phase iv naming opportunities

20
A bright future — just around the corner PHASE IV NAMING OPPORTUNITIES

Upload: susan-wolf-berhow

Post on 02-Apr-2016

225 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

  • A bright future just around the corner

    P H A S E I VN A M I N G O P P O R T U N I T I E S

  • On May 25, 2011, K-State Engineering was charged with an initiative to increase our number of graduates to meet the demands for engineers in Kansas. We have crafted a multi-faceted strategic plan that outlines the colleges aspirations for the future and includes growth in facilities, faculty, leadership, research and, most important, students.

    To meet our unprecedented growth in enrollment, we have an opportunity to complete the final phase in the colleges engineering complex. The expansion of the building provides a unique opportunity for the College of Engineering and its graduates, friends and corporate partners to contribute toward its completion.

    Located at the corner of College Heights and Denison, the structure will serve as an impressive anchor to the K-State campus and a fitting addition to the previous three construction phases Durland, Rathbone and Fiedler halls. The completion of Phase IV will set the standard for learning, outreach, research innovation and excellence.

    The naming opportunities shared present a choice occasion for you to help develop our physical resources such as space for design teams, state-of-the-art classrooms, multimedia conference rooms, specialized laboratories and equipment to bring it alive. These facilities provide unique naming opportunities for honoring a loved one or promoting a corporate image.

    We appreciate your careful consideration in your participation as we continue a legacy for future generations of K-State engineering students.

    A bright future is just around the corner.

    PROJECT SUMMARYSquare footage: 107,000 sq. ft. of the new building and renovation of the front entrance of Rathbone Hall.Estimated project cost: $45 million (including construction costs, FF&E, all associated fees and contingencies).While the Phase IV expansion is working to be completely privately funded, the timeline of the project will be accelerated though the issuance of up to $20 million in bonds to be serviced through the University Engineering Initiative Act and construction contributions.The contracted Architects are Perkins+Will. They teamed with Nevius Serig Palmer Architecture (NSP) and Affiliated Engineers Inc (AEI).The Construction Managers are McCownGordon.Under the guidelines of the Kansas alternative project delivery building construction procurement act K.S.A. 75-37,141, construction manager at risk process has been selected and approved as the delivery method for the Phase IV expansion.

    College of Engineering

    COURTYARD

    ATRIUM

    SERVICE ENTRANCE

    CAMPUS

    ENTRY

    PARKING ENTRY

    DENISON AVENUE

    DURLAN

    D HALLFIEDL

    ER HALL

    RATHBONE HALL

  • 2

    LARGE CONF. ROOM1139

    ELEC.1129

    DATA1131

    CATERING KITCHEN1138

    ELEV5.41

    WOMEN1124

    MEN1123

    OPEN TO BELOW

    COLLABORATIVE LEARNING1112

    TEACHING LAB1117

    SPEC. TEACHING1116

    ASSISTANT DEAN1141B

    GEN. TEACHING1114

    SW14

    OPEN TO BELOW

    COLLEGE RECEPTION1141

    COMPUTER LAB1113

    OFFICE1111

    STUDENT CENTER1118

    SHELL DATA CENTER1132

    TA1118A

    ACM1118B

    TEAMINGLB1003JAN

    1128

    SYSTEM ADMIN1119

    COLLAB TEAMING1134

    OFFICE1141D

    UPS1119A

    COLLAB TEAMING1136 COLLAB TEAMING

    1137

    FAMILY RR1126

    SUPPLY1122

    AV1127

    ATRIUM

    1274 SF

    DATACENTER

    CLOSET1139A

    STORAGE

    STORAGE1133

    SW13

    DN

    FORMULA BAJA HPV WORK AREA91

    STUDENT SHOP89

    CONCRETE MIXING LAB107

    CONC CANOE91B

    ELEC.104

    DATA106

    ELEVEL5

    288 SFSTAIR 1

    SW13

    STRUCTURES LAB108

    AERO & UAV91E

    MECHANICAL117

    CURING107A

    JAN103

    CLASSROOM97

    CLASSROOM96

    DIST LEARNING94

    STOR92

    STOR111

    COLLAB. TEAMING116

    267 SFSTAIR 2

    SW14

    NORMAL ELEC.99

    NORMAL ELEC98

    WOMEN102

    MEN101

    COLLAB. TEAMING115

    COMPOSITE91D

    PAINT ROOM91A COLLAB. TEAMING

    113

    LECTURE HALL1109

    260 SFSTORAGE

    109

    COLLAB. TEAMING114

    CLASSROOM93

    AV CLOSET112

    BRIDGE STOR91C

    GROUND FLOOR

    General engineering space

    Computing and Information Sciences

    Civil Engineering

    Electrical and Computer Engineering

    Open space

    Named space

    FIRST FLOOR

  • 3

    FAC OFF2177

    FAC OFF2178

    FAC OFF2179

    FAC OFF2181

    DEPT HEAD2184E

    FAC OFF2169

    FAC OFF2211

    OPEN TO BELOW

    ELEC.2203

    DATA?

    2204

    WOMEN2198

    MEN2197

    FAC OFF2212

    FAC OFF2213

    OPEN TO BELOW

    FAC OFF2214

    INTRO TO COMP ENGG2188

    MICROCONTROLLERS2189

    RECEPTION/WAIT.2184

    STAFF2159

    FAC OFF2209

    FAC OFF2216

    ROBOTICS2223

    FAC OFF2182

    STOR.2184C

    BIOINFORMATICS2224

    KDD2226

    GRAD2221

    STAFF2184A

    SW14

    GK-122227

    HARDWARE STOR2222

    JAN2202

    LIGHT WELL

    DIGITAL SYSTEMS2192

    MICROPROCESSOR2191

    HIGH ASSURANCE LAB2206

    1335 SF

    CYBERDEFENSE

    LAB

    KEDZIE MUTLI AG.2194

    SECURITY LAB2193

    FAC OFF2217

    STAFF2184D

    FAC OFF2171

    SYS ADM2219

    COPY2184B

    FAC OFF2162 SYS ADM

    2218

    MEETING2207

    SMART-GRID2186

    POWER ELEC2187

    SMALL CONF ROOM2168

    FAMILY RR2199

    SUPPLY2196

    ??

