PETAL II Extension Architecture, Integration and Testing. Prepared by Martin Adnams/Isabelle Herail. ATN R. PIIe End to End Target. Avionics. CMU ATN. AAL B767. MCDU. vdr. R. ES. Rockwell Collins. vgs. CPDLC Service VIA ATN and VDL Mode 2. ARINC VDL M2. VDL M2. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

1

PETAL II ExtensionPETAL II ExtensionArchitecture, Integration and Architecture, Integration and

TestingTesting

Prepared by Martin Adnams/Isabelle Herail

Page 2: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

2

PIIe End to End TargetPIIe End to End Target

FEP/Datalink Server

WAN

MAASTRICHT UAC Control Centre

ATNR

ATNEnd

SystemFDPS

CMUATNvdr

RPCLANLAN

VDL M2

AALB767MCDU

ATNR

vgs

R ES

ARINCVDL M2

CPDLC ServiceVIAATN and VDL Mode 2

Rockwell Collins

Avionics

Eurocontrol

Page 3: PETAL II Extension Architecture, Integration  and Testing

PIIe RegionPIIe RegionMAAS UAC

Page 4: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

4

The Players and the SystemsThe Players and the SystemsPETAL INTEGRATION TEAM (PIT)

Eurocontrol Maastricht UAC (ATN/CPDLCOPERATIONAL System)Brétigny Experimental Centre(ATN/CPDLC TEST Systems)Experimental aircraft (QinetiQ BAC1-11)

American Airlines 4 Boeing 767ER with STCDynamic Test Pilots + Frank

Rockwell Collins Avionics (CMU, VDR, MCDU)Cedar Rapids Test Facility

ARINC VDL Mode 2 and ATN routersAnnapolis Test and OPS centre

STNA REIMS ACC Shadow Mode Operations(ATN/CPDLC)

FAA Build 1 – Miami Centre

Page 5: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

5

The Best Laid Plans ….The Best Laid Plans …. Integrated Schedule - PIT Maintained Stream 1 - Test PIIe Service End to End via ATN,

Fly BAC 1-11 with Satcom against MAAS Stream 2 - Same Again, Add the new element, VDL

Mode 2 Stream 3 - Same Again, Add Production Avionics

from Rockwell-Collins Certification Flight AAL 767

Non Revenue Flights Revenue Flights

Page 6: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

6

What Really HappenedWhat Really Happened“PLANNING IS VITAL, PLANS ARE IRRELEVANT”

Oct 20011998

1st Op Flight

Rev FlightsStream 1

Stream 2Stream 3

CERTNon-Revs Europe

Sep 00

Crunched

ATN/VDL Testing

Mar 01 Jul 01May 01

TestingEffort

Page 7: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

7

ARINC ATN/VDLMay 01

A Tight ScheduleA Tight Schedule

MAAS

EECBretigny

EUROPEUSA

FAAMIAMI

ARINCAnnap.

RCCedar

g-gR

g-gR

a-gR

g-gR

g-gR

CMU+AGTS

Ongoing

AALDallas/Tulsa

VDL/AGTS

AALDallas/Tulsa

767s

AOA/AVLCFeb 01

BAC1-11CMU+VDR

Flying - 10 May

VANCMU+VDR

Tests - 02 May

DERA

STNATls

ATN/V8208 Mar 01

g-gR

ARINC-Euro, ATN interop Mar 01CERT FLIGHT

end MAY 01Pre-CERT Tests

through April

Application Tests

no VDL - Dec 00

Non Rev - 26 JunOPS - 27 JulREV - 20 Aug

AAL767s

Page 8: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

8

What is Left To DoWhat is Left To Do Detailed analysis of logs/traces from 20+ hours BAC1-11

flights and 21 AAL Non-REV flights out of CDG Lessons Learned will be documented

– Network Tuning is essential Those that affect standards will be injected into

AEEC/ICAO/RTCA There are Technical Issues to resolve

– Unexpected NOCOMM (coverage/handoff)– Performance optimisation

Resolution is NOT in the scope of PIIe

Page 9: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

9

What Was AchievedWhat Was Achieved

An Integrated Operational System with MAASTRICHT UAC supporting AAL Commercial Flights

A Major Milestone in Datalink made possible by dedicated teams in American Airlines, Rockwell-Collins, ARINC, STNA, Eurocontrol Maastricht and Eurocontrol Brétigny

