Phase 2a Route Overview for House of Commons Select CommitteeProfessor Andrew McNaughton
19 March 2018
P1 (1) HOC/10001/0002
High Speed Rail Network
2P1 (2) HOC/10001/0003
High Speed Rail is 53 Years Old
3P1 (3) HOC/10001/0004
International Technical Standards
4P1 (4) HOC/10001/0005
IndicativeRail Corridor
5P1 (5) HOC/10001/0006
HS1 Two Track Railway
6P1 (6) HOC/10001/0007
200m long trains which can be coupled to run in pairs 400m long
7P1 (7) HOC/10001/0008
HS2 Design Principles
8
1. Integrated noise protection and visual screening2. Further screen planting to supplement earthworks and fit with local landscape3. An earthworks solution removes the need for a fence type noise barrier (cutting costs + maintenance burden)4. Land returned to agriculture up to the railway (opportunity to improve agricultural land)5. This earthworks solution minimises the width of the rail corridor6. Protection of environmental features (e.g. ecology, heritage, landscape)7. Boundary fence visually concealed behind the earthworks8. The majority of the original land take is handed back for productive use
P1 (8) HOC/10001/0009
Phase 2a Route Overview
9P1 (9) HOC/10001/0010
1. Fradley to Kings Bromley
10P1 (10) HOC/10001/0011
2. Kings Bromley to Blithbury
Newlands Lane Auto Transformer Feeder Station
11P1 (11) HOC/10001/0012
Newlands Lane Auto Transformer Feeder Station
View from North looking South
12P1 (12) HOC/10001/0013
3. Colton to Colwich
Newlands Lane Auto Transformer Feeder Station
13P1 (13) HOC/10001/0014
4. Moreton to Ingestre
Great Haywood viaduct
14P1 (14) HOC/10001/0015
5. Staffordshire Show Ground to Marston
15P1 (15) HOC/10001/0016
6. Marston to Stone
Stone Infrastructure Maintenance Base - Rail
16P1 (16) HOC/10001/0017
7. Stone Infrastructure Maintenance Base to Swynnerton
Stone Infrastructure Maintenance Base - Rail
17P1 (17) HOC/10001/0018
Stone Infrastructure Maintenance Base - Rail
18P1 (18) HOC/10001/0019
8. Swynnertonto Stableford
19P1 (19) HOC/10001/0020
9. Whitmore Heath Tunnel to MadeleyTunnel
20P1 (20) HOC/10001/0021
High Speed Porous Tunnel Portal
21P1 (21) HOC/10001/0022
9. Whitmore Heath Tunnel to MadeleyTunnel
22P1 (22) HOC/10001/0023
10. MadeleyTunnel to Blakenhall
23P1 (23) HOC/10001/0024
11. Crewe Approaches
24P1 (24) HOC/10001/0025
Crewe Existing Layout
25P1 (25) HOC/10001/0026
Crewe Proposed Layout HS2 Trains Passing Crewe Highlighted
26P1 (26) HOC/10001/0027
Crewe Proposed Layout HS2 to WCML Highlighted
27P1 (27) HOC/10001/0028
28P1 (28) HOC/10001/0029
High Speed Rail Network
29P1 (29) HOC/10001/0030