Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Photo log
Description of the building support :
Location : Rural town Teillay (35)
A prefabricated cloakroom
Summary description : Insulating prefabricated building on the outside with natural
insulating materials : cellulose wadding and wood fibrer and cork witchert.
General condition : very few insulation for the existing building / 2 bungalows (3m*6m)
connected by a common room built in timber frame and filled with hemp blocks 15 cm.
Tasks :
- Assembly of the timber frame :
o Horizontal assembly of a bottom plate
o Measurement and assembly the timber rafters on platform
o Assembly and formwork the OSB
- Insulation work with two methods :
o Fill the wood fibre (depth 160mm) then lay the roofing membrane
o Blow cellulose wadding insulation in (50 kg/m3)
- Lay the battens to garantee air gap
- Lay the cladding horizontally
Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Lay the timber frame
Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Lay OSB plywood boards to blow cellulose wadding
Cellulose wadding blowing machine
Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Machine à insuffler la ouate de cellulose
Comments the cellulose wadding insufflation method
Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Cellulose wadding insufflation
Lay wood fibre boards
Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Lay roofing membrane after wood fibre insulation
Lay cork for witchert insulation
Cellulose wadding and wood fibre demonstration
MINES DE LA BRUTZ FEBRUARY TO JUNE 2014
Lay batten assembly and then fix the cladding (air gap)
Lay the cladding