Page 10: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

10

Isabelle HerailIsabelle HerailEEC BrétignyEEC Brétigny

Page 11: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

11

EEC Integration RoleEEC Integration RoleSTREAM 1

PSF/MADAP over AMSS

RC CMU/Ground ES

END to END over X.25

Europe/ARINC USA

VDL M2

Network Intercon. Dallas flights Certification

RC CMU/Ground ES

END to END over VDL M2

VDL M2 in Europe

Bac 1-11/AAL 767 flights

EEC ATN LAB

Page 12: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

12

Petal IIe End to End - Stream 1Petal IIe End to End - Stream 1

FEP/Datalink Server

adsu

Maastricht UAC Control Centre

g-gR

ATNES

FDPS

DLT/HMIPSFTESTAR/TTS

RPCLANLAN

ATC

Avionics

Arinc 429

BAC 1-11

WAN

ges

AMSS

a-gR

AMSS g-gNetwork

FMS

ATC

CPDLC ServiceVIA

ATN and AMSS

Eurocontrol

Page 13: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

13

GBISProATN

GESProATN

MADAP

P2FEP

Maastricht UAC

GBISProATN

GESCHARME

HMI

Test . Appli.

STNA Toulouse

GES Aussaguel

Inmarsat

Stream1/End To End TestingStream1/End To End Testing

TESTAR/TTS

DLT

PSF

DERA BAC 1-11

CMU Simulator

Collins Cedar/Rapids

SITA X.25 WAN

A/GBISProATN

Ground

TESTAR-TTS

PETAL/FITAMS

EEC BretignyTESTAR-TTS

DLT

PSF

Air

Page 14: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

14

Air side Service TestingAir side Service Testing

End to End Service Tests Rockwell Collins CMU/EEC Petal Ground Test Tool :Nov 00

End to End Service Tests Rockwell Collins CMU/UAC Maastricht MADAP: Dec 00

End to End Service Level Tests Rockwell Collins CMU/STNA application : March 01

Page 15: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

15

Europe/US VDL M2 LinkEurope/US VDL M2 LinkARINC Lab, Annapolis UAC Maastricht

EEC, Bretigny

BTAPN

SITA

R

R

R

Other UAC ATN

systems

Other EEC ATN

systems

GG BisPROATN

TRANSPAC

GG BisPROATN

GG1 Bis

GG2 Bis

Tunnel Adjacencies

Page 16: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

16

EEC Test Tools EEC Test Tools to support Flight Trialsto support Flight Trials

New Tool capability integrated in the EEC Petal Ground Test Tool : – Generation of short and long CPDLC

messages with automatic response from the air side

Objectives:– Tuning of ATN TP4 parameters– Evaluation of Airborne side performances

Page 17: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

17

Support to CERT - Dallas flightsSupport to CERT - Dallas flights Production Rockwell Collins CMU End to End Testing:

– grounded AAL 767s in Dallas– flight trials Dallas/Tulsa – against EEC and UAC Maastricht : End March/April 01

Prep Cert flights Dallas/Tulsa with EEC and UAC Maastricht : End April/May 01

Certification Flight : 29th May 01

Page 18: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

18

European ArchitectureEuropean Architecture

AGR

GGBis

GGBis

Cisco

ARINCNetwork

UAC/Maastricht

STNA/Toulouse

X25switch

GG BisPROATN

GG BisPROATN

X25switch

GroundTestTools

TAR/TTSTES

EEC/Bretigny

PIIe Opconnect

GG BisPROATN

P2FEPPROATNES

x25

x25

x25

CharmeES

DL Server

X25switchAGR

FDPS

Page 19: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

19

Validating ATN/VDL M2 in EuropeValidating ATN/VDL M2 in Europe CMU/MCDU and VDR “palette mounted” in DERA Van for

VDL Checkout - May 01 20 hours flight with CMU/MCDU and VDR Installed on

BAC1-11 - From June 01 until start August 01 CPDLC exercised against EEC test tools plus

automatic traffic generation Collecting output information from air and ground

sides for post analysis: – VGS Hand-off’s ! VGS Coverage boundaries ! VGS

Coverage overlap !– Air side performances

DERA

Page 20: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

20

NON-Revenues flightsNON-Revenues flights Four AAL 767s Rockwell Collins CMU equipped

at CDG 21 flights from start of July until mid of August

01 CPDLC exercised against EEC test tools and

UAC Maastricht. Automatic traffic generation for post analysis of air and ground registered traces

CPDLC Op. UAC Maastricht and STNA (shadow mode) with external CPDLC transfers exercised between both

Page 21: PETAL II Extension Architecture, Integration  and Testing

ATN 2001, London - 18 Sep 01

21

ATN Progress !ATN Progress ! Successful Non-Revenues flights continued by

US/Europe Revenues flights with UAC Maastricht CPDLC exchanges in inbound/outbound VDL M2 coverage

MAJOR progress in implementation of Air/Ground Datalink thanks to real good co-ordination and motivation between all partners teams