phase 2 feedback & phase 3 expectations senior design 2004
TRANSCRIPT
Phase 2 FeedbackPhase 2 Feedback
&&
Phase 3 ExpectationsPhase 3 Expectations
Senior Design 2004
Phase 2 Feedback
Overall very good progress Significant work still ahead Continue to improve oral
presentation and written report Watch your Phase 2 video Take advantage of available
resources
Senior DesignSenior DesignMEEG401 - Fall 2004
- Create/Design Concept; Analyze; Test- Benchmark Technology
Assess Customer Wants/Metrics/Specifications
DesignConcept
ProveConcept
- Technology & Benchmarking- Concept generation & selection- Project Plan - Concept Design
- Engineering Basis- Plan update
- Prototype- Path forward
Development0Confirm Needs/Scope
- Customers & Needs- Scope definition - Technology/Science- Key metrics
Deliverables
1SynthesizeConcept 2 3
-Prototype-Test Results-Transition Plan
Schedule
23 - Poster Due
Senior DesignSenior DesignMEEG401 - Fall 2004 - Expectations
Phase 3 Milestone: Dec. 13th, 10a to 7pValidate Concept – build, test,
demonstrateProject Transition to Sponsor
Evidence:Peer evaluationsPosterOnline logbookWritten final report (to sponsor)
summarizing entire project
Oral presentation at UD (to Engr. professionals)summarizing entire project
Posters
Summarize “The Project” on 1 poster Only ESSENTIAL points & graphics All visible from 5 feet away
Used to inform ASME professionals Draft due on WebCT Tuesday, Nov. 23 Revise using Tech Editor and TA
feedback
Deliverables to Sponsor• Prototype• Final Presentation• Final Report
Design Justification Design Package
Assembly Drawings Component Drawings Sub-System Schematics System Integration Operating & R&M Procedures Safety (e.g. labels)
Transition Plan
Proving Your Concept
• Credible Prototype Relevant to the problem At a minimum, accommodates valid measurements of
critical performance metrics Could be a working solution/system
• Testing Well-Designed Experiments Good Test Setup = Good Data Valid Interpretation of Results (Statistics) In the End, Performance with Respect to Metrics/Targets
Quantified• Closing the Loop with Sponsor/Customer
Validate your conclusions
Transition Plan
Objective: Transition project to the sponsor’s business
Leverage Your Insights Recognize Additional Development and Scale-up
Issues Recommend “Next-Steps” for Further Development
and/or Implementation Documentation and Training
Discuss/Review with sponsor prior to implementation
May consider a spring “continuation” for tech elective credit
Transition Plan: Put your project in perspective
t
Cost
Proof ofConcept
DevelopConcept
Implement Concept
Scale up?
Senior Senior DesignDesignProjectProject
Questions/Comments?
Class Exercise
Present validation plan: What are you going to validate? What experiments are you planning to
conduct (including the design of the experiments)?
Which statistical analysis techniques do you plan to use?
What is the link between your experimental results and the key performance/cost requirements (i.e. metrics/targets)?