    FAC OFF2166FAC OFF

    2167

    FAC OFF2164

    FAC OFF2161FAC OFF

    2173

    FAC OFF2176

    MEETING2183

    OFFICE2206C

    OFFICE2206B

    CONF.2206A

    A / V2201

    FAC OFF2174

    FAC OFF2172 FAC OFF

    2163

    FAC OFF2160

    FAC OFF2158

    FAC OFF2157

    SYS ADMIN2221A

    SYS ADMIN2221B

    SW13

    FAC OFF3117

    STAFF3113

    STAFF3112

    FAC OFF3114

    FAC OFF3116

    DEPT HEAD3109

    SYSTEM ADMIN3079

    SW14

    RECEPT/WAIT3108

    SW13

    OPEN TO BELOW

    ELEC.3104

    DATA3106

    EL5

    WOMEN3102

    MEN3101

    HARDWARE3063

    ACOUSTICAL3107

    DEPT LOUNGE3072

    GRAD OPEN OFFICE3062

    ROOF STOR2.38

    STAFF3108A

    COMPUTER LAB3071

    JAN3103

    COPY3111

    ECE ROOF AREARESEARCH SUPPORT

    LIGHT WELL

    SANDIA3068

    FAC OFF3078

    FAC OFF3077

    WIRELESS LAB3069

    MEDIUM CONF. RM3099

    FAC OFF3118

    FAC OFF3058

    FAC OFF3059

    FAC OFF3061

    FAC OFF3076

    FAC OFF3074

    FAC OFF3073

    OPEN TO BELOW

    GRAD RESEARCH3064

    FAC OFF3119

    GRAD RESEARCH3066

    GRAD RESEARCH3067

    ECEROOF AREARESEARCH SUPPORT

    PROJ3108B

    BIOMED-MED3098

    COMM. CIRCUITS LAB3097

    FAC OFF3096FAC OFF

    3094FAC OFF3093FAC OFF

    3092FAC OFF3091

    FAC OFF3089FAC OFF

    3088FAC OFF3087FAC OFF

    3086FAC OFF3084FAC OFF

    3083FAC OFF3082

    MEETING ROOM3081

    TEAMING KITCHEN3062A

    SECOND FLOOR

    THIRD FLOOR

  • Ground Floor 5

    GROUND FLOOR

    ALAN LEVIN STUDENT DESIGN TEAM SUITE

    AREA NAMINGIncludes work bays, student shop, design team spaces, welding and paint shops

    The open bays have a hoist feature above them allowing for movement or display of large, heavy projects. The bays have large, bifold hangar doors opening to showcase their models. Projects can be rolled out and displayed on temperate days. Students will be able to take advantage of a larger open space to work in. The enclosed areas provide a work space for those projects that have intricate parts and generate more dust and dirt, such as the concrete canoe. The student shop has shared tools and equipment for more efficient use of resources. The space supports K-State engineering by providing common-use space for students.

    DN

    FORMULA BAJA HPV WORK AREA91

    STUDENT SHOP89

    CONCRETE MIXING LAB107

    CONC CANOE91B

    ELEC.104

    DATA106

    ELEVEL5

    288 SFSTAIR 1

    SW13

    STRUCTURES LAB108

    AERO & UAV91E

    MECHANICAL117

    CURING107A

    JAN103

    CLASSROOM97

    CLASSROOM96

    DIST LEARNING94

    STOR92

    STOR111

    COLLAB. TEAMING116

    267 SFSTAIR 2

    SW14

    NORMAL ELEC.99

    NORMAL ELEC98

    WOMEN102

    MEN101

    COLLAB. TEAMING115

    COMPOSITE91D

    PAINT ROOM91A COLLAB. TEAMING

    113

    LECTURE HALL1109

    260 SFSTORAGE

    109

    COLLAB. TEAMING114

    CLASSROOM93

    AV CLOSET112

    BRIDGE STOR91C

    DN

    FORMULA BAJA HPV WORK AREA91

    STUDENT SHOP89

    CONCRETE MIXING LAB107

    CONC CANOE91B

    ELEC.104

    DATA106

    ELEVEL5

    288 SFSTAIR 1

    SW13

    STRUCTURES LAB108

    AERO & UAV91E

    MECHANICAL117

    CURING107A

    JAN103

    CLASSROOM97

    CLASSROOM96

    DIST LEARNING94

    STOR92

    STOR111

    COLLAB. TEAMING116

    267 SFSTAIR 2

    SW14

    NORMAL ELEC.99

    NORMAL ELEC98

    WOMEN102

    MEN101

    COLLAB. TEAMING115

    COMPOSITE91D

    PAINT ROOM91A COLLAB. TEAMING

    113

    LECTURE HALL1109

    260 SFSTORAGE

    109

    COLLAB. TEAMING114

    CLASSROOM93

    AV CLOSET112

    BRIDGE STOR91C

    DN

    FORMULA BAJA HPV WORK AREA91

    STUDENT SHOP89

    CONCRETE MIXING LAB107

    CONC CANOE91B

    ELEC.104

    DATA106

    ELEVEL5

    288 SFSTAIR 1

    SW13

    STRUCTURES LAB108

    AERO & UAV91E

    MECHANICAL117

    CURING107A

    JAN103

    CLASSROOM97

    CLASSROOM96

    DIST LEARNING94

    STOR92

    STOR111

    COLLAB. TEAMING116

    267 SFSTAIR 2

    SW14

    NORMAL ELEC.99

    NORMAL ELEC98

    WOMEN102

    MEN101

    COLLAB. TEAMING115

    COMPOSITE91D

    PAINT ROOM91A COLLAB. TEAMING

    113

    LECTURE HALL1109

    260 SFSTORAGE

    109

    COLLAB. TEAMING114

    CLASSROOM93

    AV CLOSET112

    BRIDGE STOR91C

  • 6 Ground Floor

    DN

    FORMULA BAJA HPV WORK AREA91

    STUDENT SHOP89

    CONCRETE MIXING LAB107

    CONC CANOE91B

    ELEC.104

    DATA106

    ELEVEL5

    288 SFSTAIR 1

    SW13

    STRUCTURES LAB108

    AERO & UAV91E

    MECHANICAL117

    CURING107A

    JAN103

    CLASSROOM97

    CLASSROOM96

    DIST LEARNING94

    STOR92

    STOR111

    COLLAB. TEAMING116

    267 SFSTAIR 2

    SW14

    NORMAL ELEC.99

    NORMAL ELEC98

    WOMEN102

    MEN101

    COLLAB. TEAMING115

    COMPOSITE91D

    PAINT ROOM91A COLLAB. TEAMING

    113

    LECTURE HALL1109

    260 SFSTORAGE

    109

    COLLAB. TEAMING114

    CLASSROOM93

    AV CLOSET112

    BRIDGE STOR91C

  • Ground Floor 7

    NAMING OPPORTUNITIESCourtyardThe courtyard will provide an outdoor social gathering area, further enhancing the sense of community on which the college prides itself. The grounds are not just green to the eye, but have environmentally green aspects as well. The courtyard landscape utilizes native plants and a rain garden eliminates storm water runoff. The walkway from the southwest will invite pedestrians into the new building and the courtyard. It is meant to be both a learning and a reflective place.

