OUTLINE OF THE PPCC RAIL TRANSIT SYSTEM PROJECT FOR COMPREHENSIVE URBAN TRANSPORT PLAN IN PHNOM PENH CAPITAL CITY (PPUTMP) JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) 06 August 2015 SAM PISETH DIRECTOR OF PUBLIC WORKS AND TRANSPORT PHNOM PENH CAPITAL CITY PHNOM PENH CAPITAL HALL MINISTRY OF PUBLIC WORKS AND TRANSPORT THE KINGDOM OF CAMBODIA (MPWT) 1

Upload: others

Post on 30-Apr-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

OUTLINE OF THE PPCC RAIL TRANSIT SYSTEM

PROJECT FOR COMPREHENSIVEURBAN TRANSPORT PLAN

IN PHNOM PENH CAPITAL CITY(PPUTMP)

JAPAN INTERNATIONAL COOPERATION AGENCY 

(JICA)

06 August 2015

SAM PISETHDIRECTOR OF PUBLIC WORKS AND TRANSPORT

PHNOM PENH CAPITAL CITY

PHNOM PENH CAPITAL HALLMINISTRY OF PUBLIC WORKS AND TRANSPORTTHE KINGDOM OF CAMBODIA (MPWT)

1

1. TARGET PUBLIC TRANSPORT CORRIDORS & CORRIDOR ANALYSIS

2

East‐west and Southwest transport corridors were selected as the target Public Transport corridor of the preF/S based on the public transport development scenario and the following corridor analysis result:

• A relatively high passenger demand of around 72,500 to 81,600 trips/day in 2035.

• The route connects between urban center and rapid urbanized western fringe area.

• The route connects with several intense traffic generation nodes, i.e. Phnom Penh airport, train depot and bus terminal facilities.

• A large‐scale private development plan for the central district is underway.  

• Various land use patterns are seen along the corridor.

• It is possible to serve future transport demand by bus feeder network from south and north.

2. Route Alternatives for East‐West and Southwest Transport Corridors

4

3. Evaluation of Rout AlternativeThe optimum route forthe preliminary F/S isselected from the fouralternatives through theevaluation on the eightviewpoints. Eachevaluation item is givenpoints: 3 for good, 2 forfair and 1 for worse.However, since cost is themost important items forthe route evaluation, itspoint is multiplied by 2.Alternative 3‐1 receivedthe highest point asshown in the Table.

Alternative 1 Alternative 2 Alternative 3‐1 Alternative 3‐2

Russia Blvd. route Railway ‐ Russia route

Monivong Blvd.‐ MRD (Russia,underground)

MRD ‐ Depot (Russia, elevated)

Central Station ‐ Depot (Railwayline and Russian Blvd. Elevated)

Olympic Studiam ‐ Monireth (CDGand Monireth, Elevated)

Monireth ‐ Airport (Monireth,Veng Sreng and Russia, Elevated)

Central Market ‐ Depot (CDG,Monireth, Veng Sreng and Russia,

Elevated)

Elevated Section 11.8 14.2 12.0 16.3UndergroundSection

2.2 0.9 0.9 0.9

Total 14.0 15.1 12.9 17.2

759 645 586 733

2 4 6 2

81,600 72,500 75,000 79,000

3 1 1 2

3 1 3 3

3 3 1 1

3 1 3 3

3 1 3 1

3 3 2 1

1 3 3 3

Overall Evaluation 21 17 22 16

Accessibility to the airport

Future development along the route

Future Extension

Urban environment (urban scenery)

Issue to the VIP Traffic

Items

CDG ‐ Monireth ‐ Veng Sreng Blvd. route

Length ofelevated andundergroundsection (km)

Cost (Million USD)

2035 Passenger Demand(Passengers/Day)

Land use along the route

5

4. Route Characteristics of Alternative 3

Demand

6

5. Selection of Rail Transit System

7

5. Selection of Rail Transit System ‐ Cont’dImage of Automated Guideway Transit (AGT)

Singapore Sengkang/Punggol Line

8

Range of Application

5. Selection of Rail Transit System

9

Exceptional Route Flexibility

5. Selection of Rail Transit System

10

6. ScheduleBased on the public transport development scenario, it is recommended that the first stage of the rail transit beimplemented after the medium‐term (2020). Then, considering the construction period, it is necessary to proceed to thenext step (Feasibility Study) as soon as possible.

YearQuarter 1 2 1 2 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1. Preliminary F/S

2. Finalization & Government Process

3. F/S & Basic Design

4. Cambodia G. Approval

5. ODA Process

6. Selection of Consultant

7. Detailed Design

8. Tender Document/Tendering

9. Construction Supervision

10. Civil Construction

11. Station and Depot Building Construction

12. E&M System incl. Trains

13. O&M Tender/Contract/Works

14. Open of Commercial Operation

Note:   Next Most Important Steps  Necessary Working Period  Formalization & Documentary Works

20242016 2017 2018 2019 2020 2021 2022 20232014 2015

Detail Design, Tendering

2018 Apr. ‐ 2019 Dec.

Construction Period2020 Jan.  ‐ 2023 Mar.3 years + 3 months 

Operation2023 Apr. ‐

7. Current Conditions along Alt.3 Route

Olympic Stadium Monireth Blvd. ‐ North 

Stung Minh Chey Flyover Monireth Blvd. ‐ South

Veng Sreng Blvd.Veng Sreng Blvd. – Near Cham Chau Roundabout

Cham Chau Bus Terminal Russian Blvd. – Near Airport

7. Current Conditions along Alt.3 Route – cont’d