform no. 1,2 & 3.

Construction of new platform no. 4.

Construction of new loop line.

Construction of new Foot Over Bridge.

Doubling of Phaphmau & Prayagraj section.

2. IMPROVEMENT IN PASSENGER AMENITIES:

At Prayagraj Station

Integrated security system at a cost of Rs. 2.54 Cr.

163 CCTV Camera & Control Room at a cost of Rs. 3.75 Cr.

5 Escalators and 2 passenger lifts at a cost of Rs. 3.36 Cr.

Airport type LED Lights and LED sinages at a cost of Rs. 0.9 Cr.

Prayagraj

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Doubling between -Prayag.

One Megawatt Power Solar Plant at a cost of Rs. 5.5 Cr.

Construction of new washing line at a cost of Rs. 4 Cr.

Doubling of Pani ki Tanki Flyover at a cost of Rs 7 Cr.

14 additional high mast Tower Lights at a cost of Rs. 1 Cr.

Mechanised laundry at a cost of Rs. 2.5 Cr.

Water recycling plant at a cost of Rs. 1 Cr.

Road under bridge at Sohbatiyabagh, Daraganj at at a cost of Rs. 9.33 Cr.

Construction of 4 passengers shelters, skywalk and improvement in circulating area at a cost of Rs. 113 Cr.

Construction of new platform no. 6 at a cost of Rs. 17.24 Cr.

Widening of FOB no. 2 at a cost of Rs. 10.21 Cr.

Construction of new FOB no. 4 at a cost of Rs. 8.00 Cr.

INPUTS BY RAILWAY IN PHULPUR PARLIAMENTARY CONSTITUENCY

PHULPUR PARLIAMENTARY CONSTITUENCY

10 multi line train display board at a cost of Rs. 2.00 Cr.

Coach indication boards at a cost of Rs. 1.32 Cr.

Mechanised cleaning of station at a cost of Rs. 12.00 Cr.

Replacement of AC sheet with Aluminum corrugated sheet on platforms no. 4 and 6, 7 and 8.

Provisions of 67 Wi Fi locations at a cost of Rs. 0.7 Cr.

Divyang toilets at all platform and re surfacing of platforms surface at a cost of Rs. 1.5 Cr.

07 water vending machines at a cost of Rs. 0.49 Cr.

13 LED type station name board at a cost of Rs. 0.26 Cr.

At Subedarganj Station

Construction of New station building and platform at a cost of Rs. 45.5 Cr.

Various works related to Kumbh 2019 at a cost of Rs. 5.69 Cr.

Raising of Platform to high level and platform extension at a cost of Rs. 3.38 Cr.

Construction of New FOB and extension at a cost of 8.00 Cr.

Toilets at a cost of Rs. 0.11 Cr.

Upgradation of station.

Extension of Platform No.1 at a cost of Rs. 0.90 Cr.

At Bamhrauli Station

Extension and raising of existing platforms upto medium Rail level to accommodate 24 coaches at Sangam Express

stoppage station at Bamhrauli Station at a cost of Rs. 1.4 Cr.

UTS Cum PRS facility.

Extension of UP 100P of station at a cost of Rs. 0.98 Cr.

At Prayag Station

Improvement in station building at Prayag at a cost of Rs. 10.00 Cr.

LED lights, high mast tower lights at a cost of Rs. 1.00 Cr.

Washable apron at platform no. 2 at Prayag station at a cost of Rs. 1.31 Cr.

Provision of additional FOB at a cost of Rs. 2.31 Cr.

Dismantling of second class waiting hall and surfacing of existing circulating area by bitumen concrete at Prayag

station.

Improvement in circulating area at Prayag at a cost of Rs. 2.3 Cr.

Entry-exit road 15 meter wide along with 1.5 meter wide footpath in Prayag station circulating area 140 meter

completed.

Improvement to concourse, entrance and provision of portico in connection with Adarsh station at Prayag.

Pay and use toilets at platform no.1 at Prayag station.

06 RCC bench at Platform No. 1 and 10 RCC benches at Platform 2 at Prayag station.

Public urinal in circulating area at Prayag station.

One Water vending machine.

At Phaphamau & Phulpur Stations:

02 lane ROB in lieu of level crossing no. 28 C in Phulpur Yard at a cost of Rs. 30.9 Cr.

