petal-ii eatmp petal-ii ops results slide 1 atn 2001 - 18 th sep 2001 atn 2001 18 th september 2001...

42
PETAL- II E A T M P PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew Viewpoint Martin McHUGH EUROCONTROL, DIS/ATD

Upload: cara-hollingshed

Post on 30-Mar-2015

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 1 ATN 2001 - 18th Sep 2001

ATN 2001 18th September 2001

PETAL-II Operational ResultsThe Controller and Aircrew Viewpoint

Martin McHUGH EUROCONTROL,

DIS/ATD

Page 2: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 2 ATN 2001 - 18th Sep 2001

Activity: CPDLC Flights May 1998 – August 2001Activity: CPDLC Flights May 1998 – August 2001

020406080

100120140160180200220240260280300320340360380400420440460480500

ATN

NEAN

FANS-1/A

Page 3: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 3 ATN 2001 - 18th Sep 2001

TOTAL CPDLC Flights

ATN: 3FANS-1/A: 6690NEAN: 1762

TOTAL: 8455

Represents less than 1% of Maastricht Movements

Activity: CPDLC Flights May 1998 – August 2001Activity: CPDLC Flights May 1998 – August 2001

Page 4: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 4 ATN 2001 - 18th Sep 2001

3113FLIGHT CREWS

NEAN

4158 FLIGHT CREWS

FANS1/A

65152CONTROLLERS

No. of Interviews Conducted

No. of Questionnaires Completed

Feedback: To 31st August 2001Feedback: To 31st August 2001

Page 5: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 5 ATN 2001 - 18th Sep 2001

Feedback: To 31st August 2001Feedback: To 31st August 2001

Questionnaires Pertinent to users’ last experience of Datalink only, System failures or ‘sluggish’ dialogues usually result in “Not

Useful” response. May consider datalink as “Useful” one day, “Not Useful” the

next.

Interviews Record users’ overall experience with datalink. Many “Not Useful” responses are qualified; eg. “With the

current HMI”, “With the limited number of aircraft participating” etc.

Page 6: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 6 ATN 2001 - 18th Sep 2001

FLIGHT CREWS

NEAN

FLIGHT CREWS

FANS1/A

43†(77%)CONTROLLERS

Datalink Useful

Datalink Not Useful

No Impact More Experience

7†(13%) 3†(5%) 3†(5%)

90*(61%)

36*(86%)

15*(10%) 19*(13%) 23*(16%)

1*(2%) 3*(7%) 2*(5%)

Feedback: To 31st August 2001Feedback: To 31st August 2001

† Information extracted from Interviews only

* Information extracted mainly from Questionnaires

Page 7: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 7 ATN 2001 - 18th Sep 2001

Controller Response: Value of MessagesController Response: Value of Messages

122

110

57

102

47

60

21

34

15

46

56

-9

-35

-8

-18

-12

-33

-22

-12

-29

-4

-3

-50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

Considered Useful

Considered Not Useful

Transfer of Voice Comms

Flight Level Clearance

Flight Level Request

Route Clearance

Route Request

Heading Clearance

Vertical Rate Clearance

Speed Clearance

‘Time’ Clearance

ATC Mic Check

SSR Clearance

Page 8: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 8 ATN 2001 - 18th Sep 2001

-50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170

NEAN - Considered Useful

NEAN - Considered Not Useful

FANS - Considered Useful

FANS - Considered Not Useful

Transfer of Voice Comms

Flight Level Clearance

Flight Level Request

Route Clearance

Route Request

Heading Clearance

Vertical Rate Clearance

Speed Clearance

‘Time’ Clearance

ATC Mic Check

SSR Clearance

Aircrew Response: Value of MessagesAircrew Response: Value of Messages

Page 9: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 9 ATN 2001 - 18th Sep 2001