    Cost of naming . . . . . . . . . . . . .$3,000,000

    Jim & Ann Coen Collaboration Teaming Room 113

    Ed & Eunice Wambsganss Collaboration Teaming Room 114

    Cathy & Tom Ritter Collaboration Teaming Room 115

    Jerry & Robin Westhoff Collaboration Teaming Room 116

    Structures Lab 108Includes control, instrumentation and pump room

    The new structures laboratory will provide K-State researchers with the ability to evaluate the performance of full-scale structural members and systems under realistic loading conditions. The laboratory will have a strong floor, overhead crane and state-of-the-art testing equipment, enabling the application of very large static and dynamic forces in both vertical and horizontal directions.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,400

    Concrete Mixing & Curing Lab 107The lab will support teaching and research projects related to concrete structures.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,400

    Distance Learning Control Center 94This space, complete with audio/video recording and transmission equipment, will support distance education, which is a growing feature of higher education. Professionals will also be able to receive supplemental training or fulfill their professional development hours without having to physically come to Manhattan.

    Cost of naming . . . . . . . . . . . . . . . $50,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 150

    College Classroom (2 opportunities) 96, 97These state-of-the-art classrooms will feature smart walls for projections, graphics, lecture notes and real-time notations from the instructor. Swivel seating will enable collaboration and interaction between the students. Capacity: 40 students each.

    Cost of naming . . . . . . . . . . $500,000 eachSquare feet . . . . . . . . . . . . . . . . . . . 900 each

    Large College Classroom 93This state-of-the-art classroom will feature smart walls for projections, graphics, lecture notes and real-time notations from the instructor. Swivel seating will enable collaboration and interaction between the students. Capacity: 70 students.

    Cost of naming . . . . . . . . . . . . . $1,000,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,600

  • 8 First Floor

    LARGE CONF. ROOM1139

    ELEC.1129

    DATA1131

    CATERING KITCHEN1138

    ELEV5.41

    WOMEN1124

    MEN1123

    OPEN TO BELOW

    COLLABORATIVE LEARNING1112

    TEACHING LAB1117

    SPEC. TEACHING1116

    ASSISTANT DEAN1141B

    GEN. TEACHING1114

    SW14

    OPEN TO BELOW

    COLLEGE RECEPTION1141

    COMPUTER LAB1113

    OFFICE1111

    STUDENT CENTER1118

    SHELL DATA CENTER1132

    TA1118A

    ACM1118B

    TEAMINGLB1003JAN

    1128

    SYSTEM ADMIN1119

    COLLAB TEAMING1134

    OFFICE1141D

    UPS1119A

    COLLAB TEAMING1136 COLLAB TEAMING

    1137

    FAMILY RR1126

    SUPPLY1122

    AV1127

    ATRIUM

    1274 SF

    DATACENTER

    CLOSET1139A

    STORAGE

    STORAGE1133

    SW13

    FIRST FLOOR

    NAMING OPPORTUNITIES

    AtriumEver since people began making tools, society has had engineers. They are the creative innovators who improve our quality of life. Our reliance on engineers has grown, but many people still dont understand what engineers do it seems complicated and mystifying. Now, imagine people visiting Kansas State University for open house, a campus tour or a football game. As you enter the atrium, it opens you to a world of exploration, unlocking the world of engineering for everyone to experience.

    Cost of naming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000

  • First Floor 9

    Carl & Mary Ice Reception Center 1141

    Bartak Family Assistant Dean Office 1141B

    Staff Office 1141DCost of naming . . . . . . . . . . . . . . . $40,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 140

    Large Conference Room 1139This space is designed to provide a quality audio-visual experience with appropriate technologies to support multimedia presentations and video conferencing. Guests would be able to enjoy comfortable surroundings and an environment conducive to dynamic discussions.

    Cost of naming . . . . . . . . . . . . . $1,000,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,300

    Lecture Hall 1109As an informational-educational venue, the 250-seat auditorium will host thousands of individuals for engineering classes, presentations, trainings, information sessions, panels and other gatherings.

    Cost of naming . . . . . . . . . . . . .$2,500,000Square feet . . . . . . . . . . . . . . . . . . . . . . 3,100

    Collaborative Learning Center 1112The Collaborative Learning Center (CLC) is the home to the Scholars Assisting Scholars (SAS) free tutoring program. SAS supports student success and learning for students in first and second year core science, math, and computer science courses. It is a student-centered space for education and creative activities, reference, research, technical assistance on demand, and flexible furniture facilitating collaborative learning.

    Cost of naming . . . . . . . . . . . . . $1,000,000Square feet . . . . . . . . . . . . . . . . . . . . . .4,000

    CLC Office 1111Cost of naming . . . . . . . . . . . . . . . $40,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 140

    Thayne & Leona Kraus Teaming Room 1134

    Kraus Family Teaming Room 1136

    Doug & Connie Sterbenz Collaborative Teaming Room 1137

    G. Rhea & Pat Serpan Teaming Room LB1003

    Data Center (BeoCat) 1121BeoCat, our computer cluster, provides critical computational resources for multidisciplinary research across campus. It is currently the largest research cluster in Kansas with around 2,000 cores. It supports hundreds of users at K-State conducting research in a wide range of disciplines from bioinformatics to foundations of linguistics to protecting lives through better bullet-resistant vests.

    Cost of naming . . . . . . . . . . . . .$2,000,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,700

    System Administrator Office 1119Supports two administrators.

    Cost of naming . . . . . . . . . . . . . . . $50,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 300

    Engineering Computer Lab 1113Open access computer lab will be equipped with a variety of software specific to the engineering programs.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 800

    General Teaching Lab 1114This is a high-use teaching lab which primarily serves core classes taken by computer science and computer engineering students. It consists of 50 workstations with all of the required software. This allows for support for a wide variety of software. This lab is available 24/7.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,200

    Specialized Teaching Lab 1116This lab will contain approximately 24 workstations with high-end graphic capabilities. This will provide for coursework in games programming, graphics and visualization software.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,000

    Teaching Lab 1117The teaching lab collaborates with faculty and students to promote excellence in teaching and learning throughout the department. Our work contributes to CISs commitment to educational innovation and its standing as a leader in science and engineering education.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 900

    Student Center 1118A large open area for CIS, designed to foster collaboration, exercise leadership and connect globally through advanced technologies.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 900

  • 10 First Floor

    Teaching Assistant Office 1118AOffice space for CIS teaching assistants to conduct work hours, study and network with other students.

