PFR of Rosso Laminates LLP
Page 1 of 16
PRE FEASIBILITY REPORT FOR OBTAINING ENVIRONMENTAL CLEARANCE
For the Proposed Resins
Manufacturing Unit of
M/s. ROSSO LAMINATE LLP
Survey No: 55 Paiki 1/Paiki 2, 55 Paiki 3, Opposite of Ashwamegh Hotel, NH-8A, At. Timbadi, Morbi-363642
Gujarat
PROJECT PROPONENT
Mr. Rajeshbhai Becharbhai Boda E- mail: [email protected]
PREPARED BY
T. R. ASSOCIATES A-401, S. G. Business Hub,
B/w Sola Bhagwat & Gota Bridge, Near Umiya Campus, S. G. Highway, Ahmedabad.
Contact No.: 98253 71099 Email: [email protected]
July 2019
PFR of Rosso Laminates LLP
Page 2 of 16
1. Introduction
M/s. Rosso Laminates LLP is a partnership firm proposing to set up a small scale Resin
Manufacturing unit at Survey No: 55 Paiki 1/Paiki 2, 55 Paiki 3, Opposite of Ashwamegh
Hotel, NH-8A, At. Timbadi, Morbi-363642, Gujarat.
2. Project Proponent and their back ground
Company is promoted by its partner. Detail of partners is as given below : Sr. No.
Name of the Partner Age (yrs.)
Mobile No. Educational qualification
Experience Yrs.
1 Ketanbhai Parasotambhai Baraiya
37 +91 9825447871 B.Com L.L.B. 2 YEAR
2 Bharat Dharshibhai Boda 37 +91 9898475309 I.T.I. 7 YEAR 3 Rajeshbhai Becharbhai
Boda 35 +91 9426124247 B.A. 7 YEAR
4 Jaydeepbhai Maheshbhai Kasundra
25 +91 7567507762 B.E. In Electrical 2 YEAR
3. Brief description of nature of the project:
M/s. Rosso Laminates LLP is proposing to manufacture Melamine Formaldehyde Resin,
Phenol Formaldehyde Resin and Urea Formaldehyde Resin at Survey No 55 Paiki 1/Paiki
2, 55 Paiki 3, Opposite of Ashwamegh Hotel, NH-8A, At. Timbadi, Morbi-363642, Gujarat.
Proposed products will be used for manufacturing of Laminated sheets.
The proposed products like Melamine Formaldehyde Resin, Phenol Formaldehyde Resin
and Urea Formaldehyde Resin falls under Category 5(f) as stated in Environment Impact
Assessment Notification Published on 14th September, 2006. Further, the location of the
proposed project is outside the notified industrial estate and it also not fall into small
scale unit criteria described in EIA notification 25th June 2014. Hence, the project
proponent has to obtain the EC from the Ministry of Environment, Forest & Climate
Change, New Delhi. M/s. T. R. Associates has been appointed to carry out EIA/EMP
studies for obtaining Environmental Clearance.
PFR of Rosso Laminates LLP
Page 3 of 16
The total land area of company is 14,569 m2 out of which 4807 m2 (33 % of total land) area will be used for greenbelt development. The estimated cost of the proposed Resin project will be 85 Lakhs. Total budget allocation towards Environmental Management Facilities will be approx. Rs. 40 Lakhs. Total 9 persons will be employed including skilled persons, unskilled persons and office staff. Need for the project and its importance to the country and or region:
Formaldehyde (37%) is used as raw material for resins, adhesive manufacturing. Resins are used predominantly in the wood products industry as adhesives. Growth of these resins is strongly correlated to construction/remodeling activity (which accounts for over 50% of consumption), and to a lesser degree, to the automotive industry.
The proposed products like Resins (Melamine Formaldehyde ,Phenol Formaldehyde and Urea Formaldehyde) mainly used to produce Electrical Insulation Board and H.P. Decorative Laminated Sheets. These sheets have good market demand to develop the home and office for furniture.
Demand-Supply Gap:
The average production of laminated sheets has crossed approximately 130 million sheets inclusive of all thicknesses but the gap between installed capacity and demand is growing bigger. During FY 2011-2012 phases that gap narrowed with sudden demand in lower thickness segment but later capacities came in place and the laminated sheets market became a pressure driven market. It is caution for any new comer that if he enters, he should be prepared for "More investments, more efforts and a long wait for margins".
