A collection of recent professional work as well as a graduate portfolio attached as an appendix.

TRANSCRIPT

Page 1: Phil Meyer RECENT WORKS

P H I L MEYER r e c e n t w o r k s

Page 2: Phil Meyer RECENT WORKS

DISCLAIMERFeatured projects included in RECENT WORKS were completed as a member of a collaborative design team at ZGF ARCHITECTS, LLP. Personal project specific roles are outlined herewithin.

PHOTO CREDITS: ZGF ARCHITECTS

Page 3: Phil Meyer RECENT WORKS

CONTENTS WASHINGTON, D.C.

1200 17TH STREETbase building

SPEC SUITESinteriors

THE COUNCILinteriors

QUADHAUScompetition

phil meyerp: 217.714.9982e: [email protected]

Page 4: Phil Meyer RECENT WORKS

PROJECT ROLES:CONSTRUCTION DOCUMENTSCONSTRUCTION ADMINISTRATIONLEED PROJECT COORDINATOR

1200 17TH ST office buildingCOMPLETED 2014

Page 5: Phil Meyer RECENT WORKS

Designed to meet the need for flexible of-fice environments, 1200 17th is a 170,000 SF, 11-story, LEED-Platinum certified building sandwiched between the Central Business District and historic Dupont Circle neighborhoods of Washington, DC. Encouraged by the client to create a memorable building that establishes a new benchmark for future office building development in DC, a richly glazed

terracotta and stainless steel façade, juxtaposed against a modern glass tower, visually links the two distinct neighbor-hoods and reflects the material palette and texture of each environment. The building’s architectural form was inspired by the site’s prominence and geometry, and reflects the combination of orthogo-nal streets and grand diagonal avenues that give the city its distinctive character.

Page 6: Phil Meyer RECENT WORKS
Page 7: Phil Meyer RECENT WORKS

A two-story lobby featuring wood and marble walls and ultra-clear structural glass create a dramatic street presence at the corner of 17th and M Streets NW. The building’s jewel box design features floor-to-ceiling glass and nine-foot-high finished ceilings, enhancing the over-all work environment through abundant natural daylight. A column-free floorplate provides optimal workplace flexibility for professional organizations.

Page 8: Phil Meyer RECENT WORKS

A mixture of intensive and extensive planter beds at

the roof and street level cre-ates a biophilic amenity that encourages both social and

environmental interaction. Planted with native, regional

vegetation, the green roof acts as a natural rainwater

filtration system and greatly reduces the impact on city stormwater infrastructure.

Page 9: Phil Meyer RECENT WORKS
Page 10: Phil Meyer RECENT WORKS

PROJECT ROLES:BIM PROJECT LEADDESIGN + CONSTRUCTION DOCSCONSTRUCTION ADMINISTRATION

1200 17TH spec suitesCOMPLETED 2015

Page 11: Phil Meyer RECENT WORKS

A pair of 4,000 SF speculative office suites were designed for floors 5 and 6 at 1200 17th Street in Washington, DC. Both suites included an open office plan with transparent perimeter offices and conference rooms, custom reception bench and desks, and an office pantry area. The design stresses client flexibility while maximizing the natural daylighting provided by the floor-to-ceiling windows.

Page 12: Phil Meyer RECENT WORKS
Page 13: Phil Meyer RECENT WORKS

E FCBA D

H

C3

A2

A1

A1

A1

A1

A1

A1A1

A3

A1

F1

F1

F1

F1

A2

A2

A2

A2

A2

A2

A2

A2

TYP

B1

B2

B2

R5

R4

R3

R2

R1

R6

4

3

2

1

C1C1 C1 C1 C1

D1

C2

C2

C2

G

E

E

E

TYP.C3

C3

A3

D3TYP.

A3

A3

C1

B1

A2

A2 C1

D3TYP.

