Peter Spiller, DIRAC Kick-off meeting
Peter Spiller
Design Study Group
DIRAC kick-off meeting
13.4.2005
SIS100
Peter Spiller, DIRAC Kick-off meeting
SIS100 in FAIR
Peter Spiller, DIRAC Kick-off meeting
SIS 100 Project Overview
Accel. TDR (all device developments finished)
Device TRs
R&D phase Construction phase
Importance of the year 2008 !
Demonstration of the U28+ operation in SIS18 bevor series production of SIS100
Peter Spiller, DIRAC Kick-off meeting
TR Estimates - R&D Phase SIS100
TotalInvestments[M€]
Est.Personnel Involvement[FTE
Est.Personnel Involvement[M€]
Investment/Personnel[M€/FTE]
Investment+ Personnel[M€]
EUTotal expected[M€]
EURequestedBudget[M€]
System Planning 0.682 0.252
Magnets 3.405 - - 3.405 + x 1.7 0.733
Power Supplies 0.04 5.8 0.487 0.007 0.527
RF Systems 4.488 44.7 3.755 0.1 8.243 1.26 0.63
Injection/Extraction 0.37 3.5 0.294 0.1 0.664
Beam Diagnostics 3.26 42.7 3.586 0.076 6.846 1.141 0.272
Vacuum System 3.05 50.8 4.267 0.06 7.317 0.697 0.191
Insertions 0.05 10.2 0.857 0.005 0.907
Cryogenics 0.595 32 2.688 0.018 3.283
Safety and Machine Protection
0.075 4.5 0.378 0.017 0.453
Total 15.333 194 16.3 0.048 31.3 5.48 2.078
Peter Spiller, DIRAC Kick-off meeting
UHV:
ERDA Measurements
GSI, TU Darmstadt, LMU
Rf1:
Longitudinal feed back system
GSI, CERN
Rf2:
Fast high power switches for rf gaps
GSI, CERN
System Design:
High current beam dynamics studies
GSI, TU Darmstadt, LBNL, BNL, Uni Bologna
Beam Diagnostics:
Digital signal analysis electronics for BPMs
GSI, CERN, TU Darnstadt, Company Itech, FZJ
Magnets:
Fast ramped super conducting magnets
GSI, Company BNN, JINR, Company ACCEL
SIS100 : Subtasks and Participants
Peter Spiller, DIRAC Kick-off meeting
Pb55+
Pb54+X
loss≈ 104-105 !!!
loss109 Pb54+ (4.2 MeV/u)
Pb53+
stripping losses (U28+ :SIS100)
capture losses (dominate in SIS18/LEAR)
pressure bumps
Pb54+
beam loss induced desorption yield:
stripping
capture
Dipole magnet
<1o
ERDA - Advanced Materials and Coatings
R&D goal :
Materials for Accelerator Components and Structures e.g. Collimators, with Low Desorption Coefficient
Beam Losses caused by vacuum instability
Peter Spiller, DIRAC Kick-off meeting
Rf Gap Switch – Minimization of Cavity Impedances
R&D goal :
Development of a high power Rf gap switch for inductivily loaded cavities with a low impedance, for high image currents
SIS100 Rf Systems:
Number of Acceleration Cavities : 30 + 15
Number of Bunch Compression Cavities : 25
Preliminary parameters of a semi-conductor rf gap switch
switching time 1 s
max applied voltage 20 kV
max current 50 A
impedance 5 W
Only the Rf system required is visible for the beam
Options : MOSFET, IGBT, High Tc Superconducter
Peter Spiller, DIRAC Kick-off meeting
Damping of coupled bunch oscillations induced by unwanted higher order modes. Longitudinal feedback system consists of a dedicated RF kicker, which applies an energy correction, an electromagnetic kick, to a passing bunch. Damping of longitudinal oscillations around the synchrotron phase. To damp all the dipole mode oscillations, the kick force must change it‘s phase from a passing bunch to the next bunch. Thus half the bunch frequency is nessesary for the bandwidth of a longitudinal feedback kicker. Complex interaction during high current operation with broad band MA loaded cavity impedance
Longitudinal Feed Back System
R&D Goal :
Prototype longitudinal feedback system for damping of higher order mode bunch oscillations
Peter Spiller, DIRAC Kick-off meeting
High Current Beam Dynamics
Transverse Beam Dynamics : Nonlinear Lattice Properties
under Space Charge Influence
Collective Instabilities and Impedances : Definition of Impedance Budget
(„Impedance Acceptance“)
Analysis and Optimization of Device Impedances
Longitudinal Beam Dynamics : Simulation of high intensity beams including interaction
with realistic properties (e.g. impedance) of Rf systems
Definition of optimized Rf manipulations for single bunch
generation and compression
Franchetti et.al
Peter Spiller, DIRAC Kick-off meeting
Digital Signal Analysis Electronics for BPMs
Transition from analoge (different dedicated systems) to a digital (single), fully programmable BPM electronics for e.g.
a) high resolution beam position measurement (large beam fill factor) on the ms scale and
b) broad-band, turn-by-turn position measurement
Tests of the new electronics hardware in CERN PS
R&D goal :
4-channel 250 MS/s 12Bit analogue board with sufficient memory and a set of high performance algorithms implemented on the digital board
Peter Spiller, DIRAC Kick-off meeting
Fast Ramped Superconducting Magnets
Nuclotron Cable Nuclotron Dipole in Cryostat
Reduction of AC losses during ramping by improved iron yoke design 40 W/m > 13 W/m Bmax= 2 T, dB/dt= 4T/s, f= 1 Hz
Window frame magnet with superconducting coil
R&D goal: Mechanical and Structural R&D – New Coil Layout – Prototypes for Dipoles and Quadrupoles