-50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170

Transfer of Voice Comms

Flight Level Clearance

Flight Level Request

Route Clearance

Route Request

Heading Clearance

Vertical Rate Clearance

Speed Clearance

‘Time’ Clearance

ATC Mic Check

SSR Clearance

Response: Value of Messages - ComparisonResponse: Value of Messages - Comparison

-50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170

Page 10: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 10 ATN 2001 - 18th Sep 2001

18

94

143

197

371

1155

4268

4689

6906

32

122

197

202

601

1568

947

5754

473

6229

9353

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Uplink/Downlink Used

Operational Response Received

Transfer of Voice Comms [uM117]

Flight Level Clearance [uM19, 2023, 26, 27, 28, 29, 148]

Flight Level Request [dM6, 9, 10]

Route Clearance [uM64, 74, 82]

Route Request [dM22, 27]

Heading Clearance [uM94, 96, 190,215]

SSR Clearance [uM123, 179]

ATC Mic Check [uM157]

Speed Clearance [uM55, 106, 107,108, 109, 116, 222]Vertical Rate Clearance [uM171,172, 173, 174]

‘Time’ Clearance [uM51, 52, 53, 54]

Feedback: Actual usage of Messages to 31 Aug 01Feedback: Actual usage of Messages to 31 Aug 01

Page 11: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 11 ATN 2001 - 18th Sep 2001

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Transfer of Voice Comms [uM117]

Flight Level Clearance [uM19, 2023, 26, 27, 28, 29, 148]

Flight Level Request [dM6, 9, 10]

Route Clearance [uM64, 74, 82]

Route Request [dM22, 27]

Heading Clearance [uM94, 96, 190,215]

SSR Clearance [uM123, 179]

ATC Mic Check [uM157]

Speed Clearance [uM55, 106, 107,108, 109, 116, 222]Vertical Rate Clearance [uM171,172, 173, 174]

‘Time’ Clearance [uM51, 52, 53, 54]

Feedback: Comparison – Actual usage / ValueFeedback: Comparison – Actual usage / Value

Uplink/Downlink Used

Message Useful - Aircrew

Message Useful - Controllers

Page 12: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 12 ATN 2001 - 18th Sep 2001

38

0

277

4

1284

0

873

2141

3517

32

122

197

202

601

1568

5754

6229

9353

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

PETAL

Oceanic

Transfer of Voice Comms [uM117]

Flight Level Clearance [uM19, 2023, 26, 27, 28, 29, 148]

Route Clearance [uM64, 74, 82]

Heading Clearance [uM94, 96, 190,215]

SSR Clearance [uM123, 179]

ATC Mic Check [uM157]

Speed Clearance [uM55, 106, 107,108, 109, 116, 222]

Vertical Rate Clearance [uM171,172, 173, 174]

‘Time’ Clearance [uM51, 52, 53, 54]

Feedback: Usage – Comparison with OceanicFeedback: Usage – Comparison with Oceanic

NOTE: Oceanic usage accumulated over an 18 month period

Page 13: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 13 ATN 2001 - 18th Sep 2001

Positive Aspects Datalink messages reduce instances of callsign

confusion and incorrect readbacks / need to repeat messages (eg. 8.33MHz frequency spacing)

Ability to delegate / task share routine tasks (transfers, SSR code allocations, route clearances) to Co-ordinator / Assistant.

Datalink communication has potential for task automation (eg. Automatic uplinking of new SSR codes).

Provides an alternate / additional means of air/ground communication.

Controller Response: Opinion OverallController Response: Opinion Overall

Page 14: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 14 ATN 2001 - 18th Sep 2001

Negative Aspects System reliability needs to be improved.

Error message received after uplinked clearance. Message time-outs. No response from the flight deck.

Controller Response: Opinion OverallController Response: Opinion Overall

5% or Less

Controllers Perception of Approximate Datalink Failure Rate

10% 20% 30% 50%

5†(12%) 10†(24%) 10†(24%) 16†(38%) 1†(2%)

† Information extracted from Interviews only

Page 15: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 15 ATN 2001 - 18th Sep 2001

Negative Aspects System reliability needs to be improved. Speed of datalink dialogues.