TYP

C3

C3

F3

B1

B1

E

E B1 C3

G G G G G GB3

C3

C3

C3

C3 C3

D2

II

I I

A2

?D2 D1

D2

D1 D2

TYP.

F1TYP.

B3

B1

B1

B3

B3

B1

B2

B2B2

B2

B2

B2

B2 C3

A1

A1

A1

A1

A1

A3

A3 D1C1

C1

C3

M

M

M

M

M

C1

C1

C1

C1

C1

C1

C1

C1

A2

A2

A2

A2

BM

BM

BM

BM

A2A2

A1A1

A1A1

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

5

A4.30

A3 A3 A3 A3 A3 A3 A3 A3 A3

MS7

A4.30

MS

MS

MS

D2

SS

S S

S

BZ2-M

BZ1-J

BZ2-L

BZ2-K

BZ1-I

BZ2-J

BZ1-H

BZ2-FBZ2-G

BZ1-GBZ2-H

BZ1-FBZ2-D

BZ1-D

P4-L

P4-K

P4-J

BZ2-I

P4-H

P4-G

BZ1-E

P4-EP4-D

BZ1-C

P4-B

BZ1-BBZ2-B

P4-C

BZ2-C

BZ2-E

BZ2-A

BZ1-A

P4-A

C3

D4

MECH706

SHOWER746

BADGING744

PRODUCTION743

COATS751

INTERNS731

SEATING704

IT STOR.747

CORR.730

OPEN WORKSTATIONS729

CORR.730

OPEN WORKSTATIONS728

QUIET RM724

OPEN WS725

SEATING709

EVENT708

MEETING707

PANTRY705

KITCHEN703

COLLAB753

SEATING701

RECEPTION742

OPEN WS741

OPEN WS712

TEAM748

TEAM749

ENTRY700

CORRIDOR701A

OPEN WS750

MEETING720

OPEN SEATING710

CORR.744A

COPY/PRINT746A

OPEN OFFICE717

CORR.716

OPEN WS721

OPEN WS723

INTERNS727B

STUDIO752

IT745

OFFICE734

OFFICE733

OFFICE732

OFFICE740

QUIET RM736

QUIET RM737

QUIET RM738

MEETING739

C3 C3

F3

BM

L

L

8' - 3"AFF

A1

D1D2

NTYP

8A4.30

EXEC. OFFICE719

4

A4.30 TYP

3

A4.30

3

A4.30

3

A4.30

2

A4.30

1

A4.30

WAN

WAN

WAN

WAN

WANWAN

WAN

WAN

WAN

TYP

6

A4.30

6

A4.30

6

6

5TYP

A1

A1

A3

A3

F1

F1

F1

D1F2TYP

F3

F1

A2

D1

D1

8' - 3"AFF

7' - 0"AFF8' - 3"AFF

7' - 10"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

9' - 3"AFF8' - 9"AFF

8' - 9"AFF

8' - 3"AFF8' - 3"AFF

8' - 3"AFF

8' - 4"AFF

8' - 3"AFFTYP

8' - 3"AFF

8' - 3"AFF

8' - 0"AFF

8' - 0"AFF

8' - 0"AFF

8' - 0"AFF

8' - 0"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF 8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

8' - 0"AFF

8' - 3"AFF

8' - 4"AFF

8' - 4"AFF

8' - 4"AFF

8' - 0"AFF

8' - 3"AFF

8' - 3"AFFTYP

8' - 4"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFF

8' - 3"AFFTYP

8' - 3"AFF

8' - 3"AFF

8' - 0"AFF

7' - 8"AFF

8' - 0"AFF

7' - 8"AFF

7' - 8"AFF

8' - 0"AFF

9' - 3"AFF

8' - 6"AFF

8' - 2"AFF

8' - 6"AFF

8' - 10"AFF

9' - 3"AFF

8' - 6"AFF9' - 3"AFF

8' - 0"AFF

9' - 3"AFF8' - 6"AFF

8' - 2"AFF

8' - 6"AFF

8' - 10"AFF

8' - 10"AFF8' - 6"AFF

8' - 8"AFF

8' - 10"AFF

8' - 6"AFF

9' - 3"AFF8' - 3"AFF

8' - 10"AFF

8' - 6"AFF

8' - 10"AFF

9' - 3"AFF

8' - 6"AFF

8' - 6"AFF8' - 6"AFF

9' - 01/2"AFF

F1

F1

F1F1

A2

A2

C3

D3TYP.

