4
0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 Total hotels Licensed hotels Pending approval License approved Not applied Licensed vs. Unlicensed Hotels Hotels Phuket Hotel Market Update Mid-Year Edition July 2017 Trends Forward Outlook Future Government funding for infrastructure investment for Phuket Province now totals USD2 billion. Overseas passenger arrivals increased by 9% y-o-y, with additional 143 scheduled Tlights added between March – October 2017. InTlux of branded and brand-afTiliated properties stands at 77% of total pipeline keys with 36% having branded hotel residences. Completion of upgrade of Phuket Airport domestic terminal is scheduled for December 2017 just in time for peak tourist season. Design of 22.4-kilometer Sakoo-Koh Keaw expressway is expected to be Tinalized by August with an EIA submission in 2018. Ministry of Natural Resources and Environment is planning to simplify the process of EIA/IEE approval for hotel licensing applications. Bill Barnett, Managing Director, C9 Hotelworks Source: Phuket’s Provincial Administration OfTice Phuket unlicensed accommodation crackdown results in 1,007 hotels applying for license Government focus on the destination includes investment in 12 lane cross island expressway and light rail project “Phuket’s Provincial government has undertaken a large-scale initiative to tackle the proliferation of unlicensed hotels. Since the campaign started, a total of 1,007 hotels have applied for ofTicial operating licenses with just six approved to date. The main challenges for the process are the strict regulations associated with the Building Control and Hotel Acts. As a result of these mandates the province is considering reviewing the requirements to support the conversion process. The government is addressing trafTic management issues by initiating the development of a 12-lane Sakoo-Koh Kaew expressway project which will accommodate a light rail component. This process is dependent on an environmental study and public opinion as it will require a signiTicant acquisition of private land. Construction is expected to take Tive years, should EIA approval be obtained in 2018. Phuket’s gateway international airport is continuing to see rising trafTic demand with total passenger arrivals experiencing y-o-y growth of 10% in the Tirst Tive months of the year. The addition of a light rail network with airport access will improve overall public transport and slow the pace of congestion. Overtime, the limitation of a single airport runway looms.” 1,724 429 1,001 6 288

Upload: doantu

Post on 12-May-2018

223 views

Category:

Documents


4 download

TRANSCRIPT

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

Totalhotels

Licensedhotels

Pendingapproval

Licenseapproved

Notapplied

Licensedvs.UnlicensedHotels

Hotels

PhuketHotelMarketUpdate

Mid-YearEditionJuly2017

Trends ForwardOutlook•  FutureGovernmentfundingforinfrastructureinvestmentforPhuketProvincenowtotalsUSD2billion.

•  Overseaspassengerarrivalsincreasedby9%y-o-y,withadditional143scheduledTlightsaddedbetweenMarch–October2017.

•  InTluxofbrandedandbrand-afTiliatedpropertiesstandsat77%oftotalpipelinekeyswith36%havingbrandedhotelresidences.

•  CompletionofupgradeofPhuketAirportdomesticterminalisscheduledforDecember2017justintimeforpeaktouristseason.

•  Designof22.4-kilometerSakoo-KohKeawexpresswayisexpectedtobeTinalizedbyAugustwithanEIAsubmissionin2018.

•  MinistryofNaturalResourcesandEnvironmentisplanningtosimplifytheprocessofEIA/IEEapprovalforhotellicensingapplications.

BillBarnett,ManagingDirector,C9Hotelworks

Source:Phuket’sProvincialAdministrationOfTice

Phuketunlicensedaccommodationcrackdownresultsin1,007hotelsapplyingforlicenseGovernmentfocusonthedestinationincludesinvestmentin12lanecrossislandexpresswayandlightrailproject

“Phuket’sProvincialgovernmenthasundertakenalarge-scaleinitiativetotackletheproliferationofunlicensedhotels.Sincethecampaignstarted,atotalof1,007hotelshaveappliedforofTicialoperatinglicenseswithjustsixapprovedtodate.ThemainchallengesfortheprocessarethestrictregulationsassociatedwiththeBuildingControlandHotelActs.Asaresultofthesemandatestheprovinceisconsideringreviewingtherequirementstosupporttheconversionprocess.ThegovernmentisaddressingtrafTicmanagementissuesbyinitiatingthedevelopmentofa12-laneSakoo-KohKaewexpresswayprojectwhichwillaccommodatealightrailcomponent.ThisprocessisdependentonanenvironmentalstudyandpublicopinionasitwillrequireasigniTicantacquisitionofprivateland.ConstructionisexpectedtotakeTiveyears,shouldEIAapprovalbeobtainedin2018.

Phuket’sgatewayinternationalairportiscontinuingtoseerisingtrafTicdemandwithtotalpassengerarrivalsexperiencingy-o-ygrowthof10%intheTirstTivemonthsoftheyear.Theadditionofalightrailnetworkwithairportaccesswillimproveoverallpublictransportandslowthepaceofcongestion.Overtime,thelimitationofasingleairportrunwaylooms.”

1,724

429

1,001

6

288

TOURISMAirlineIndicators•  PhuketInternationalAirporthostedatotalof3,568,811inboundpassengersbetweenJanuarytoMay2017ofwhich46%weredomesticarrivalsand54%wereinternationalarrivals.