The burgeoning market demands of urban and semi-urban India are estimated at Rs 5,00,000 Crore. The demand-supply gap has already attracted foreign players to India; and the e-retailing boom offers immense business opportunities. But a more 15% of India's woodworking industry is organized. Its semi-skilled carpenters, self-styled interior decorators and small-scale local manufacturers will need to be trained and organized to meet future market demands and exploit business opportunities.
PFR of Rosso Laminates LLP
Page 4 of 16
Imports v/s Indigenous production:
Indian market is open and big that is why every kind of import is booming. Indian plywood and panel trade has become global place as the consumption of different imported ply panels are on the rise. Unlike before Indians are now welcomed by plywood manufacturer of China. Earlier India was a self dependent country for commercial or high quality plywood, but sharp drop in domestic manufacturing output has resulted in material sourcing from countries like Burma, Malaysia, Indonesia, China, Vietnam etc. Now Indian plywood market is somehow curtailed or competed by incoming panel products from China. Be it film face, decorative, laminate or MR plywood everything is now being imported partially or more and is sold. Indian industrialist must understand the fact that its no more a regional shift, it is a global shift. Indian technology should be upgraded and updated as per with international standards.
The working environment in India has changed tremendously. Earlier the trade fairs were hardly participated by foreign timber, lumber and plywood manufacturing companies where as now it is flooded with global suppliers.
Export Possibility:
There is only market of Resins in local market. Resins are intermediate products for manufacturing of Laminated Sheets. Resins are quite expensive for export. So we have only local market for sale.
PFR of Rosso Laminates LLP
Page 5 of 16
Employment Generation (Direct and Indirect) due to the project:
This project will provide direct employment to 9 persons whereas it will provide employment to many others indirectly.
4. Project Description
(i) Type of project including interlinked and interdependent projects: Resins including P.F. resin, M.F. resin and U.F. resin are used in production of laminated sheets. So plywood industries and laminated sheets industries are interdependent on resin industries.
(ii) Location
Proposed project is to be located Survey No: 55 Paiki 1/Paiki 2, 55 Paiki 3, Opposite of Ashwamegh Hotel, NH-8A, At. Timbadi, Morbi-363642, Gujarat.
Google image showing proposed project site is given below;
NODE LATTITUDE LONGITUDE P 22°52'37.13"N 70 50 59.22E A 22°52'34.30"N 70°50'58.10"E B 22°52'37.01"N 70°50'57.18"E C 22°52'39.58"N 70°50'57.51"E D 22°52'39.70"N 70°50'59.67"E E 22°52'35.16"N 70°51'1.88"E
PFR of Rosso Laminates LLP
Page 6 of 16
Salient features in the surroundings area of the proposed site within 10 km radius are as follows:
Sr. No. Important Features Description 1 Location Survey No: 55 Paiki 1/Paiki 2, 55 Paiki 3.,
Opposite of Ashwamegh Hotel, NH-8A, At. Timbadi, Morbi-363642, Gujarat.
2 GPS Coordinates Latitude: 22°52'37.13"N Longitude: 70°50'59.22"E
3 Temperature Range 19.7˚C to 33.8˚C (average)
4 Mean Sea Level 45 m
5 Annual Rain Fall 592 mm (average)
6 Nearest Railway Station Morbi Railway station– 6.04 km in SSW direction
7 Nearest Airport Rajkot Airport – 63.16 km in South direction
8 Nearest Town Nearest District & City: Morbi – 6.15 km in
SSW direction
9 Nearest Village Juna Sadulka – 1.72 km in WNW direction
Timbdi-2.45 km in SSW direction
Dharampur- 2.60 km in SSW direction
10 Nearest National Highway NH 8A – 0.60 km in WSW direction
11 Nearest Road Morbi Bypass Road – 0.80 km in W direction
12 Nearest River/Water body Macchu River – 3.39 km in SWS direction
13 National Parks / Sanctuary Rampara Wildlife Sanctuary 39.20 km in SSE direction
PFR of Rosso Laminates LLP
Page 7 of 16
(iii) Alternative Sites considered No other sites were selected.