D3TYP.

5

5

55

5

5

5

5

5

5

F2

F2

9

9

9

9

9

9

9

9

9

9

10

10

10

10

10

10

10

10

10

10

10 10

10

8

8

8

8

8

8116

6

7

12

8' - 0"AFF

8' - 0"AFF

B1

P

P P PP

P P P P

P

P

P

P

P

P

P

P

P

P

P

PP

P P

A1

A1

A1A1

A2

P

P

H H H H H H H

P

8' - 3"AFF

D3D3

S

M

TYP.

TYP.

M

M

M

M

A2

A2

A2

7

A4.30

P4-F

P4-I

8' - 0"AFF

8' - 2"AFF7' - 8"AFF

14

13

TYP.

13TYP.

13

F1 F1

F1F1TYP

TYP

8' - 3"AFF

8' - 9"AFF8' - 3"AFF

8' - 3"AFF

7' - 0"AFF 4

TYP

8' - 10"AFF

1

1

9' - 5"AFFK

K

K

4

A4.40

8' - 0"AFF 8' - 4"AFF

8' - 4"AFF

A2

A3

A2A2

A2A2

A2

A2

A2

G

G

C3

E

6

6

6

8

8

8

8

8

DRYWALL

2X4 ACT, ARMSTRONG ULTIMA BEVELEDTEGULAR EDGE, WHITE2x5 @ EVENT ROOM @ COVE LIGHTING

REFLECTED CEILING PLAN LEGEND AND NOTES

2X2 ACT, ARMSTRONG ULTIMABEVELED TEGULAR EDGE, WHITE

DRYWALL OR MDF CEILING, PAINTED.

WD2 WOOD PLANK PANELS AT 4'-0" x 4'-0" SECTIONSWITH 1/4"x1/4" REVEAL BETWEEN PANELS. ALL EDGESTO BE FINISHED.

RULON INTERNATIONAL PANEL GRILLE SYSTEM PG 3-12-52D IN SOLID POPLAR WITH STANDARD APRICOTSTAIN. BLADES ARE AT 3/4" x 3 1/4".

SUSPENDED DRYWALL/MDF

1

2

3

4

5

6

7

1.VERIFY EXACT HEIGHT OF EXISTING DOORS AND FRAMES TO BERELOCATED PRIOR TO FRAMING OF DRYWALL SOFFITS, TYPICAL.

2.PROVIDE A MOCK UP OF BZ1 AND BZ2 CEILING FOR APPROVALPRIOR TO CONSTRUCTION OF OPEN AREA CEILING.

3.ALL OPEN SLAB CEILING AND RELATED COMPONENTS SHALL BEPAINTED P3, TYPICAL.

4.ALL LIGHT FIXTURES SHALL BE INSTALLED AT CENTER OF TILE,TYPICAL.

5.REFER TO SHEET A4.10 FOR FINISHES AND LIGHT FIXTURESCHEDULE.

6.REFER TO ELECTRICAL DRAWINGS FOR SYSTEMS FURNITURE UPLIGHTING.

7.REFER TO A4.10 FOR ALTERNATE PRICING NOTES.8.REFER TO A4.30 FOR CEILING DETAILS.9.REFER TO A2.03 FOR CEILING DIMENSIONS.10. REFER TO A4.26 FOR CLOUD DIMENSIONS AND ANGLES.