Failed Dialogues (No receipt or response) Flight crew inexperience However, dialogues are completed quickly enough for

non time-critical clearances (Transfers, SSR etc)

Controller Response: Opinion OverallController Response: Opinion Overall

Quick Enough

Speed of Datalink Dialogues

112† (62%) 60†(33%) 10†(5%)

NOT Quick Enough

Not Sure

† Information extracted from Questionnaires and Interviews

Page 16: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 16 ATN 2001 - 18th Sep 2001

Negative Aspects System reliability needs to be improved. Speed of datalink dialogues. Datalink inputs are cumbersome, not instinctive and take

too long – Current HMI. For example, …………

Controller Response: Opinion OverallController Response: Opinion Overall

Page 17: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 17 ATN 2001 - 18th Sep 2001

Synthetic Dynamic Display

Executive Control Message

Touch Input Device

Flight Data Message

Controller Response: Datalink InputsController Response: Datalink Inputs

Page 18: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 18 ATN 2001 - 18th Sep 2001

SET UAL945 ANZ18 COA51 BAG221 DLH458

SCALE QFA1 ACA873 SIA26 SAS554 BAW536

RLB/CS NXT

1

4BTK

QFA1 PETAL-II SQUAWK IDENT

EXEC

“SQUAWK IDENT”

4 TID Inputs

Controller Response: Datalink InputsController Response: Datalink Inputs

Page 19: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 19 ATN 2001 - 18th Sep 2001

SET UAL945 ANZ18 COA51 BAG221 DLH458

SCALE QFA1 ACA873 SIA26 SAS554 BAW536

RLB/CS NXT

1

15BTK

QFA1 PETAL-II CROSS-POS [POSN] BTW-TME [TIME] AND-TIME [TIME]

EXEC

“CROSS [position] BETWEEN [time] AND [time]”

15 TID Inputs

Controller Response: Datalink InputsController Response: Datalink Inputs

Page 20: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 20 ATN 2001 - 18th Sep 2001

Enhanced Controller HMI for CPDLC

2

3

1

Mouse DrivenSelectable MenusOn-Screen Message Boxes

Controller Response: Datalink InputsController Response: Datalink Inputs

Controller’s attention is not drawn away from the radar display

Page 21: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 21 ATN 2001 - 18th Sep 2001

Negative Aspects Using datalink increases controller workload.

Current HMI too complex - 34 (20%) Of 69 controllers specifically questioned, 56 (81%)

considered that using datalink either decreased or had no impact on the workload of other sector team members

Controller Response: Opinion OverallController Response: Opinion Overall

Executive Controller

Controllers Workload

110†(64%) 6†(4%) 55†(32%)

Co-ordinator / Assistant

Increased Decreased No Impact

37†(39%) 5†(5%) 54†(56%)

† Information extracted from Questionnaires and Interviews

Page 22: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 22 ATN 2001 - 18th Sep 2001

Negative Aspects System reliability needs to be improved. Speed of datalink dialogues. Datalink inputs are cumbersome, not instinctive and take

too long – Current HMI. Using datalink increases controller workload. Lack of familiarity with equipment and procedures. (Less

than 1% of traffic currently handled by Maastricht UAC is datalink capable)

Controller Response: Opinion OverallController Response: Opinion Overall

Page 23: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 23 ATN 2001 - 18th Sep 2001

Positive Aspects The precise nature of datalink reduces the likelihood of

misunderstandings (eg regional dialects). Widespread acceptance (and crew experience) of

CPDLC as an air/ground communications medium. Safety benefits apparent (eg B777 HMI).