(iv) Size or magnitude of operation
List of Proposed Products
Sr. No. Name of Product Quantity
1 Phenol Formaldehyde Resin 200 MT/Month
2 Melamine Formaldehyde Resin 100 MT/Month
3 Urea Formaldehyde Resin 200 MT/Month
Note:
Resin will be used for manufacturing of laminates sheets.
(v) Project description with process details Details of manufacturing process are given in Annexure- 4 of Form- 1.
(vi) Raw material required along with estimated quantity
Sr. No.
Name of the Product Name of the Raw Materials
Quantity (MT/Month)
1 Phenol Formaldehyde Resin
Phenol 92.21 Formaldehyde (37 %) 119.37 Caustic 1.05
2 Melamine Formaldehyde Resin
Melamine 20 Formaldehyde (37 %) 29.75 Caustic 0.25
3 Urea Formaldehyde Resin
Urea 79 Formaldehyde(37%) 29.750
PFR of Rosso Laminates LLP
Page 8 of 16
Formaldehyde (37 %) 119 Caustic 1 Acetic Acid 1
(vii) Resource optimization/ recycling and reuse envisaged in the project, if any, should
be briefly outlined. Latest Process technology will be adopted as available in market with optimum resources requirement with highest yield and less waste and pollution generation. Treated industrial effluent will be reused in cooling and other possible activities. In addition to this, all the feasible cleaner production technologies will be adopted.
(viii) Availability of water its source, Energy/ power requirement and source should be
given. Energy/power requirement will be 250 kWh which will be procured through Paschim Gujarat Vij Company Limited.
The total water requirement will be 17.55 kl/day which will be fulfilled by own Borewell/Open well.
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their
Management/disposal
• Hazardous Waste Generation and Disposal Details of hazardous waste generation and its disposal are given in Annexure- 5 of Form- 1.
• Wastewater Generation and Disposal Facility Details of domestic as well as industrial wastewater generation and its disposal are given in Annexure- 7 of Form- 1.
(x) Schematic representations of the feasibility drawing which give information of EIA purpose
PFR of Rosso Laminates LLP
Page 9 of 16
1. Site Analysis (i) Connectivity
Nearest railway station Morbi Railway station 5.6 km
Nearest Highway NH 8A 0.60 Km
Nearest airport Rajkot 63.16 km
(ii) Land Form, Land use and Land ownership.
Proposed project site has already been procured by proponent and it is an open area which is presently not being used for any purposes.
PFR of Rosso Laminates LLP
Page 12 of 16
(iv) Existing Infrastructure (1) Nearest railway station: Morbi Railway station– 6.04 km in SSW direction (2) Nearest highway: NH 8A – 0.60 km in WSW direction (3) Nearest airport: Rajkot Airport – 63.16 km in South direction (4) Power: Energy/power requirement will be 250 kWh which will be procured
through Paschim Gujarat Vij Company Limited. (5) Water: Source of the water will be a borewell/Open Well . (6) Basic amenities: Good road connectivity with state and national highway.
(v) Soil classification of Morbi District The soils of Morbi district are of clayey loam to clay type. They are moderately deep to deep and vary in colour from very dark brown to very dark greyish brown and reddish brown. The EC of the soils is generally less than 1.0 mmhos/cm and cation exchange capacity is between 40 and 60 me/100 gm of soil.
(vi) Climate data from secondary source General climate of the district is sub-tropical and is characterised by three well-defined seasons, i.e. summer - from April to June, monsoon - from July to September, and winter - from October to March. Temperature
Highest temperature is 43 to 46 degree centigrade in summer and lowest temperature comes down to 7 to 15 degree in winter season.
Humidity The relative humidity are generally over 75 % in the south west monsoon. In the rest of the year the air is comparatively dry, especially in the afternoons. During the period of November to May the relative humidity varies between 40% and 50%. Wind In the south west monsoon season, the wind direction is westeraly to south westeraly. In the post monsoon/cold season, wind blow from the north-north east direction. In summer seasons the direction of the wind is mainly between north west and south west. The wind speed gradually increases from February and reaches the peak in July when the south west monsoon is most active. It again decreases from August and becomes low.