Passengerand*lightarrivalsshowedsimilargrowthof10%and9%,respectively,during*irst5monthsof2017

C9PhuketHotelMarketUpdate:July2017

Source:PhuketInternationalAirportandC9HotelworksMarketResearch

Source:PhuketAirportImmigrationandC9HotelworksMarketResearch

Chinashowedy-o-ygrowthof8%whileRussiasharplyroseby17%

NumberofPassengers

PhuketAirportPassenger&FlightArrivals

NumberofPassengers

Top5KeyInternationalGeographicSourceMarkets

2

NumberofFlights

KeyGeographicSourceMarketShare

Top5AsianMarkets Top5EuropeanMarkets

0

200,000

400,000

600,000

800,000

MainlandChina

Russia SouthKorea Australia Germany

January-May2016 January-May2017

0

1,000

2,000

3,000

4,000

5,000

6,000

0100,000200,000300,000400,000500,000600,000700,000800,000900,000

Jan Feb Mar Apr May

Arrivals2016 Arrivals2017 Flights2016 Flights2017

66%9%

5%4%3%

13%

MainlandChina

Korea

Malaysia

Thailand

Singapore

Others

41%

11%10%9%

8%

21%

Russia

Germany

UnitedKingkom

France

Sweden

Others

HotelSupply

HotelPerformanceComparison

3C9PhuketHotelMarketUpdate:July2017

Source:C9HotelworksMarketResearch*Additionalkeysforexistinghotels

Source:STR

Year-on-yearmarket-wideADR’sgrew3.6%duringthe*irstfourmonthsof2017

HOTELOVERVIEW

InTHB %

75

80

85

90

0

2,000

4,000

6,000

8,000

Jan-Apr2015 Jan-Apr2016 Jan-Apr2017

ADR RevPAR Occupancy

•  Thereare33hotelsor5,738keysintheisland’spipeline.

HotelName Location Keys OpeningDateSheratonPhuketGrandBayResort&Residences AoPor 269 Q42019CassiaPhuket(Phase2) Bangtao *105 Q22018X2VibePhuketBangtaoResidence Bangtao 85 Q12018YoskarnKallistePhuketWellnessResort&Spa CapePanwa 40 TBAAnayaraRetreatPanwa CapePanwa 6 Dec2017AnayaraLuxxPanwa CapePanwa 38 Q12019CourtyardbyMarriottPhuket ChalongBay 277 Q42019JWMarriottPhuketResort&Spa ChalongBay 189 Q42019NokuRoxyPhuket ChalongBay 91 Q32019SheratonPhuketKalimBeachResort Kalim 230 TBABestWesternPremierHimalaiResort Kamala 402 Q32019InterContinentalPhuketResort Kamala 200 Q42019TwinpalmsResidencesMontAzure Kamala 75 Q42018The137PillarsEstatePhuket Kata 66 Q42019TheHermitageResort Kata 78 Dec2017OzoKataPhuket Kata 255 Q42018KempinskiHotelPhuket KohSiray 85 TBAParkHyattPhuket KohSiray 85 TBAMaiKhaoPalmBeachResort MaiKhao 225 Nov2017MovenpickResortMaiKhaoPhuket MaiKhao *136 Q22018AnantaraVacationClubMaiKhao MaiKhao *98 Dec2018RoyalLeeTheTerminal NaiYang 320 TBAHiltonPhuketPatongResort Patong 300 Q12020BoutiqueSai3PatongHotel Patong 198 Aug2017HotelIndigoPhuket Patong 180 Q22018AbsoluteTwinSands(Phase3) Patong *89 Mar2018FourPointsbySheratonPatongBeach Patong 560 Jan2020BeyondHotelatPatong Patong 160 Aug2017ZenseanaHotelPatong Patong 166 TBARamadaPlazaChaoFaPhuket PhuketCity 257 Q42018BestWesternTheBeachfront Rawai 192 Mar2018DusitD2PhuketAria Surin 210 Q22020RosewoodPhuket TriTrang 71 Q42017

startbuildingaccordingtothedesign

informmunicipalityonceconstructioniscomplete

inspectionbymunicipalityengineertoissuebuildingPermitA.6

submitPermitA.6andEIA/IEEreporttodistrictofTice

districtofTicepre-approvesandsendstogovernor’sofTicetoissueahotellicense

submitapprovedEIA/IEEreporttomunicipality

inspectionbymunicipalityengineertoseeifrenovationisneeded,andreceivebuildingPermitA.6

askforpermissionfromprovincialofTiceofpublicworksandcountry&townplanning,andpayaTine

submitEIA/IEE,buildingpermitandpermissiondocumenttodistrictofTice

districtofTicepre-approvesandsendstogovernor’sofTicetoissueahotellicense

HotelLicenseApplicationProcessNewHotelsvs.UnlicensedHotels

studyzoningregulations

developdesignofthehotel

EIA/IEEreportdraftedbyaccreditedprofessional

submitEIA/IEEreporttoprovincialofTiceofnaturalresourcesandenvironment

submitapprovedEIA/IEEreporttomunicipality

issuanceofbuildingPermitA.1

hotelswithoperatinglicense

429AsofJune2017

hotelsappliedforalicense

1,007In2016

payaYineaspenaltytomunicipality

rectifythehoteldesignifnecessary

withreviseddesign,getanaccreditedprofessionaltodraftanEIA/IEEreport

submitEIA/IEEreporttoprovincialofTiceofnaturalresourcesandenvironment

submitapplicationtomunicipalityforinspectionandaskthemtoissueacertiYicate

reviseEIA/IEEreportaccordinglytothecomments

NewHotels Unlicensed

Hotels

©www.C9Hotelworks.com Source:ThalangDistrictOfTice,DepartmentofPublicWorksandTown&CountryPlanning,Phuket’sProvincialAdministrationOfTiceandC9HotelworksMarketResearch

hotelsweregivenalicense

6In2017