GENERAL NOTES

OPEN TO SLAB ABOVE, PAINTED.8

JUNCTION BOX INCLUDING POWER& COMMUNICATION

J

FLUSH MOUNTED SPEAKERS

WIFIW

LINEAR DIFFUSER

WAN

MECHO SHADE TO MATCH EXISTING BUILDING STANDARD

BEAMFORMING MICROPHONE

BZ1

BZ2

9

10

DRYWALL CEILING PAINTED P3.

DRYWALL CEILING PAINTED P5.

XX

EXIT SIGN

11

12

2X4 ARMSTRONG ULTIMA BEVELED TEGULAR EDGE,WHITE WITH AXIOM TRIM EDGE

OPEN TO SLAB WITH DRYWALL EDGE AND LIGHTINGAT 2X2 CEILING

13 P FIXTURE INSTALLED AT CENTER OF WALL /COLUMN.

14 P FIXTURE SHALL BE INSTALLED AT CENTER OF2'x2' TILE ABOVE.

MS

BM

8

8

1800 K Street NWSuite 200Washington, DC 20006T 202 380 3120F 202 380 3128www.zgf.com

Drawing No.

Date:

Job No:

Checked By:

Drawn By:

Drawing Title

Revisions

1/15

/201

5 4:

46:4

6 P

M

15 JANUARY 2015

22183

A2.02

The Council ofInsurance Agentsand Brokers

Checker

Author

REFLECTEDCEILING PLAN,LEVEL 7

701 Pennsylvania AvenueWashington DC 20004

CONFORMED SET

1/8" = 1'-0"A2.027 REFLECTED CEILING PLAN

2

1 ADDITIONS &CLARIFICATIONS

09-26-14

2 CLARIFICATIONS 09-30-146 ASI 1 01-09-158 ASI 3 01-15-15

8

8

PROJECT ROLES:BIM PROJECT LEADCONSTRUCTION DOCUMENTSCONSTRUCTION ADMINISTRATION

THE COUNCIL tenant fit-outCOMPLETED 2015

Tenant improvement for The Council of Insurance Agents and Brokers (The Council) involved a complete renovation of their 15,000 SF space. Located on the 7th floor of 701 Pennsylvania Avenue in Washington, DC, with impressive views of the National Archives building and National Mall, the client sought a space that functioned both as a place of business and hosting venue. This was accomplished with a series of event and gathering spaces located towards the front of the space that gradually cascade out towards the larger open office areas.

Page 14: Phil Meyer RECENT WORKS
Page 15: Phil Meyer RECENT WORKS

PROJECT ROLES:TEAM CO-CHAIRTECHNICAL LEAD

QUAD HAUS competitionSUBMITTED 2015

RAINWATER COLLECTION

CISTERN

TREA

TMEN

T

LIVING MACHINE SETTLING TANK

GREEN ROOF

RETENTION PONDFERTILIZER

EXC

ESS

WAT

ER

SOLAR PVSOLAR HOT WATER

GROUND SOURCE

HEA

T PU

MP

PRIMARY COOLING

PRIMARY HEATING

STO

RAG

E TA

NK

SUPP

LEM

ENTA

L PE

AK

SPA

CE

HEA

TINVERTER

BATTERY

SUPPLEMENTAL PEAK COOLING

12 Homes + Community Respect Flood Plain Create Communal Spine

Integrate Living Machine Maximize Views Maximize Solar Access

QUAD HAUS was a competition project based in the Washington, DC community of Deanwood with the task of developing twelve residences and a small community center per Living Building Challenge standards. Our team quickly realized that by sharing resources in a type of “District” approach, the integrated sys-tems and initiatives of the LBC became feasible and adaptable across multiple scales.