PFR of Rosso Laminates LLP
Page 13 of 16
Rainfall
More than 90% of the rainfall occurs during the monsoon. Rainfall during the winter and summer months is negligible. The average annual rainfall of the district is 489 mm and in the year 2016 it is 366 mm only which is around 75 % of the average annual rainfall.
(vii) Social Infrastructure available.
1. Hospital : Samarpan Multispeciality Hospital, Mahendranagar – 4.21 Km in South direction
2. School / college : Laxminagar Primary School, Morbi – 1.79 Km in WNW direction
2. Planning Brief
(i) Planning Concept (type of industries, facilities transportation etc) Town and Country Planning/Development authority Classification.
Proposed Project site is located on edge of State highway and closely connected to the NH
8A which is well connected to the Morbi as well Rajkot region, Where all the
infrastructural and transportation facilities are available. There are some large industries
located in nearby area.
There will be provision of labor rooms in premises for some labors and other labors will
be come from nearby areas.
(ii) Population of Morbi District
Description No.
Population Total : 9,60,329 Person
Male : 4,94,726 Person
Female: : 4,65,603 Person
Population density 481 persons per sq. km.
Population increase rate N.A
Male- Female ratio 1000 : 961
PFR of Rosso Laminates LLP
Page 14 of 16
(iii) Land use planning (breakup along with green belt etc).
Sr. No.
Particular Area (m2)
1 Built Up Area 5865 2 Green belt area 4807 3 Open/ Road area 3897
Total 14569
(iv) Assessment of Infrastructure Demand (Physical & Social). Surrounded villages in 10 km area from the project site are having all the necessary physical and social infrastructure facilities due to agricultural activities, animal husbandry and industrial development within the area as well the nearby Morbi Town and Wankaner Town & Rajkot City.
(V) Amenities/Facilities. Surrounded villages in 10 km area from the project site are having all the necessary physical and social infrastructure facilities due to agricultural activities, animal husbandry and industrial development within the area as well nearby Morbi. 3. Proposed Infrastructure
a. Industrial Area Industry will provide 5865 m2 built up area for industrial process/manufacturing activity which provides all needed facility including proper ventilation, safe handling system, etc.
b. Residential Area Industry will provide labor quarter for their labors and provide all basic facilities to them.
c. Green Belt. 4807 m2 area will be proposed for greenbelt development. In addition to this, project proponent will participate in greenbelt development programs in nearby areas under their CSR.
PFR of Rosso Laminates LLP
Page 15 of 16
d. Social Infrastructure The Project proponent Industry will contribute annually 2.5% of total profit towards CSR (Corporate Social Responsibility) activity like following in nearby villages; • Education Facilities:- Facilities for village schools like game kits, drawing kits,
table-chairs; school construction (classroom/toilet/school boundary), ceiling fans/ coolers or books for school library
• Health Facilities:-to provide assistance to existing health facilities in Nearest Hospital, for improvement in health facilities or services.
e. Connectivity (Traffic and Transportation Road / Rail / Metro / Water ways)
Proposed project site is located adjacent to National Highway 8A and well connected to the internal roads and highways. The site is well connected to Rajkot City.
f. Drinking Water Management In proposed project, out of 17.55 kl/day water approx. 0.45 kl/day water will be consumed for domestic purpose
g. Sewerage System.
Domestic wastewater 0.4 kl/day will be disposed in to soak pit through septic tank.
h. Industrial Wastewater Management. Details of ETP is shown in Annexure – 7 of Form-1.
i. Solid/Hazardous Waste Management Details of solid / hazardous waste is shown in Annexure – 5 of Form -1.
j. Power Requirement & Supply / source Power requirement for the proposed project will be approx. 250 kWh which will be obtained from PGVCL.
4. Rehabilitation and Resettlement (R & R) Plan
Not applicable.
PFR of Rosso Laminates LLP
Page 16 of 16
5. Project Schedule & Cost Estimates
(i) Likely date of start of construction and likely date of completion
(Time schedule for the project to be given)
Construction work related to Resin manufacturing plant will be only started after obtaining EC.
(ii) Estimated project cost along with analysis in terms of economic viability of the
project. • Total cost of the Resin project is approx. 85 Lakhs.
------------------------------