petrobras oim presentation rev tt nov 2010 vsersion

42
TRELLEBORG MARINE SYSTEMS OFFSHORE INTEGRATED MOORING PRESENTATION

Upload: tomtoth

Post on 05-Dec-2014

868 views

Category:

Business


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG MARINE SYSTEMSOFFSHORE INTEGRATED MOORING PRESENTATION

Page 2: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

TRELLEBORG AB – Corporate Overview

2

Sales by Region

Asia

Total sales ~ US$ 3.5 Billion*

Employing ~ 20,000 people*

Present in 40 countries worldwide

Manufacturing in ~100 plants

Globally, among largest non-tire rubber players

* Incl recent acquisitions, proforma

Europe

Americas

Page 3: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Our Trelleborg Marine Systems offices are located at Sao Paulo & Rio de Janeiro

Trelleborg Offshore (a different business unit) have gained vendor qualification with Petrobras for their range of subsea equipment.

3

Page 4: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

TRELLEBORG AB – Business Areas

4

Trelleborg Sealing Solutions

Trelleborg Automotive

Trelleborg Engineered

Systems

Trelleborg Wheel Systems

Trelleborg MarineSystems

(Business Unit)

Trelleborg Marine Systems –Mooring, Trellex, Fentek, Seaward

Page 5: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

5

OFFSHORE INTEGRATED MOORING

Company History

Formerly called Harbour Marine Engineering established in 1972

Acquired by Trelleborg in 2006 name changed to Trelleborg Marine Systems

Focus on design & manufacture of mooring monitoring & berthing systems for fixed as well as floating terminals.

Page 6: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

HISTORY – SUPPLY TO PETROBRAS FACILITIES

Offshore: TUPI FPSO – TANDEM MOORING SYSTEMSupplied to BW Offshore

CASCADE &CHINOOK FPSO - TANDEM MOORING SYSTEMSupplied to BW Offshore

JUBARTE FPSO P57 – TANDEM MOORING (QRH)

Supplied to SBM Inc.

6

Page 7: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

HISTORY – SUPPLY TO PETROBRAS

Onshore Terminals

BR Salvador Terminal

Scope of Supply : Complete mooring load monitoring & remote release systems.

Supplied via representatives Laser Tech Brazil (Formerly GHF)

Guanabarra NG & Pecem LNG Terminals

Scope of Supply : Complete mooring load monitoring & remote release systems.

Supplied via representatives Laser Tech Brazil (Formerly GHF)

7

Page 8: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

OUR KEY STRENGTHS

In-house mechanical and instrumentation design capabilities to provide standard as well as custom mooring, berthing and offloading solutions.

ISO 9001 & ISO 14001 with Lloyds Register Accreditations Over 60 FPSO ship sets of tandem mooring equipment supplied since 1980 Largest supplier of integrated mooring berthing systems for on shore LNG

facilities First to develop the integrated STS solution now installed on the first of the

FSRU vessels such as Golar Freeze & Golar Frost. Dedicated in house Maintenance & Services Group offering routine contract

and break down maintenance services worldwide.

8

Page 9: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

9 October 2, 2008

PRESENTATION FOCUS

Ship to Ship Integrated Mooring & Berthing

Transfer of crude FPSO & LNG for FSRU applications

Tandem Mooring & Offloading

Conventional stern Tandem Offloading for FPSO

Mooring Systems with integrated Hose & Reel package

Spread Mooring

Shallow water, long chain, multi leg mooring systems for FPSO

OFFSHORE APPLICATIONS

Page 10: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Ship to Ship Mooring

for Oil & Gas Transfer

10

Page 11: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

SHIP TO SHIP MOORING & BERTHING•QRH with capstan, load monitoring and high security remote release systems

•RTK GPS Approach & Berthing

• Portable Workstations - Carry On Board

•Environmental - Met Ocean

•Fenders & deployment systems

•Fairleads & Chocks

•Rope reelers augmentation to LNGC mooring

• Class Approval DNV, ABS, RINA & Lloyds

11

Page 12: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS - GOLAR FREEZE & GOLAR FROST

12

Golar Freeze for Dubai LNG

Golar Frost for Livorno LNG

Golar Khannur West Java LNG

FSRU of 287m long volume 125,000 cubic meters of LNG• STS Quick Release Hooks• Load Monitoring • Remote Release• RTK Berthing Aid• RINA Class Approval – FSRU Frost• DNV Class Approval - FSRU

Freeze

Page 13: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS - TI AFRICA & TI ASIA

13

ULCC largest double hulled vessels of 380m long 440,000 DWT

• STS Quick Release Hooks• Load Monitoring • Remote Release• RTK Berthing Aid• Fender Deployment System• Tandem Mooring• Lloyds Register Class

approval

TI AFRICA

TI ASIA

Page 14: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS Mooring Hooks during commissioning 2009

14

Commissioning – Ti Africa Golar Freeze

Page 15: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Instrumentation & Integration

