phoneconf u-2010 february 6th, 2009 harold linke / hitec luxembourg
DESCRIPTION
Agenda Workpackage status Deliverables status Feedback Architecture Workshop Feedback Final Scenario Workshop Next Dates any other business –(NSN) Dates of the use of the Tetra LicenseTRANSCRIPT
Participants
Name Partner Participated
Aurel UL
Thomas Engel UL
Thomas Scherer UL OK
Latif Ladid UL
Raphael Frank UL
Carlo Simon CCG
Harold Linke HITEC OK
Benjamin Hourte HITEC OK
Jean Schweitzer Telindus
Kate Yeadon EPT OK
Bryan McLaughlin Cisco
Theo de Jongh Cisco
Bert Habraken Cisco
Wolfgang Bartsch IABG
Karl Mayer IABG OK
Peter Kirstein UCL
Nikolas Stephan / Socrates UCL OK / OK
Tayeb Benmeriem FT
Veluppillai Chandrakumar FT
Hubert Schumacher M-PLIFY
Alexandre Dulaunoy / Gérard SES
Martin Dunmore ULANC OK
Brian Gent / Claude Sabus NSN NOK / OK
Agenda
• Workpackage status• Deliverables status• Feedback Architecture Workshop• Feedback Final Scenario Workshop• Next Dates• any other business
– (NSN) Dates of the use of the Tetra License
Status WPs
WP1: is in stand-by
WP2: * D2.1.2 A workshop has been organised to work on the architecture concepts (see next
slides)* D2.2.2 Sent. But not on the reviewers DMS* D2.3.2 Sent. But not on the reviewers DMS
WP3: Nothing new to report.
WP4:* A workshop has been organised to work on the final demo (see next slides)* D4.1.1 Still some modifications applied: expected delivery date: End of February* UCL is working with ULANC on MANEMO with Runes sensors
WP5: No feedbacks. (UCL Contributions to a new paper SensorCom)
WP6:* D6.1.1: Has been send to the internal reviewers. Expected delivery date: end of next
week (13/02/09)* D6.1.2: For internal review for the end of February (27/02/09) Reviewers are Carlo and
Katja.
WP7: No feedbacks.
Workshops
Architecture Workshop 29.1.2009 (see Wiki)
http://wiki.u2010.eu/index.php/WP2_D212#Result_of_the_architecture_meeting_.2829.2F01.2F08.29
For all questions: send to the u2010 mailing list
Final Scenario Workshop 30.1.2009 (see Wiki)
http://wiki.u2010.eu/index.php/WP4_SP_I
Dates have been fixed for the 16th to 18th of SeptemberFor details: look at the wikiSend feedbacks to the mailing list
Next Dates
Feb 06th - u-2010 phoneconf - status of WPs, deliverables and feedback from architecture workshop and Final demonstration planning
Feb 09th - Inform Peter about results (Harold)Feb 16th 09AM - 12AM (CET) – Telco on the architectureFeb 18th - Meeting in Slovenia for defining the Slovenian
Demonstration (Harold, Ben, Kate, Martin, Katja)Feb 20th - u-2010 phoneconf - status of WPs, deliverables
and feedback from Slovenian workshopMarch 06th - Architecture Workshop,BrusselsMarch 13th - u-2010 phoneconf - status of WPs, deliverables
and feedback from architecture workshopMarch 30th, 31st - General Assembly SloveniaApril 01st, 02nd - Demonstration in Slovenia
A.O.B.
Tunnel for testing and for final demonstration:
A meeting with the responsible for Road and Bridges is planned for Feb 27th, giving a presentation and demonstration of u-2010. There is a good chance to get a tunnel for some weeks before the final demonstration. But there is a lot of good will and support necessary from the R&B to make this possible.We got the green light that a part of the tunnel will be made available from July 2009 to September 2009 for testing and demonstration. We will send an official request to the ministry to receive an official answer that we can give to Karina, to let her decide about the project extension to September. This is a complicated process and will take some time unfortunately. So we are not sure yet if we will have the final demo in June or September.
Budget:As mentioned in the last general assembly we have to go over our budget planing to ensure that we use our full remaining budget as usefull as possible for the project. I got already feedback from most of the partners so Latif, Thomas and I will go over the budget next week and provide a proposal to you for discussion. We plan to present and discuss this proposal in the phoneconf.
Dates of the use of the Tetra License (NSN):* 22th of June 2009 to 03rd of July 2009 (Grouft Tunnel (North))* 07th of September 2009 to 18th of September 2009 (Grouft Tunnel (North))