    Cost of naming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400

    ACM 1118BGathering space for Association of Computing Machinery Student Chapter.

    Cost of naming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,000Square feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .150

    LARGE CONF. ROOM1139

    ELEC.1129

    DATA1131

    CATERING KITCHEN1138

    ELEV5.41

    WOMEN1124

    MEN1123

    OPEN TO BELOW

    COLLABORATIVE LEARNING1112

    TEACHING LAB1117

    SPEC. TEACHING1116

    ASSISTANT DEAN1141B

    GEN. TEACHING1114

    SW14

    OPEN TO BELOW

    COLLEGE RECEPTION1141

    COMPUTER LAB1113

    OFFICE1111

    STUDENT CENTER1118

    SHELL DATA CENTER1132

    TA1118A

    ACM1118B

    TEAMINGLB1003JAN

    1128

    SYSTEM ADMIN1119

    COLLAB TEAMING1134

    OFFICE1141D

    UPS1119A

    COLLAB TEAMING1136 COLLAB TEAMING

    1137

    FAMILY RR1126

    SUPPLY1122

    AV1127

    ATRIUM

    1274 SF

    DATACENTER

    CLOSET1139A

    STORAGE

    STORAGE1133

    SW13

  • Second Floor 11

    SECOND FLOOR

    SECOND FLOORFLOOR NAMINGCost of naming . . . . . . . . . . . . .$5,000,000Square feet . . . . . . . . . . . . . . . . . . . . .20,000

    COMPUTING AND INFORMATION SCIENCES DEPARTMENTAL SUITEAREA NAMINGIncludes reception, department head office and staff offices

    The second floor will house the Department of Computing and Information Sciences. Computer and information science staff and faculty will enjoy expanded work space designed to accommodate efficient work flow and private meeting space, while outfitted with new furnishings and office equipment. Moving from Nichols Hall will allow for more camaraderie and collaboration with other engineering departments.

    Cost of naming . . . . . . . . . . . . .$2,000,000Square feet . . . . . . . . . . . . . . . . . . . . . . 1,100

    FAC OFF2177

    FAC OFF2178

    FAC OFF2179

    FAC OFF2181

    DEPT HEAD2184E

    FAC OFF2169

    FAC OFF2211

    OPEN TO BELOW

    ELEC.2203

    DATA?

    2204

    WOMEN2198

    MEN2197

    FAC OFF2212

    FAC OFF2213

    OPEN TO BELOW

    FAC OFF2214

    INTRO TO COMP ENGG2188

    MICROCONTROLLERS2189

    RECEPTION/WAIT.2184

    STAFF2159

    FAC OFF2209

    FAC OFF2216

    ROBOTICS2223

    FAC OFF2182

    STOR.2184C

    BIOINFORMATICS2224

    KDD2226

    GRAD2221

    STAFF2184A

    SW14

    GK-122227

    HARDWARE STOR2222

    JAN2202

    LIGHT WELL

    DIGITAL SYSTEMS2192

    MICROPROCESSOR2191

    HIGH ASSURANCE LAB2206

    1335 SF

    CYBERDEFENSE

    LAB

    KEDZIE MUTLI AG.2194

    SECURITY LAB2193

    FAC OFF2217

    STAFF2184D

    FAC OFF2171

    SYS ADM2219

    COPY2184B

    FAC OFF2162 SYS ADM

    2218

    MEETING2207

    SMART-GRID2186

    POWER ELEC2187

    SMALL CONF ROOM2168

    FAMILY RR2199

    SUPPLY2196

    ??

    FAC OFF2166FAC OFF

    2167

    FAC OFF2164

    FAC OFF2161FAC OFF

    2173

    FAC OFF2176

    MEETING2183

    OFFICE2206C

    OFFICE2206B

    CONF.2206A

    A / V2201

    FAC OFF2174

    FAC OFF2172 FAC OFF

    2163

    FAC OFF2160

    FAC OFF2158

    FAC OFF2157

    SYS ADMIN2221A

    SYS ADMIN2221B

    SW13

    FAC OFF2177

    FAC OFF2178

    FAC OFF2179

    FAC OFF2181

    DEPT HEAD2184E

    FAC OFF2169

    FAC OFF2211

    OPEN TO BELOW

    ELEC.2203

    DATA?

    2204

    WOMEN2198

    MEN2197

    FAC OFF2212

    FAC OFF2213

    OPEN TO BELOW

    FAC OFF2214

    INTRO TO COMP ENGG2188

    MICROCONTROLLERS2189

    RECEPTION/WAIT.2184

    STAFF2159

    FAC OFF2209

    FAC OFF2216

    ROBOTICS2223

    FAC OFF2182

    STOR.2184C

    BIOINFORMATICS2224

    KDD2226

    GRAD2221

    STAFF2184A

    SW14

    GK-122227

    HARDWARE STOR2222

    JAN2202

    LIGHT WELL

    DIGITAL SYSTEMS2192

    MICROPROCESSOR2191

    HIGH ASSURANCE LAB2206

    1335 SF

    CYBERDEFENSE

    LAB

    KEDZIE MUTLI AG.2194

    SECURITY LAB2193

    FAC OFF2217

    STAFF2184D

    FAC OFF2171

    SYS ADM2219

    COPY2184B

    FAC OFF2162 SYS ADM

    2218

    MEETING2207

    SMART-GRID2186

    POWER ELEC2187

    SMALL CONF ROOM2168

    FAMILY RR2199

    SUPPLY2196

    ??

    FAC OFF2166FAC OFF

    2167

    FAC OFF2164

    FAC OFF2161FAC OFF

    2173

    FAC OFF2176

    MEETING2183

    OFFICE2206C

    OFFICE2206B

    CONF.2206A

    A / V2201

    FAC OFF2174

    FAC OFF2172 FAC OFF

    2163

    FAC OFF2160

    FAC OFF2158

    FAC OFF2157

    SYS ADMIN2221A

    SYS ADMIN2221B

    SW13

    FAC OFF2177

    FAC OFF2178

    FAC OFF2179

    FAC OFF2181

    DEPT HEAD2184E

    FAC OFF2169

    FAC OFF2211

    OPEN TO BELOW

    ELEC.2203

    DATA?