Page 16: Phil Meyer RECENT WORKS
Page 17: Phil Meyer RECENT WORKS

APPENDIX 1graduate portfolio

phil meyerp: 217.714.9982e: [email protected]

Page 18: Phil Meyer RECENT WORKS

PHILIP MEYER

[email protected]

217.714.9982

Page 19: Phil Meyer RECENT WORKS

CONTENTS

2009 Chicago 03 hostel

i-space exhibition

2010 Haiti 17 emergency shelter

reconstruction urban strategy

cultural center + poolhouse

2012 Studio 804 29 center for sustainability

Resume 43

DATE PROJECT PAGE

Page 20: Phil Meyer RECENT WORKS
Page 21: Phil Meyer RECENT WORKS

CHICAGO 09

bike port

S P R I N G

Page 22: Phil Meyer RECENT WORKS

BIKE PORThostel

chicago, illinois

Chicago prides itself as being one of the most bike- friendly cities in the nation. However, upon closer investigation, Chicago’s bike network resembles a patchwork of disjointed parts. Chicago is planning a 500-mile bikeway network that will be completed by 2015 and has plans of reaching within one-half mile of every resident and neighborhood in Chica-go. In addition to a bike network that supplements the 2015 plan, the Bike Port provides a Mobility-on- Demand (MOD) bicycle sharing program. This not only encourages bike commuting, but it provides visitors with a convenient way to tour the city. While many view the city through the constraints of a car, Bike Port off ers people the chance to experience the city at a much more intimate and dynamic level.

CREDITS: WALLO VILLACORTA

Page 23: Phil Meyer RECENT WORKS

05

Page 24: Phil Meyer RECENT WORKS

WACKER DRIVE

VIEWS OF

CHICAGO RIVER

BICYCLE

STORAGE

Page 25: Phil Meyer RECENT WORKS

2015 Plan Bike Ports 2015

modular form study

chicago bicycle paths

design + programbike port

Situated above Wacker Drive, a major Chicago artery, Bike Port allows vehicular traffi c to fl ow un-impeded while maintaining its function as a hostel and MOD center. Catering to surrounding access points and paths of travel, a system of ramps and bike lanes guide bikers through Bike Port. The form of the building is based off of a simple modu-lar plan. Hostel rooms are concentrated on the exterior, providing natural light and ventilation as well as spectacular views of the Chicago River.

Page 26: Phil Meyer RECENT WORKS

HOSTEL BIKE PATH

WACKER DRIVE AERIAL

SHARE THE ROADA pedestrian walkway is separated from the bike path while overhead, the Mobility-on-Demand (MOD) bicycle storage units are visible through-out the building. Vehicular traffi c fl ows unim-peded below the structure.

Page 27: Phil Meyer RECENT WORKS

CENTRAL HUB

MODULAR LAYOUTOccupants are led to the “Hub” which contains a din-ing area, bicycle repair shop, locker room, showers, and hostel registration desk. Located on one level, twenty-eight hostel rooms off er spectacular views of the Chicago River and surrounding city. CENTRAL HUB

HOSTEL ROOMS

Page 28: Phil Meyer RECENT WORKS

ROOM LAYOUTA 415 sf hostel room allows space for 3-6 occupants. A two-room modular layout scheme provides a common social space with windows overlooking the Chicago River. The central structural core supports bicycle storage cases which can be viewed from the room. Sliding glass panels separate the pedestrian walkway from the bicycle path.

WALKING PATH

HOSTEL ROOM

SOCIAL SPACE

CHICAGO RIVER VIEW

OVERHEAD BICYCLE STORAGE

WACKER DRIVE [below]

BICYCLE PATH

WACKER DRIVE

MOD BICYCLE STORAGE POD

Page 29: Phil Meyer RECENT WORKS

MOBILITY ON DEMANDKey to the design of Bike Port is the unique bicycle storage system. MOD bikes are housed in structural glass cases located above the occupants and are visible from every aspect of the hostel. Bikes may be accessed from individual storage pods by swiping a MOD card.

