HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
1
Mickaël is pouring the base foundation James is laying the floor
Theoretical training Before starting work
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
2
Blocks delivery Ludovic is unloading the blocks
Pallets of hemp blocks
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
3
Squaring up layout Plumbing network
Pythagorean Theorem Electrical grid
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
4
Christophe is laying the mortar with Céderick puts the plumb
A notched trowel
Linking block to wall
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
5
Incorporating plumbing Sabrina is lime plastering around the window
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
6
Mickaël is laying the wall panelling Céderick is cutting a block with
An alligator saw
puts the plumb Making Quoins Joinery laying
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
7
Laying blocks between the joists Mickaël is preparing the mortar
Frédérick is preparing the roughcast
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
8
Ludovic is applying manually the roughcast
Floor protection Roughcast projection
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
9
Filling of the spray machine Ludovic is spraying the roughcast
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
10
Mickaël and Aurore are applying the finishing coat
HEMP AND LIME TRAINING SESSION - LE PALACRET MAY-JUNE 2013
11
Frédéric is applying the finishing coat Aurore is smooting out the coat