    2204

    WOMEN2198

    MEN2197

    FAC OFF2212

    FAC OFF2213

    OPEN TO BELOW

    FAC OFF2214

    INTRO TO COMP ENGG2188

    MICROCONTROLLERS2189

    RECEPTION/WAIT.2184

    STAFF2159

    FAC OFF2209

    FAC OFF2216

    ROBOTICS2223

    FAC OFF2182

    STOR.2184C

    BIOINFORMATICS2224

    KDD2226

    GRAD2221

    STAFF2184A

    SW14

    GK-122227

    HARDWARE STOR2222

    JAN2202

    LIGHT WELL

    DIGITAL SYSTEMS2192

    MICROPROCESSOR2191

    HIGH ASSURANCE LAB2206

    1335 SF

    CYBERDEFENSE

    LAB

    KEDZIE MUTLI AG.2194

    SECURITY LAB2193

    FAC OFF2217

    STAFF2184D

    FAC OFF2171

    SYS ADM2219

    COPY2184B

    FAC OFF2162 SYS ADM

    2218

    MEETING2207

    SMART-GRID2186

    POWER ELEC2187

    SMALL CONF ROOM2168

    FAMILY RR2199

    SUPPLY2196

    ??

    FAC OFF2166FAC OFF

    2167

    FAC OFF2164

    FAC OFF2161FAC OFF

    2173

    FAC OFF2176

    MEETING2183

    OFFICE2206C

    OFFICE2206B

    CONF.2206A

    A / V2201

    FAC OFF2174

    FAC OFF2172 FAC OFF

    2163

    FAC OFF2160

    FAC OFF2158

    FAC OFF2157

    SYS ADMIN2221A

    SYS ADMIN2221B

    SW13

  • 12 Second Floor

    NAMING OPPORTUNITIESDepartment Head Office 2184ECost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 250

    Reception/Waiting Area 2184Cost of Naming. . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Staff Office 2184A, 2184D, (4 opportunities) 2157, 2158Cost of naming . . . . . . . . . . . $40,000 eachSquare feet . . . . . . . . . . . . . . . . . . . 140 each

    Departmental Lounge 2159Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 600

    Meeting Area 210SFOpen meeting areas will provide space for impromptu gatherings between students.

    Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 200

    CIS Faculty Office 21612181, (24 opportunities) 22092217Cost of naming . . . . . . . . . . . $40,000 eachSquare feet . . . . . . . . . . . . . . . . . . . . . . . 140

    Small Conference Room 2168The conference room will provide space for engineering faculty and staff to meet.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    FAC OFF2177

    FAC OFF2178

    FAC OFF2179

    FAC OFF2181

    DEPT HEAD2184E

    FAC OFF2169

    FAC OFF2211

    OPEN TO BELOW

    ELEC.2203

    DATA?

    2204

    WOMEN2198

    MEN2197

    FAC OFF2212

    FAC OFF2213

    OPEN TO BELOW

    FAC OFF2214

    INTRO TO COMP ENGG2188

    MICROCONTROLLERS2189

    RECEPTION/WAIT.2184

    STAFF2159

    FAC OFF2209

    FAC OFF2216

    ROBOTICS2223

    FAC OFF2182

    STOR.2184C

    BIOINFORMATICS2224

    KDD2226

    GRAD2221

    STAFF2184A

    SW14

    GK-122227

    HARDWARE STOR2222

    JAN2202

    LIGHT WELL

    DIGITAL SYSTEMS2192

    MICROPROCESSOR2191

    HIGH ASSURANCE LAB2206

    1335 SF

    CYBERDEFENSE

    LAB

    KEDZIE MUTLI AG.2194

    SECURITY LAB2193

    FAC OFF2217

    STAFF2184D

    FAC OFF2171

    SYS ADM2219

    COPY2184B

    FAC OFF2162 SYS ADM

    2218

    MEETING2207

    SMART-GRID2186

    POWER ELEC2187

    SMALL CONF ROOM2168

    FAMILY RR2199

    SUPPLY2196

    ??

    FAC OFF2166FAC OFF

    2167

    FAC OFF2164

    FAC OFF2161FAC OFF

    2173

    FAC OFF2176

    MEETING2183

    OFFICE2206C

    OFFICE2206B

    CONF.2206A

    A / V2201

    FAC OFF2174

    FAC OFF2172 FAC OFF

    2163

    FAC OFF2160

    FAC OFF2158

    FAC OFF2157

    SYS ADMIN2221A

    SYS ADMIN2221B

    SW13

  • Second Floor 13

    CIS Graduate Student Area 2221The graduate research offices will offer an environment that provides CIS graduate students an opportunity to conduct work hours, relax, study and network with other students.

    Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,200

    CIS Graduate Student Offices (2 opportunities) 2221A, BCost of naming . . . . . . . . . . . $40,000 eachSquare feet . . . . . . . . . . . . . . . . . . . . . . . 140

    K-12 Outreach/Embedded Systems Lab 2227The research focus in this area is on distributed, fault-tolerant, real-time embedded systems. This lab also hosts the National Science Foundation (NSF) GK-12 program whose goal is to enhance the usefulness, practicality and relevance of sensor technology in education by linking sensor research with Kansas high school science and technology curriculum, and provide communication and research opportunities in sensor technology for graduate students in engineering. This lab consists of sensor equipment, computers and handheld devices, and has office space for graduate students.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 600

    Knowledge, Discovery & Database (KDD) Lab 2226Researchers in this lab are interested in machine learning, data mining and knowledge discovery from large spatial and temporal databases, human-computer intelligent interaction (HCII), and high-performance computation in learning and optimization. This lab engages a number of graduate and undergraduate students in research.

    Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 400

    Robotics Lab 2224Teams from the lab have placed first, second and third in the annual AAAI robotics competitions. This lab consists of a collection of robots with wide ranges of capabilities, and has office space for students.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Bioinformatics Lab 2223The lab will be used to design algorithms and to develop tools for analyzing large amounts of data, in particular, molecular sequence and gene expression data. Researchers from this lab collaborate with researchers in bioinformatics and genomics at K-State. This lab consists of office space for graduate students and a meeting area.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Security Lab 2193This lab focuses on research in privacy, anonymity, censorship resistance and network security. Recently, this lab has focused on security of distributed medical systems and cyber-physical systems. Apart from workstations, this lab consists of office space for students and a meeting area.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 600

    Cyber Defense Lab (Argus Lab) 2208This lab focuses on both fundamental and applied research to address cybersecurity challenges. The Center for Information and Systems Assurance (CISA) is located in this lab and has been designated as a National Center for Academic Excellence in Security by the National Security Agency and the Department of Homeland Security. The lab also hosts the Cyber Defense Club whose goal is to train students and build a community of students interested in cybersecurity. This lab consists of a collection of machines to train students in cyber-defense/offense techniques.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,300

    Multi-Agent Robotics Lab 2194The robotics laboratory supports research into software engineering applications to build robust, autonomous robotics software, including multi-agent solutions.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 700

    High Assurance Lab 2206The mission of the Laboratory for Static Analysis and Transformation of Software (SAnToS) is to develop foundational techniques, robust tools and practical integrated methodologies for building safety and security critical software systems. Since its founding, SAnToS has received over $13 million in funding from national agencies such as the NSF, DARPA, NASA, DOD and industry groups at Lockheed Martin, Rockwell Collins, Intel, IBM and Honeywell. This lab consists of student/post-doc office spaces and a group meeting space.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,000

  • 14 Second Floor

    System Administration Office (2 opportunities) 2218, 2219Cost of naming . . . . . . . . . . . $40,000 eachSquare feet . . . . . . . . . . . . . . . . . . . . . . . 140

    Burns & McDonnell Smart Grid Lab (SGL) 2186

    This is a lab that supports both research and teaching in the broad area known as the Smart Grid. With generous support from industry, the lab is well equipped with modern power distribution switching and control equipment as well as the related network communications equipment to study modern problems in the Smart Grid. Besides research projects, students in multiple classes will utilize the lab to enhance their learning experience.

    Power Electronics Lab 2187This will primarily be a laboratory to conduct research on power electronics, which is currently focused on converters and controllers for renewable energy generation and electric vehicles. This lab consists of benches for the electronics development as well as a desk area for students to do their other work.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 700

    Intro to Computer Engineering Lab 2188Students in ECE 241 (Introduction to Computer Engineering), have exclusive access to this high use lab (140 students per semester). This class/lab serves freshmen in computer engineering, electrical engineering, and computer science. Tables with computers and development boards are used to support up to 16 students at any given time. The lab will be available 24/7.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 700

    Microcontrollers Lab 2189This is a lab dedicated to the microcontrollers class which serves approximately 70 students per semester. Computer engineering students take classes in microcontrollers as do most electrical engineering students. Benches with test equipment are used to support up to 14 students at any given time. The lab will be available 24/7.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 700

    Microprocessor Lab 2191This lab supports the embedded systems area of emphasis in computer engineering. Courses offered include Real-Time Embedded Systems during the fall semester and Microcomputer Systems Design and Real-Time Embedded Systems Design both offered during the spring semester. There are approximately 40 students per year who use the lab. Benches with test equipment are used to support up to 20 students at any given time. The lab will be available 24/7.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 700

    Digital Systems Lab 2192The space is used as a digital hardware and DSP lab for primary use by advanced level undergraduates and graduate students. The lab supports four courses: Adv. Digital Design, Computer Engineering Design Lab, Digital Signal Processing Lab and Computer Design II. Benches with test equipment will support up to 14 students at any given time. The lab will be available 24/7.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 700

    FAC OFF2177

    FAC OFF2178

    FAC OFF2179

    FAC OFF2181

    DEPT HEAD2184E

    FAC OFF2169

    FAC OFF2211

    OPEN TO BELOW

    ELEC.2203

    DATA?

    2204

    WOMEN2198

    MEN2197

    FAC OFF2212

    FAC OFF2213

    OPEN TO BELOW

    FAC OFF2214

    INTRO TO COMP ENGG2188

    MICROCONTROLLERS2189

    RECEPTION/WAIT.2184

    STAFF2159

    FAC OFF2209

    FAC OFF2216

    ROBOTICS2223

    FAC OFF2182

    STOR.2184C

    BIOINFORMATICS2224

    KDD2226

    GRAD2221

    STAFF2184A

    SW14

    GK-122227

    HARDWARE STOR2222

    JAN2202

    LIGHT WELL

    DIGITAL SYSTEMS2192

    MICROPROCESSOR2191

    HIGH ASSURANCE LAB2206

    1335 SF

    CYBERDEFENSE

    LAB

    KEDZIE MUTLI AG.2194

    SECURITY LAB2193

    FAC OFF2217

    STAFF2184D

    FAC OFF2171

    SYS ADM2219

    COPY2184B

    FAC OFF2162 SYS ADM

    2218

    MEETING2207

    SMART-GRID2186

    POWER ELEC2187

    SMALL CONF ROOM2168

    FAMILY RR2199

    SUPPLY2196

    ??

    FAC OFF2166FAC OFF

    2167

    FAC OFF2164

    FAC OFF2161FAC OFF

    2173

    FAC OFF2176

    MEETING2183

    OFFICE2206C

    OFFICE2206B

    CONF.2206A

    A / V2201

    FAC OFF2174

    FAC OFF2172 FAC OFF

    2163

    FAC OFF2160

    FAC OFF2158

    FAC OFF2157

    SYS ADMIN2221A

    SYS ADMIN2221B

    SW13

  • Third Floor 15

    THIRD FLOOR

    THIRD FLOORFLOOR NAMINGCost of naming . . . . . . . . . . . . .$5,000,000Square feet . . . . . . . . . . . . . . . . . . . . .20,000

    ELECTRICAL AND COMPUTER ENGINEERING DEPARTMENTAL SUITEAREA NAMINGIncludes department head office, reception, project coordinator and staff offices

    The third floor will house the Department of Electrical and Computer Engineering. Electrical and computer engineering staff and faculty will enjoy expanded work space designed to accommodate efficient work flow and private meeting space, while outfitted with new furnishings and office equipment.

    Cost of naming . . . . . . . . . . . . .$2,000,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,000

    THIRD FLOOR

    THIRD FLOORFLOOR NAMINGCost of naming . . . . . . . . . . . . .$5,000,000Square feet . . . . . . . . . . . . . . . . . . . . .20,000

    ELECTRICAL AND COMPUTER ENGINEERING DEPARTMENTAL SUITEAREA NAMINGIncludes department head office, reception, project coordinator and staff offices

    The third floor will house the Department of Electrical and Computer Engineering. Electrical and computer engineering staff and faculty will enjoy expanded work space designed to accommodate efficient work flow and private meeting space, while outfitted with new furnishings and office equipment.