11

Page 30: Phil Meyer RECENT WORKS
Page 31: Phil Meyer RECENT WORKS

CHICAGO 09architecture of crisis

AUTUMN

Page 32: Phil Meyer RECENT WORKS

Architecture of Crisis was a commentary on the recent suburban housing crisis aff ecting the United States. The exhibition defi ned crisis as a process of transformation or a need for change within the built environment. Based on the future surplus of vacant large-lot homes, it appears that there will be an abundance of material rendered unusable. Focusing on the economic, social and environmental crises resulting from the housing bubble, the exhibition used three materials found in typical wood frame construction- vinyl siding, wood trusses, and asphalt roof shingles- to challenge the potential value of suburban construction. Three suspended boxes served as apertures to frame views within speculative panoramic drawings. Strategically placed binoculars allowed visitors to participate in the panoramas and immerse themselves in the scenes of each story.

ARCHITECTURE OF CRISISi-space exhibition

chicago, illinois

Page 33: Phil Meyer RECENT WORKS

ARTIFACTSBased on naturally occuring wetland phenomena, recycled pre-engineered wood trusses could be assembled together to form fl oating islands. With future water levels forecast to rise, these fl oating islands could be used to reclaim lost land and may be used for agricultural purposes. Vinyl siding could be molded into rainwater collectors and asphalt shingels could become thermal solar collectors.

Page 34: Phil Meyer RECENT WORKS
Page 35: Phil Meyer RECENT WORKS

HAITI 10rubble house

carrefour idantite

AUTUMN

Page 36: Phil Meyer RECENT WORKS

In response to the devastating earthquake that struck Haiti in January 2010, Rubble House focused on four main areas of design: fl exibility, sustainability, structure and ease of construction.

re_think

re_distribute

RUBBLEHaiti is faced with the daunting task of cleaning up mountains of earthquake rubble. By using earthquake rubble to fi ll the gabion walls of the emergency shelter, inhabitants will be using a readily available material that provides thermal mass, privacy, and ventilation. Typically, massive tent cities populate natural disaster areas. Rubble House attempts to more elegantly promote order and provide the most basic needs of water, food and shelter.

RUBBLE HOUSEemergency shelter

port-au-prince, haiti

Page 37: Phil Meyer RECENT WORKS

variation in planThe Rubble House shelter allows for a high degree of fl exibility in the arrangement of spaces. Privacy walls can be added and subtracted in order to meet required needs. For example, sleeping areas for large families, communal gatherings, cooking locations, and temporary restrooms.

re_purpose

SUGARCANEGrown extensively throughout the Dominican Rupublic, sugarcane off ers multiple sustainable benefi ts for Haiti. Sugar cane bagasse ash is generated as a by-product from boilers in sugar and alcohol factories. When mixed with lime and aggregrate, the bagasse ash will produce a type of concrete that can be used in small structures. This ‘canecrete’ is used as a foundation for the gabion walls and provides a fl oor structure.

TYPICAL FLOOR PLANS1. sleeping space (5-10 people)2. communal gathering area3. sleeping space (3-6 people)4. sleeping space (4-8 people) 5. temporary restrooms

1

1

2

3

2

4

3

5

3

5

1.1. 2.2.

4.4.

3.3.

3.3. 3.3.

5.5.

5.5.1.1.

2.2.

19

Page 38: Phil Meyer RECENT WORKS

i n t

e g

r a

t e

d s

t r

u c

t u

r e

Rubble House shelter incorporates an integrated structural system to prevent damage from earth-quakes. Cross-bracing alternates between every other gabion wall-frame while tying the system with cross-bracing embedded in the fl oor frame. Additional bracing is located in the privacy walls. This system allows for both lateral and vertical loads seen during an earthquake.