Aircrew Response: Opinion OverallAircrew Response: Opinion Overall

Page 24: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 24 ATN 2001 - 18th Sep 2001

Uplink Clearance Accepted (“Wilco” Downlinked)

Corresponding uplinked value input into appropriate end system

Aircrew Response: B777 HMI – Safety BenefitsAircrew Response: B777 HMI – Safety Benefits

Page 25: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 25 ATN 2001 - 18th Sep 2001

Negative Aspects The requirement for R/T confirmation of some* datalink

clearances offsets some benefits.* (the requirement for R/T confirmation of Transfer and SSR

clearances was removed from 9th August 2001)

Aircrew Response: Opinion OverallAircrew Response: Opinion Overall

Page 26: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 26 ATN 2001 - 18th Sep 2001

Negative Aspects The requirement for R/T confirmation of some* datalink

clearances offsets some benefits. NEAN Equipped Aircraft – An aural alert for incoming

datalink messages required.

Aircrew Response: Opinion OverallAircrew Response: Opinion Overall

Page 27: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 27 ATN 2001 - 18th Sep 2001

MMI5000

Datalink Message Received

Aircrew Response: NEAN HMI – Message AlertAircrew Response: NEAN HMI – Message Alert

Page 28: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 28 ATN 2001 - 18th Sep 2001

Negative Aspects The requirement for R/T confirmation of some* datalink

clearances offsets some benefits. NEAN Equipped Aircraft – An aural alert for incoming

datalink messages required. NEAN Equipped Aircraft – An additional HMI, or re-

positioning of existing HMI, necessary.

Aircrew Response: Opinion OverallAircrew Response: Opinion Overall

Page 29: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 29 ATN 2001 - 18th Sep 2001

DC-9 Flight Deck

MMI5000

NEAN

Aircrew Response: NEAN – Position of HMIAircrew Response: NEAN – Position of HMI

Page 30: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 30 ATN 2001 - 18th Sep 2001

B747-200 Flight DeckNEAN

Aircrew Response: NEAN – Position of HMIAircrew Response: NEAN – Position of HMI

MMI5000

Page 31: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 31 ATN 2001 - 18th Sep 2001

A330/340 Flight Deck

2119Z FROM EDYY CTL

CLB TO & MAINT FL310OPEN

*UNABLE

<OTHER

STBY*

WILCO*

ATCCOMM

FANS-A

Aircrew Response: FANS-A – Position of HMIAircrew Response: FANS-A – Position of HMI

Page 32: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 32 ATN 2001 - 18th Sep 2001

Negative Aspects The requirement for R/T confirmation of some* datalink

clearances offsets some benefits. NEAN Equipped Aircraft – An aural alert for incoming

datalink messages required. NEAN Equipped Aircraft – An additional HMI, or re-

positioning of existing HMI, necessary. FANS Equipped Aircraft – Tone of aural alerting for

incoming messages is too similar to other alerts (cabin call, SELCAL).

Aircrew Response: Opinion OverallAircrew Response: Opinion Overall

Page 33: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 33 ATN 2001 - 18th Sep 2001

User Response: SummaryUser Response: Summary

Controller ResponsePositive Aspects

1. Reduces callsign confusion and incorrect readbacks / need to repeat messages.

2. Ability to delegate / task share routine tasks.

3. Potential for task automation.

4. Provides an alternate / additional means of a/g comms.

Controller ResponseNegative Aspects

1. System reliability needs to be improved.

2. Speed of datalink dialogues.

3. Datalink inputs too cumbersome.

4. Increase in controller workload.

5. Lack of familiarity with equipment and procedures.

Page 34: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 34 ATN 2001 - 18th Sep 2001

User Response: SummaryUser Response: Summary

Aircrew ResponsePositive Aspects

1. Reduces likelihood of misunderstandings.

2. Many crews experienced in using CPDLC for a/g comms.

3. Safety benefits apparent (eg B777 HMI).

Aircrew ResponseNegative Aspects

1. Requirement for R/T confirmation offsets some benefits.

2. Aural alert for incoming datalink messages required (NEAN).

3. Additional or re-positioned HMI necessary (NEAN).

4. More distinct tone for aural alert necessary (FANS).

Page 35: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 35 ATN 2001 - 18th Sep 2001