    Cost of naming . . . . . . . . . . . . .$2,000,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,000

    FAC OFF3117

    STAFF3113

    STAFF3112

    FAC OFF3114

    FAC OFF3116

    DEPT HEAD3109

    SYSTEM ADMIN3079

    SW14

    RECEPT/WAIT3108

    SW13

    OPEN TO BELOW

    ELEC.3104

    DATA3106

    EL5

    WOMEN3102

    MEN3101

    HARDWARE3063

    ACOUSTICAL3107

    DEPT LOUNGE3072

    GRAD OPEN OFFICE3062

    ROOF STOR2.38

    STAFF3108A

    COMPUTER LAB3071

    JAN3103

    COPY3111

    ECE ROOF AREARESEARCH SUPPORT

    LIGHT WELL

    SANDIA3068

    FAC OFF3078

    FAC OFF3077

    WIRELESS LAB3069

    MEDIUM CONF. RM3099

    FAC OFF3118

    FAC OFF3058

    FAC OFF3059

    FAC OFF3061

    FAC OFF3076

    FAC OFF3074

    FAC OFF3073

    OPEN TO BELOW

    GRAD RESEARCH3064

    FAC OFF3119

    GRAD RESEARCH3066

    GRAD RESEARCH3067

    ECEROOF AREARESEARCH SUPPORT

    PROJ3108B

    BIOMED-MED3098

    COMM. CIRCUITS LAB3097

    FAC OFF3096FAC OFF

    3094FAC OFF3093FAC OFF

    3092FAC OFF3091

    FAC OFF3089FAC OFF

    3088FAC OFF3087FAC OFF

    3086FAC OFF3084FAC OFF

    3083FAC OFF3082

    MEETING ROOM3081

    TEAMING KITCHEN3062A

    FAC OFF3117

    STAFF3113

    STAFF3112

    FAC OFF3114

    FAC OFF3116

    DEPT HEAD3109

    SYSTEM ADMIN3079

    SW14

    RECEPT/WAIT3108

    SW13

    OPEN TO BELOW

    ELEC.3104

    DATA3106

    EL5

    WOMEN3102

    MEN3101

    HARDWARE3063

    ACOUSTICAL3107

    DEPT LOUNGE3072

    GRAD OPEN OFFICE3062

    ROOF STOR2.38

    STAFF3108A

    COMPUTER LAB3071

    JAN3103

    COPY3111

    ECE ROOF AREARESEARCH SUPPORT

    LIGHT WELL

    SANDIA3068

    FAC OFF3078

    FAC OFF3077

    WIRELESS LAB3069

    MEDIUM CONF. RM3099

    FAC OFF3118

    FAC OFF3058

    FAC OFF3059

    FAC OFF3061

    FAC OFF3076

    FAC OFF3074

    FAC OFF3073

    OPEN TO BELOW

    GRAD RESEARCH3064

    FAC OFF3119

    GRAD RESEARCH3066

    GRAD RESEARCH3067

    ECEROOF AREARESEARCH SUPPORT

    PROJ3108B

    BIOMED-MED3098

    COMM. CIRCUITS LAB3097

    FAC OFF3096FAC OFF

    3094FAC OFF3093FAC OFF

    3092FAC OFF3091

    FAC OFF3089FAC OFF

    3088FAC OFF3087FAC OFF

    3086FAC OFF3084FAC OFF

    3083FAC OFF3082

    MEETING ROOM3081

    TEAMING KITCHEN3062A

    FAC OFF3117

    STAFF3113

    STAFF3112

    FAC OFF3114

    FAC OFF3116

    DEPT HEAD3109

    SYSTEM ADMIN3079

    SW14

    RECEPT/WAIT3108

    SW13

    OPEN TO BELOW

    ELEC.3104

    DATA3106

    EL5

    WOMEN3102

    MEN3101

    HARDWARE3063

    ACOUSTICAL3107

    DEPT LOUNGE3072

    GRAD OPEN OFFICE3062

    ROOF STOR2.38

    STAFF3108A

    COMPUTER LAB3071

    JAN3103

    COPY3111

    ECE ROOF AREARESEARCH SUPPORT

    LIGHT WELL

    SANDIA3068

    FAC OFF3078

    FAC OFF3077

    WIRELESS LAB3069

    MEDIUM CONF. RM3099

    FAC OFF3118

    FAC OFF3058

    FAC OFF3059

    FAC OFF3061

    FAC OFF3076

    FAC OFF3074

    FAC OFF3073

    OPEN TO BELOW

    GRAD RESEARCH3064

    FAC OFF3119

    GRAD RESEARCH3066

    GRAD RESEARCH3067

    ECEROOF AREARESEARCH SUPPORT

    PROJ3108B

    BIOMED-MED3098

    COMM. CIRCUITS LAB3097

    FAC OFF3096FAC OFF

    3094FAC OFF3093FAC OFF

    3092FAC OFF3091

    FAC OFF3089FAC OFF

    3088FAC OFF3087FAC OFF

    3086FAC OFF3084FAC OFF

    3083FAC OFF3082

    MEETING ROOM3081

    TEAMING KITCHEN3062A

  • 16 Third Floor

    FAC OFF3117

    STAFF3113

    STAFF3112

    FAC OFF3114

    FAC OFF3116

    DEPT HEAD3109

    SYSTEM ADMIN3079

    SW14

    RECEPT/WAIT3108

    SW13

    OPEN TO BELOW

    ELEC.3104

    DATA3106

    EL5

    WOMEN3102

    MEN3101

    HARDWARE3063

    ACOUSTICAL3107

    DEPT LOUNGE3072

    GRAD OPEN OFFICE3062

    ROOF STOR2.38

    STAFF3108A

    COMPUTER LAB3071

    JAN3103

    COPY3111

    ECE ROOF AREARESEARCH SUPPORT

    LIGHT WELL

    SANDIA3068

    FAC OFF3078

    FAC OFF3077

    WIRELESS LAB3069

    MEDIUM CONF. RM3099

    FAC OFF3118

    FAC OFF3058

    FAC OFF3059

    FAC OFF3061

    FAC OFF3076

    FAC OFF3074

    FAC OFF3073

    OPEN TO BELOW

    GRAD RESEARCH3064

    FAC OFF3119

    GRAD RESEARCH3066

    GRAD RESEARCH3067

    ECEROOF AREARESEARCH SUPPORT

    PROJ3108B

    BIOMED-MED3098

    COMM. CIRCUITS LAB3097

    FAC OFF3096FAC OFF

    3094FAC OFF3093FAC OFF

    3092FAC OFF3091

    FAC OFF3089FAC OFF

    3088FAC OFF3087FAC OFF

    3086FAC OFF3084FAC OFF

    3083FAC OFF3082

    MEETING ROOM3081

    TEAMING KITCHEN3062A

    NAMING OPPORTUNITIESDepartment Head Office 3109Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 250