re_assemblerubble house

I. assemble aluminum frame II. dig 1’-0” deep trenches for gabion walls III. pour canecrete mixture into trenches

IV. install gabion walls

V. pour canecrete mixture for fl oor slab

VI. infi ll gabion basket walls with rubble

Page 39: Phil Meyer RECENT WORKS

x1 x1 x2

x4

mix +rubble

aggregate

+ h20

canecrete

gabion basket walls

canvas roof or wall

aluminum framing members

k i t o f p a r t ss

x8 columns x4 roof members

aluminum floor system

x1 ready-made

connections

tools neededscrewdriverwrenchshovel

plates + bolts

VII. install canvas fabric roof and walls VIII. repeat process to create community clusters

Page 40: Phil Meyer RECENT WORKS

PRE_EARTHQUAKEHaiti is the poorest country in the Western Hemi-sphere. Carrefour is one of the most impoverished and populous districts of Haiti’s capital, Port-Au-Prince. Massive migration from the countryside has led to squatter communities taking up property along the beaches. Relentless population pressure has forced people to use the sea as a dump, creating more land for the slum to expand, while damaging the fi shing industry and economic potential of the beachfront.

CARREFOURreconstruction urban strategy

carrefour, haiti

Page 41: Phil Meyer RECENT WORKS

POST_EARTHQUAKECarrefour was located near the epicenter of the earthquake, causing extensive damage in the coastal slum neighborhoods. A plan was developed to bring economic growth and reconstruction to the coastal area through the use of programmatic piers, new housing developments and an urban farming network.

Coastal development will eliminate slums and provide a new gateway feature into the city.

masterplancarrefour

Phase I Construct Programmatic Piers

Phase IIDevelop Urban Farming Network

Phase IIINew Housing 23

Page 42: Phil Meyer RECENT WORKS

RECONSTRUCT A STRATEGYMassive overcrowding and natural disaster conditions have crippled the public and private sector’s ability to provide jobs, education and housing. Large pier structures allow for fl exible programmatic stacking of residential, commercial and service units.

MIXED-USE RELIEFConsolidating medical services, housing, commerce, community centers, food production, water storage, and utilites into one area help create support centers during times of need. They will also act as economic catalysts to the beachfront, propelling further investment into the poorest section of the city.

Page 43: Phil Meyer RECENT WORKS
Page 44: Phil Meyer RECENT WORKS

IDANTITEcultural center + poolhouse

carrefour, haiti

Page 45: Phil Meyer RECENT WORKS

Devastated by the loss of its people and its places, Haiti stands on the precipice of losing something more precious- its culture. Culture describes a people more than anything. It stems from history but dissolves and morphs over time. Culture is the backbone DNA of a country’s identity.

In an eff ort to revive public space and Haitian’s cul-tural identity, a complex system of layered and in-terlocking programmatic zones were developed to replace beachfront overtaken by landfi lls and slums. Each zone is a fusion of communal programs that are linked through an integrated urban landscape. The poolhouse and cultural center provide a recre-ational and educational node of social interaction.

27

Page 46: Phil Meyer RECENT WORKS
Page 47: Phil Meyer RECENT WORKS

STUDIO 804 12

SPRING

galileo pavilion

Page 48: Phil Meyer RECENT WORKS

STUDIO 804design_build studio

lawrence, kansas

Page 49: Phil Meyer RECENT WORKS

EXPECTATIONS + RECOGNITIONWith a new group of graduate students participating each year, Studio 804 endeavors to create a valuable experience that prepares students for work in a rapidly changing profession. Students are immersed in a com-prehensive process that includes everything from initial design to fi nished construction and documentation. Studio 804 will continue to achieve building innovations through the creation of sustainable architecture with a high level of craft, exceed traditional design models, promote the creative use of materials and utilize innova-tive technologies.

Studio 804 has received recognition in countless national and international journals and magazines and has won numerous design awards. The most recently completed project, The Center for Design Research, was featured in the October 2011 issue of Architect, the magazine of the American Institute of Architects. The Center for Design Research has also been awarded an Acknowledgement Prize by the Holcim Foundation for Sustainable Construction.

