pete wood, pe dnr southeast region 262.884.2360 [email protected]
TRANSCRIPT
![Page 1: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/1.jpg)
Permeable Pavement Design for Storm Water Management DNR Technical Standard 1008
Pete Wood, PEDNR Southeast [email protected]
![Page 2: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/2.jpg)
Topics
• Background• Permeable Pavement System Features• Water Quality & Quantity Control• Operation & Maintenance
![Page 3: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/3.jpg)
DNR Post-Construction Technical Standards
![Page 4: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/4.jpg)
Permeable Pavement Technical Standard Development Team
Roger Bannerman, DNR/USGSLaura Fenley, DOTBob Givens, OMNNI AssociatesKate Gleason, DNRJosh Harder, Dane County LCDChris Homburg, Homburg ContractorsGini Knight, SOCJason Kruger, WI Ready Mixed Concrete AssociationDavid Liebl, UW ExtensionMary Anne Lowndes, DNRJohn McCarthy, Graef USATom Price, Conservation Design ForumMichelle Reynolds, DOTBob Roehrig, County Materials CorporationScot Schwandt, WI Asphalt Pavement AssociationTim Troester, City of MadisonPete Wood, DNR
![Page 5: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/5.jpg)
Permeable Pavement - Definition
A pavement system designed to achieve water quality and quantity benefits by allowing movement of stormwater through the pavement surface and into a base/subbase reservoir. Examples include pervious concrete (cast-in-place or precast), porous asphalt and permeable pavers/blocks.
![Page 6: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/6.jpg)
Permeable Pavement - Conditions Where Practice Applies
• Alternative to other pavements and storm water control measures (Run-on?)
• Most effective in areas where soil and groundwater conditions are suitable for storm water infiltration (Infiltration pre-treatment?)
• May be used in areas where infiltration is prohibited or limited when liners and/or underdrains are installed (Filtration-Sedimentation-Adsorption?)
![Page 7: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/7.jpg)
Permeable Pavement System
Permeable
Pavement SurfaceRun-on Source Area
Aggregate Storage Reservoir
Underdrain
Soil Subgrade
![Page 8: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/8.jpg)
Permeable Pavement SystemRun-on
Run-on Source Area
• Prohibited Areas
• Impervious Areas
• Pervious Areas
• Considerations
![Page 9: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/9.jpg)
5:1 Run-on Ratio
![Page 10: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/10.jpg)
Permeable Pavement SystemSurface
Permeable
Pavement
Surface
• 100 in/hr initial
• 10 in/hr minimum
![Page 11: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/11.jpg)
![Page 12: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/12.jpg)
Permeable Pavement SystemAggregate Storage Reservoir
Aggregate Storage Reservoir
Underdrain
Soil Subgrade
• Aggregate• Infiltration• Underdrains• Construction
![Page 13: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/13.jpg)
Permeable Pavement SystemTSS & TP Removal (Madison Study)
Permeable
Pavement
Surface
Run-on Source Area
Aggregate Storage Reservoir
Underdrain
Soil Subgrade
0%
55% TSS
100%
35% TP
![Page 14: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/14.jpg)
![Page 15: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/15.jpg)
Operation & Maintenance
• Minimum surface cleaning frequency of twice per year using industry recommended method
• Annual inspection of surface and subsurface drainage
![Page 16: Pete Wood, PE DNR Southeast Region 262.884.2360 Peter.Wood@Wisconsin.gov](https://reader030.vdocuments.mx/reader030/viewer/2022032701/56649c9d5503460f9495c87f/html5/thumbnails/16.jpg)
Questions