01 UTS cum PRS & 1 UTS window at Phaphmau and Phulpur station.

01 ATVM Machine at Phaphamau station.

Reservation PRS window at Phaphamau.

Improvement in circulating area in Phulpur.

Installataion of water vending machine at Phulpur.

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

INPUTS BY RAILWAY IN PHULPUR PARLIAMENTARY CONSTITUENCY

PHULPUR PARLIAMENTARY CONSTITUENCY

Re-plastering, flooring etc of Platform 1, urinal in circulating area at Phaphamau.

Installation of 1 Water Vending Machine on platform at Phulpur.

Construction of Divyang Toilet in Phulpur.

Construction of Pathway for Divyang persons connecting platform no. 1 & 2 in Phulpur.

Provision of platform shelter at Phulpur station.

Provision of FOB at Phaphamau railway station.

At Other stations

100% LED lights at Daraganj at a cost of Rs. 7 Lakh.

Provision of low cost Passnger Platform Shelter at Daraganj & Jhusi at a cost of Rs. 4 Lakh.

Provision of low cost shelters, RCC benches,SS benches & dustbins at Prayagraj Rambagh station at a cost of Rs.

66 Lakh.

Arrangement for protection of ladies passenger at Prayagraj Rambagh at a cost of Rs. 2.60 Lakh.

FOB at Jhusi at a cost of Rs. 90 Lakh.

2 Ticket Window at Prayagraj Rambagh at a cost of Rs. 0.50 Lakh.

Train Display Boards at Prayagraj Rambagh at a cost of Rs. 2.50 Lakh.

Prayagraj Rambagh-Prayagraj Jn - 2-lane road over bridge in lieu of Level Crossing No.T-1/B at a cost of Rs.

3208 Lakh.

Prayagraj

Prayagraj

Pt. Deen Dayal Upadhyaya Jn. Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Train No. 22435/22436 Vande Bharat Express -05 days a weeky from Varanasi Jn. to Delhi.

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

Prayagraj

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

C. OTHER DEVELOPMENTS

New Trains introduced originating from Phulpur Constituency:

Train No. 14118/14117 Manwar Sangam Express -05 day a Weekly -from Basti to Jn.

Train No. 64591/64592 MEMU Passenger Service-Daily-from Jn. to Kanpur Central.

Train No. 63237/63238 MEMU Passenger Service-Daily-from to Jn.

Train No. 14155/14156 -Udhampur Express - Bi-weekly

Train No. 22967/22968 Ahmedabad- Express-weekly via Manikpur.

Train No. 22437/22438 Humsafar Express -3 Days a Week - From Jn. to Anand Vihar (T) via Kanpur

Central.

Train No. 75105/75106 Rambagh - Mau Demu

New Trains introduced with stoppage over Phulpur Constituency:

Train No. 19042/19041 Ghazipur City to Bandra (T) express via Jn.

Train No. 16793/16794 Shraddha Sethu Express-Weekly-from Rameswaram to Faizabad via Jn.

Train No. 14019/14020 Tripura Sundari Express-Weekly-from Anand Vihar (T) to Agartala via Jn.

Train No. 22683/22684 Yesvantpur-Lucknow Express-Weekly via Jn.

Train No. 19421/19422 Ahmedabad - Patna Express - Weekly via Jn.

Train No. 15117/15118 Manduadih-Jabalpur Express-Weekly via .

Train No. 11053/11054 Lokmanya Tilak (T)-Azamgarh Express-Weekly via .

Train No. 22857/22858 Santragachi-Anand Vihar (T) Express-Bi-Weekly via .

Train No. 12581 - Manduadih - New Delhi Express - Daily via .

Train No. 19063/19064 Udhna - Danapur Express - Bi-Weekly via .

Train No. 22427/22428 Bhrigu Express -Weekly - From Ballia to Anand Vihar (T) via Jn.

l

INPUTS BY RAILWAY IN PHULPUR PARLIAMENTARY CONSTITUENCY

PHULPUR PARLIAMENTARY CONSTITUENCY

Train No. 22433/22434 Anand Vihar (T) - Ghazipur City Bi-weekly Express

Train No. 15559/15560 Darbhanga-Ahmedabad Weekly Jansadharan Express

Train No. 11081/11082 Lokmanya Tilak (T) - Gorakhpur Weekly Express

Train No. 22438/22439 Jn.-Anand Vihar (T) Humsafar Express

-Bamhrauli - 4th line 10 km with flyover at Subedarganj at a cost of Rs. 493.11Cr.