Page 50: Phil Meyer RECENT WORKS

GALILEO PAVILIONjccc center for sustainability

overland park, kansas

SITE STRATEGYThe design of the site plays a pivotal role in the pedestrian traffi c patterns on the south end of campus. The building is arranged on the site around a courtyard, blending indoors and outdoors with a visual connection between the spaces.

The goals of the Johnson County Community Col-lege Center for Sustainability, combined with the need for additional classrooms at the college, led to a unique opportunity to create an inspired learning space which also serves as an information center for the campus and the community at large. Galileo’s Pavilion, as envisioned, will become a landmark for JCCC’s sustainable initiatives. The building includes two classrooms and a student lounge. It will act as a platform for showcasing, interacting with, and educating both students and the general public about sustainability as well as innovations in design, technology, and construction. Completed in June 2012, Galileo Pavilion is projected as Studio 804’s fi fth LEED Platinum building and third Passive House certifi cation.

Page 51: Phil Meyer RECENT WORKS

6

00

F l o o r P l a n01 Classroom 102 Classroom 203 Lounge04 Coffee Bar05 Mechanical/ Storage Room06 Restroom07 Tracked Curtain08 Living Green Wall09 Skylights Above

01 02

03

04

060

07

0808

05050505

05

LOUNGE

CLASSROOM

Page 52: Phil Meyer RECENT WORKS

33

INSPIRING CLASSROOMSEncouraged by the client’s only design criteria, “insipiring class-room space,” both classrooms are fl ooded with natural light, and feature a reclaimed slate wall, a living green wall with over 2,000 plants, and are fl exible enough for multiple class uses.

Page 53: Phil Meyer RECENT WORKS
Page 54: Phil Meyer RECENT WORKS
Page 55: Phil Meyer RECENT WORKS

December 21

January 21

February 21

March 21

April 21

May 21

June 21

July 21

August 21

September 21

October 21

November 21

GALILEO GARDEN SCULPTUREOriginally situated on the site, Dale Eldred’s vision of the Galileo Garden was restored and implanted into the courtyard of Galileo’s Pavilion. The artist’s inspira-tions were manifested with the integration of science, light and nature at JCCC’s new center for sustainability. As Bruce Hartman, Executive Director of the Nierman Museum, stated in describing the Galileo Garden, “the entire campus is a classroom;” after all, the sculpture commemorates the absolution of Galileo Galilei and accepts the “implicit danger in advocating certainty in matters of scientifi c knowledge.”

HOW IT WORKSFour steel columns suspend a level circular disk, or sight, containing a hole in it. As the months change, the sun shining through the sight hits the ground at diff erent positions tracked by markings on a level nickel-coated steel plate. The rectangu-lar plate is oriented with its length running north and south and has seven line markings running east to west at various distances that indicate the 21st of every month. The light from the sight moves in a fi gure eight on the plate but as long as the lines are oriented east and west the month will remain correct.

37

Page 56: Phil Meyer RECENT WORKS
Page 57: Phil Meyer RECENT WORKS

SUSTAINABILITYKey design features include the use of passive heating and cooling systems such as thermal mass, broad South exposure, rainwater harvesting, and green roof trays in addition to active systems such as photovoltaics and a wind turbine.

Page 58: Phil Meyer RECENT WORKS

RECLAIMING MATERIALITYThe facade of the pavilion is clad in slate panels made from reclaimed chalkboards. The inherent skin contrast to the surround-ing buildings is key in not only setting apart this individual building, but more importantly, to stake JCCC’s own claim in contemporary and sustainable design.

Page 59: Phil Meyer RECENT WORKS

SLATE RAINSCREENMore than 450 4’x4’ slate chalkboards were salvaged from local school districts and cut into a coursing pattern. Each panel was then screwed to a metal hat channel and metal stud substructure, creating a natural stone rainscreen and eff ectively reusing a piece of historical regional fabric.