Peyton Slough Remediation Project
Managing for Changing Tides:
Restoring a Tidal Marsh in an
Urbanized
October 30, 2014
![Page 2: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/2.jpg)
Presentation Contents
• Constraints and
Complications – Existing Infrastructure
– Flooding
– Wildlife Needs
– Permit Requirements
– Tides
– Rainfall/snow melt
– Discharges/Runoff
– Water Quality-Algae, DO
– Invasive Plants
– Neighboring Projects
– Marsh Settlement
• Adaptive Management
Activities – Changing Gate
– Regrading
– Planting
– Erosion Protection
– Power repair
– Subsidence Fill
– Build up levee road
– Water level readings
![Page 3: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/3.jpg)
BACKGROUND
![Page 4: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/4.jpg)
Peyton Slough Site Contamination Addressed by Remediation
• Elevated Copper and Zinc in
Slough Sediments
• Periodic Dredging
– Side-cast piles
– Contaminants also occur on Marsh
Plain
• Prevent Re-contamination
![Page 5: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/5.jpg)
Remediation – A Step-Wise Process
1. Excavate new
slough using an
already existing
drainage
2. Remove Side-
Case Dredge
Piles 3. Cap Old Slough
4. Restore Disturbed
Areas
![Page 6: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/6.jpg)
CONSTRAINTS AND
COMPLICATIONS
![Page 7: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/7.jpg)
July 25, 2013
Regulatory Requirement – Grow Pickleweed
![Page 8: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/8.jpg)
Growing Pickleweed
May 2006
Pickleweed has elevation tolerance within 0.4 ft of MHHW,
overlapping with several species
![Page 9: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/9.jpg)
Factors influencing water level: Elevation
South Marsh/McNabney are lower elevation than North Marsh
Factors influencing water level: Elevation
HOWL
MSL •
7
65
6
5.5
5
4-5
= constructed marsh plain =undisturbed marsh plain
p,_,,·ton Milrslr ' "/\'orlh
Tide gate
![Page 10: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/10.jpg)
Flooding
Railroad
(Culvert)
Subsided Road over
Historic Slough
Taco Truck
Pipelines
Nests
![Page 11: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/11.jpg)
Discharges
• Watershed Runoff
• MVSD Discharges
• Shell Stormwater
• I-680 Runoff
• CCC Martinez Reservoir Discharges
![Page 12: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/12.jpg)
Railroad Car Bridge Restriction Railroad Car Bridge Restriction
![Page 13: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/13.jpg)
Algae
![Page 14: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/14.jpg)
ADAPTIVE MANAGEMENT
![Page 15: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/15.jpg)
Lots of Monitoring (and Modeling) ~bets ef MeRiteFiA§ (aA8 MedeliA§)~
"' °' ..., ro
CJ
°' "C ·-I-c °' Q.
0
'*'
--TG1Posit ion --TG2Posit ion --TG3Posit ion
------------ Pred icted at Port Ch icago NGVD - -waterfront road shou lder __._ Kelly's observation- East Channe l
- Peyton McNabney- NGVD? - East channel- NGVD --Tide gate NGVD 80 +-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-!
- - waterfront road center - - south spread area
i ! I, ; ~ ! : ~ ! I ~ ~ : : 70 +-~~--+-++-,_._.-+-~~-'-'-,___,_._~~-;.-<~++-<~-+-....._..,..._.___,_....~-+++-i-+++-H'~~__,......_......_+->_._,_...----<......_.-+---._.._..__,__-+-1---+-+-+4< ........ _., m4-l-I~~
60
so
40
30
20
6
4
2
0
-2
-4
-6
-
-QJ > QJ -... QJ ..., nJ
~ ........ -QJ ..., nJ b.O QJ
""C ·,;:; ..., nJ -c l!> > z
![Page 16: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/16.jpg)
Adaptive Management
• Replacing tide gate
• Regrading
• Supplemental
Planting
• Headcut Repairs
• Bulkhead Repair
Sept. 21, 2010
2014
![Page 17: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/17.jpg)
Change in Tide Gate Management Change in Tide Gate Management
90
80
70
60
50 c: QI Q. 0 -c: 40 QI CJ ~ QI
Q.. 30
20
10
0 1/26
-10
2013 Tide Gate Activity - Tide Gate Position - UpStreamlevel
6
5~ u. .5 :0-QI
4~ :9 iii CJ -0 .s
3 ~ iii > QI
> ~
2 (ij 0:::
1
0132/15/2013 317/2013 3/27/20134/16/2013 5/6/2013 5/26/20136/15/2013 7/5/2013 7/25/20138/14 013
Date
![Page 18: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/18.jpg)
Bulkhead Erosion Repairs
Bulkhead erosion repair (3/07)
• Rock bags at bulkhead
perimeter
• Emergent plant log rolls (200
LF) and clumps
• Redirect drainage, 60 LF ditch
Standing in eroded drainage
![Page 19: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/19.jpg)
Stakeholder Involvement Stakeholder Involvement
• TESORO
SOLVAY
PL ALL A~1£RICAN PIPELI E
![Page 20: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/20.jpg)
Managing a Marsh in 10 (Not So Easy) Steps
1. Follow the Tides
2. Know Your Marsh Plain Elevation
3. Monitor Water Levels
4. Make Friends with Your Neighbors
5. Build the Appropriate Gate Structure
6. Consider Circulation
7. Know the Dischargers Upstream
8. Monitor the Plants and Wildlife
9. Be Adaptable
10. Never Stop Learning
![Page 21: Peyton Slough Remediation Project - Californiascienceconf2014.deltacouncil.ca.gov/sites/default/files/...2014/10/30 · Peyton Slough Remediation Project Managing for Changing Tides:](https://reader033.vdocuments.mx/reader033/viewer/2022053011/5f0ee5077e708231d4417648/html5/thumbnails/21.jpg)