Upgradation of Subedarganj station at a cost of Rs. 45.00 Cr.

Provision of washing pit lines of 26-coachlength each 2 nos. with one stabling line of equal length at Subedarganj at

a cost of Rs. 35.00 Cr.

Extension of sick line shed at

Development of intermediate overhauling shed cum sick line Phase-2 at

New works for splitting of two blocks sections, provision of logistic park, chord line, satellite station, sand humps,

simultaneous movement and conversion to B-class station at Subedarganj.

Replacement of washable apron on platform no. 3 & 4 at .

Extension of existing shed by size 30x15 mtrs. with 10 ton EOT Crane at CPOH Workshop at Prayagraj.

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Prayagraj

D. ONGOING WORKS

Phaphamau- Prayagraj 12.9 km doubling along with bypass line between Northern Railway and North Eastern

Railway track.

Upgradataion of Prayag Ghat as coaching terminal Phase-II at a cost of Rs. 168 Cr.

Phaphamau-Unnao doubling (200 Km.) at a cost of Rs. 1600 Cr.

Phaphamau-Jhanghai doubling with electrification (46.79 Km.) at a cost of 357 Cr.

Prayagraj-Phaphamau 2 lane ROB in lieu of 78 A at a cost of Rs. 43.5 Cr.

Prayagraj-Faizabad ROB in lieu of LC No. 61 B at a cost of Rs. 37.38 Cr.

Lifting Barriers at 07 manned level crossings 04 in ARC 03 in Ajgain section.

Additional loop lines at Tharwai, Bariya, Rampur, Pariawan Kalankankar, Kunda Harnamganj, Atrampur stations.

Electrification of 44 manned level crossings.

Integrated Emergency Response Management System Video Surveillance System at 08 railway stations viz.

Phulpur, Janghai, Prayag & 5 other stations.

Coach Guidance System, Digital Clock and Computerized Announcement System at Phulpur station.

Display system at platforms and waiting rooms for Train enquiry at different stations.

Augmentation of public address equipment system with computerized announcement system at various stations at

Kunda-Harnamganj & Lalgopolgani.

Phulpur Yard - 2- lane road over bridge in lieu of Level Crossing No. 20-C.

Doubling of Phaphamau - Unchahar - Raebareli section of 110 Km along with electrification.

Air Conditioners in running rooms of Phulpur and Prayag.

Solar power pack system with battery bank at B class station, D class station and E Class stations at a cost of Rs.

50.65 Lakh.

Prayagraj

Prayagraj.

Prayagraj.

Prayagraj

INPUTS BY RAILWAY IN PHULPUR PARLIAMENTARY CONSTITUENCY

PHULPUR PARLIAMENTARY CONSTITUENCY

Replacement of damaged cat walk and all structure elements of washing line No. 20, 21 at .

Provision of facilities at Bamhrauli station as per Adarsh station norm.

30 Lifts at A1, A other pilgrim stations with high passenger density.

Provision of insertion of cross-over between RD-I and Point No. 371 376 at Yard.

Stabling line in connection with 3rd line between Subedarganj Station.

l

l

l

l

l

l

l

l

l

l

Prayagraj

Prayagraj

Prayagraj-

Improvement, extension and raising of platform at Jhusi (PlatformNo1) stations at a cost of Rs. 200.10 Lakhs.

Raising and extension of platfrom at Bhiti, Saidabad, Ramnathpur (PlatformNo1) station in Varanasi Division

stations at a cost of Rs. 580.15 Lakhs.

One stabling line and one shunting line in connection with satellite station at Prayagraj Rambagh at a cost of Rs.

648.54 Lakh.

Improvement, extension and raising of platform at Prayagraj Rambhag Platform No- 2 & 3 & Jhusi Platform No1 at a

cost of Rs. 200.00 Lakh.

Coach maintenance facilities at a cost of Rs. 584.22 Lakh.

Inauguration of Humsafar Express

Inauguration of New LHB coaches of Prayagraj Exp.

Widening of Line Sah Baba FOB to 12 Mts.

Multi Functional Complex at Prayagraj

Inauguration of Prayagraj-Udhampur Exp.

New Escalator at Prayagraj.