15

Page 16: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

INTEGRATED CCR SERVER & WORKSTATIONS

•Mooring line tension display

•Mooring set up & alarm level configuration

•Mooring tension warnings

•Approach & Berthing speed, distance & position display

•Met Ocean Wind Wave Current

•Telemetry Communications of Mooring, Berthing & Met Ocean to Secondary Vessel

•Integrated Data Logging

16

Page 17: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

17

Integration concept for STS originated from onshore LNG mooring & berthing

Page 18: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Berthing & Approach Systems

18

Page 19: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

GPS Based Technology

Satellite Navigation Systems - DGPS & RTK technology

• Monitors the relative closing speed & distance between two vessels for STS or Tandem Mooring applications.

•Provides Primary & Secondary vessels with berthing data with integrated feed from Met Ocean sensors.

•Primary vessel fitted with the fixed system. Secondary vessel is supplied with the portable carry on board unit.

19

Bridge Unit STS or tandem

Navigation Berthing

Page 20: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

20

Information can be displayed over a wireless network or telemetry between vessels to:

• Carry On Board Workstations

• Fixed workstations integrated with load monitoring emergency release & ship to

• Large Main Display Board installed on board the Primary vessel i.e. FSRU or FPSO

Page 21: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Tandem Mooring & Offloading Systems

21

Page 22: Petrobras oim presentation  rev tt nov 2010 vsersion

22

TANDEM MOORING SOLUTIONS

Shuttle tanker Tandem Mooring Winches

With Emergency Quick Release Mooring to full load

Load Monitoring Local & CCR with Load History recording

GPS approach monitoring

Load alarm options deck or CCR load alarm stations

Page 23: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

23

FPSO TANDEM MOORING

Hawser hook with load monitoring and remote release Hawser reeler (vertical or horizontal) with hawser Trelleborg hose and hose reeler Certified by classification society (i.e.. DNV, ABS, Rina, Lloyds)

Page 24: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

24

Quick Release Hawser Hooks

• Class Certified

• OCIMF compliant

• SWL 250t or 400t

Page 25: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

25

Page 26: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

26

I have called it the “LIMP- D- HOOK” or LDH.

Page 27: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

27

Page 28: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

21inch 150m integral buoyancy hawser with 76mm dia. chafe chains

400t Quick Release

Load Monitoring Remote Release

28

Vertical Tandem Mooring Winch – Tupi FPSO

Page 29: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

29

Page 30: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Offloading Hose

& Hose Reel Systems

30

Page 31: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Trelleborg Offloading Hoses

31

• Dual & Double carcass manufactured by Trelleborg

• API 17K certified

• Unique flexibility & recess flange design allows for a compact reeler drum.

Page 32: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

32

IMO & OCIMF compliant design

Stores up to 340m of 20inch hose

Capacity 35t pull

Spooling system & fairlead to reduce abrasion to hose

Page 33: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Spread Mooring

33

Page 34: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

34

Bow Spread Mooring

Page 35: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Spread Mooring Equipment List

Chain stoppers Dual Pawl Type or Quick Release to suit chain up to 127 mm diameter with optional :

Load Monitoring System Load Alarm Stations Local and remote display at CCR

Chain Tensioners - Using winch or jack Hazardous Area Compliant Class Approved Fixed or transferable within a stopper group.

Chain Fairleads & Chutes Fixed & Sheave type, Swivelling above & below water configurations Chain to 127mm

35

Page 36: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Q

36

10 Point Spread Mooring

Chain - 1200 metres 105mm U3

Load Monitoring to 800t

Releasable 0 to 600t

MBL > 1200t

Chain Size 89mm

Load Monitoring to 250t

Releasable 0 to 250t

MBL > 580t

Page 37: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

DUAL PAWL TYPE CHAIN STOPPERS 76 - 120mm Chains

37

Page 38: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

38

Fenders – Pneumatic or Foam

Fender Deployment Systems

for STS

Page 39: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

FENDER DEPLOYMENT - DAVITS

Fender deployment davits are designed to store the fender either on deck or outboard over the side of the vessel.

•Hydraulic or Electric operation

•Lift capacity to 15t

•API or IEC design

•High dynamic FOS for open sea deployment applications such as FLNG

39

6 Fender Deployment FPSO - Ti Africa ULCC

Out board fender storage proposed for Livorno FLNG

Page 40: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

FENDERS – PNEUMATIC & FOAM

40

Pneumatic Fenders• Up to 4.5m diameter & 12 m long• Complete with Tyre & Chain net• Rigging in chain, wire or synthetic rope

Foam Fenders • Up to 3.8m diameter & 6 m Long• Do not require Chain net• Virtually unsinkable• Closed cell foam & 28mm polyurethane

skin

Page 41: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

41

CommissioningTraining Maintenance

Page 42: Petrobras oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

42

www.trelleborg.com

Questions?