Issues Arising: Concatenated MessagesIssues Arising: Concatenated Messages

Observation:

Although the majority of controllers and flight crews consider that the ability to combine

datalink messages to be useful, a number of important issues have been identified: Combinations leading to ambiguous or potentially

conflicting clearances should be ruled out. Combinations leading to conditional clearances (e.g.

at [position] climb to [level]) should be avoided. Airborne HMI designs should ensure that all parts of

the clearance are apparent to the aircrew.

Page 36: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 36 ATN 2001 - 18th Sep 2001

Issues Arising: Concatenated MessagesIssues Arising: Concatenated Messages

0955Z NEW CAN YOU ACCEPT FL35 . . >

ATC LOG 1 / 1

- - - - - - - - - - - - - - - - - -

<INDEX ERASE LOG>

Reading a new uplink clearance on the ATC Log page, the pilot is presented with a truncated message. This could result in an instruction …………

Page 37: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 37 ATN 2001 - 18th Sep 2001

Issues Arising: Concatenated MessagesIssues Arising: Concatenated Messages

………… being initiated before the controller intended.

STATUS

OPEN

0955z ATC UPLINK 1 / 1

<PRINT LOG>

/ CAN YOU ACCEPTFL350 AT

10N57

<STANDBY

<REJECT ACCEPT> - - - - - - - - - - - - - - - - - -

Page 38: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 38 ATN 2001 - 18th Sep 2001

Issues Arising: Concatenated MessagesIssues Arising: Concatenated Messages

Recommendations (for implementation):

1) Combining messages is a useful operational facility, and should be provided.

2) Methods of satisfying the issues identified should be included.

3) This subject should continue to be monitored until such time that the question of message concatenation is finally resolved.

Page 39: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 39 ATN 2001 - 18th Sep 2001

Issues Arising: uM72: “Resume Own Navigation"Issues Arising: uM72: “Resume Own Navigation"

Problem: 1) Flight crews view this message as ‘incomplete’ as

there is no supplementary “..to [position]” element on which to base the instruction.

Short Term Fix: 1) Use uM74: “Proceed Direct to [position]” in place of

uM72.

2) uM72 removed from Maastricht operational message set.

Page 40: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 40 ATN 2001 - 18th Sep 2001

Issues Arising: uM157 – “Check Stuck Mic [freq]”Issues Arising: uM157 – “Check Stuck Mic [freq]”

Problem:

uM157 is sent to ALL aircraft in CPDLC contact with the Centre concerned – Instruction can be misinterpreted by crews and controllers operating on other frequencies.

Eg: Some pilots have interpreted this as an instruction to contact the controller on the stated frequency.

Page 41: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 41 ATN 2001 - 18th Sep 2001

Short term Fix: 1) Flight crew and controller training and awareness.

2) uM157 to be broadcast ONLY to those aircraft under the control of the triggering sector.

Longer Term: 1) Review message phraseology.

2) Review ground system fix to filter the broadcast uplink based on the frequency used.

Issues Arising: uM157 – “Check Stuck Mic [freq]”Issues Arising: uM157 – “Check Stuck Mic [freq]”

Page 42: PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN 2001 - 18 th Sep 2001 ATN 2001 18 th September 2001 PETAL-II Operational Results The Controller and Aircrew

PETAL-IIPETAL-II EA

TM

PE

AT

MP

PETAL-II Ops Results Slide 42 ATN 2001 - 18th Sep 2001

Any Questions?

Martin McHUGH

Danny DAEMS MAASTRICHT UAC

Andy FRY AMERICAN AIRLINES

Frank CHESHIRE AMERICAN AIRLINES