    Reception/Waiting Area 3108Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Staff Office (3 opportunities) 3108A, 3112, 3113Cost of naming . . . . . . . . . . . $40,000 eachSquare feet . . . . . . . . . . . . . . . . . . . 140 each

    Departmental Lounge 3072Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 300

    Project Coordinator Office 3108BCost of naming . . . . . . . . . . . . . . . $40,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 140

    Electrical & Computer Engineering Faculty Office (25 opportunities) 30733095Cost of naming . . . . . . . . . . . $40,000 eachSquare feet . . . . . . . . . . . . . . . . . . . 140 each

    Don Gemaehlich ECE Advisors Office 3096

    ECE Advisors Office Cost of naming . . . . . . . . . . . . . . . $40,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 140

  • Third Floor 17

    ECE Research Lab Graduate Research Offices 3067The graduate research offices will offer an environment that provides ECE graduate students and faculty an opportunity to conduct work.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,300

    WiCom Research Group 3066The WiCom group supports a wide range of fundamental and applied research in the areas of wireless communication and information processing. The core expertise of the group is in mathematical/statistical modeling, estimation and detection/decision theory, optimization and control theory, and information theory.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Sunflower Networking Group & EPICENTER 3064The Sunflower Networking Group conducts theoretical research in emerging areas and to apply optimal networking solutions to current and future realistic problems through simulations. General areas of interest include networking protocols, architecture, modeling and analysis, and networking solutions for smart grids. Kansas State Universitys EPICENTER provides resources to analyze, build and simulate mathematical models for spreading phenomena in complex networks. One of the main goals of EPICENTER is providing policymakers with real-time, flexible modeling tools to curtail epidemiological outbreaks, whether it occurs in humans, animals, plants or computers.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    ECE Graduate Research Area 3062The graduate research area will offer an environment that provides graduate students an opportunity to conduct research projects individually as well as in team settings.

    Cost of naming . . . . . . . . . . . . . . $100,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Hardware Office 3063Cost of naming . . . . . . . . . . . . . . . $40,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 200

    James Michael Duncan, MD Meeting Room 3081

    System Administrator Office 3079Cost of naming . . . . . . . . . . . . . . . $40,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 180

    Biomedical Suite 3098This lab develops medical components to assist with the health care of both humans and animals. In one area of the lab both undergraduate and graduate students develop physiological sensors and related systems to improve future medical care options. The other area of this lab currently focuses on new treatment technologies, especially for cancer patients using non-invasive thermal ablation of tumors. Yet another project involves the use of micro-bubbles to deliver medication to very localized areas of the body.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,400

    ECE Computer Lab 3071This is a general purpose computer lab that serves all ECE students, undergraduate and graduate. It is intended to provide students 20 workstations and is a high-usage space. Each workstation has all specialized software used in ECE courses and labs that is typically not found on other university computers. The lab will be available 24/7.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Wireless Hardware Lab 3069This research space is dedicated to faculty and students (undergraduate and graduate) working on wireless hardware research projects.

    Cost of naming . . . . . . . . . . . . . . .$150,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 200

    Communication Circuits Lab 3097This lab serves primarily seniors in the communications emphasis area of electrical engineering. The courses it supports are Design of Communications Circuits, Design of Microwave Circuits and Digital Radio Hardware Design. Benches with test equipment are used to support up to 16 students at any given time. The lab will be available 24/7.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 750

    Aerospace Electronics Research Laboratory 3068This research laboratory supports graduate and undergraduate students working on government-sponsored research projects that require a security clearance. The lab is typically a mix of both bench space for hardware/software development as well as desk space. Currently this lab supports students on a large collaborative NASA and Sandia Lab project.

    Cost of naming . . . . . . . . . . . . . . $250,000Square feet . . . . . . . . . . . . . . . . . . . . . . . 500

    Medium Conference Room 3099The conference room will provide space for engineering faculty and staff to meet.

    Cost of naming . . . . . . . . . . . . . . $500,000Square feet . . . . . . . . . . . . . . . . . . . . . .1,300

    Acoustical Lab 3107This is research space will be used to conduct research that requires acoustical isolation. Current plans are to use if for experiments on brain computer interfaces.

    Cost of naming . . . . . . . . . . . . . . . $50,000Square feet . . . . . . . . . . . . . . . . . . . . . . . . 90

    Roof Lab AreaThis open area supports research opportunities and experiments for a variety of areas in electrical and computer engineering, including those in biomedical device testing, satellite and wireless communications, and renewable engineering.

    Cost of naming . . . . . . . . . . . . . . $250,000

  • 081414

    YOU CAN HELP!The dedication and involvement of K-State engineering alumni and partners help continue the traditions, as well as support students and faculty. With your support, we will mold future leaders in the engineering profession. We invite you to explore the opportunities on how you can give:

    Gifts of cashWhen you donate cash, it provides an immediate benefit and the maximum income tax deduction to you. Gifts of cash qualify for an income tax deduction equal to the full value of the gift.

    Gifts of securitiesGifts of appreciated stocks, bond or mutual fund shares qualify for an income tax deduction equal to the current market value of the transferred assets. By transferring these assets directly to the KSU Foundation, you also avoid paying capital gains tax. For most people, this double tax savings makes a very effective gift option.

    Pledges Gift commitments to the Phase IV project may be spread up to five years. For example, a $100,000 gift might be made with a pledge of $50,000 per year for two years, or $20,000 per year for five years.

    The development team will assist you with making your gift a reality. They will assist with the forms and recognition as you invest in this opportunity.

    We invite you to become part of our exciting future. Contact a member of our development team today and begin the discussion about how you can make a difference.

    For more information, please contact:

    Lori Rogge, CAPSenior Director of DevelopmentCollege of [email protected]

    Brett LarsonDirector of DevelopmentCollege of [email protected]

    Jennie NevilleDevelopment OfficerCollege of [email protected]

    2323 Anderson Avenue, Suite 500Manhattan, Kansas 66502-2911785-532-6266 800-432-1578 www.engg.ksu.edu www.found.ksu.edu