Page 1: Pervious Concrete Projects in Beaverton

City of Beaverton, Oregon

Debbie MartisakPublic Works Department

id803340234 pdfMachine by Broadgun Software - a great PDF writer! - a great PDF creator! - http://www.pdfmachine.com http://www.broadgun.com

Page 2: Pervious Concrete Projects in Beaverton

City of Beaverton Projects Pervious Concrete Projects

155th Avenue Green Streets Pilot Project

Public Plaza @ Lombard / Broadway

Operations Center, Upper Yard

7th Street Utility Improvement Project

Page 3: Pervious Concrete Projects in Beaverton

Brion Barnett, PEProject Engineer

155th Avenue Green Streets Pilot Project

Page 4: Pervious Concrete Projects in Beaverton

Connect sidewalk & bike lane gap Integrate green elements into project Complete project during summer 2006

155th Avenue Green Streets Pilot Project

Page 5: Pervious Concrete Projects in Beaverton

Green Street Measures Vegetated Drainage Swale Pervious Concrete

155th Avenue Green Streets Pilot Project

Page 6: Pervious Concrete Projects in Beaverton

Pervious Concrete Sidewalk

155th Avenue Green Streets Pilot Project

Page 7: Pervious Concrete Projects in Beaverton

Costs - Comparative

155th Avenue Green Streets Pilot Project

500 lineal feet of street

greenvegetated swale $ 81,397.00

pervious concrete $ 162,794.00

conventionalquality & quantity not included

paving $ 109,303.70

Page 8: Pervious Concrete Projects in Beaverton

155th Avenue Green Streets Pilot Project

Pressure Wash � two times per Yearo leaves & tree needles will clog pores

Maintenance � Pervious Concrete Surface

Page 9: Pervious Concrete Projects in Beaverton

After

Before

155th Avenue Green Streets Pilot Project

Page 10: Pervious Concrete Projects in Beaverton

Public Plaza @ Lombard/Broadway

Page 11: Pervious Concrete Projects in Beaverton

Elimination of Stormwater Infrastructure Pervious Concrete Sidewalks for Pedestrian Access

Public Plaza @ Lombard/Broadway

Green Street Mechanics

Page 12: Pervious Concrete Projects in Beaverton

Public Plaza & Lombard / BroadwayUltimate #8 Pervious Concrete 58 Cubic Yards $232.00 per CY Includes On-Site TrainingLessons Learned

Consider Drainage for Slope Construction Pour

Sequencing in odd shaped and hard to get to areas.

Page 13: Pervious Concrete Projects in Beaverton

Pressure Wash �Twice per Year Nominal Maintenance Costs

Public Plaza @ Lombard/Broadway

Maintenance � Pervious Concrete

Page 14: Pervious Concrete Projects in Beaverton

Operations Center, Upper Yard

Project Goals Add 23 Parking Stalls for Seasonal Parking Secured Temporary Landscaping Storage Area Regional Trail alignment with THPRD Use �Green� Concept

Page 15: Pervious Concrete Projects in Beaverton

Operations Center, Upper YardEvolution Ultimate Pervious Concrete 53.5 Cubic Yards $210.00 per CY Includes On-Site Training

Lessons Learned

Lura Screed �Way to Go� Recalculate Quantities Prior

To Pour

Page 16: Pervious Concrete Projects in Beaverton

Operations Center, Upper Yard

Comparative Costs

green $ 35,959.01 $ 173,157.97 $137,198.96

conventional $ 0.00 $ 89,360.00 $89,360.00

Page 17: Pervious Concrete Projects in Beaverton

Before

Operations Center, Upper Yard

Reconfiguration

Page 18: Pervious Concrete Projects in Beaverton

After

Operations Center, Upper Yard

Reconfiguration

Page 19: Pervious Concrete Projects in Beaverton

Operations Center, Upper Yard

Pervious Concrete Pavement

Page 20: Pervious Concrete Projects in Beaverton

7th StreetDiscussion of Possible Utility & Street Improvements

Studied the Drainage Situation

Page 21: Pervious Concrete Projects in Beaverton

Design development

7th Street

1. Property owners & residents sign petition

2. Resolution of intent to form Local Improvement District

3. Local Improvement District Formed via Public Hearing

Page 22: Pervious Concrete Projects in Beaverton

7th Street

consultant concept

Design development

Page 23: Pervious Concrete Projects in Beaverton

7th StreetEvolution Ultra Pervious Concrete 74 Cubic Yards $163.00 per CY Includes On-Site Training

Project Notes

Mobile Mixer On-Site Storage of Aggregate

Page 24: Pervious Concrete Projects in Beaverton

7th StreetComparative Costs Storm System vs. Rain Gardens

green Rain Garden (9): $ 21,528 $ 115,210 Storm System: $93,682

conventional $ 0.00 $ 93,682$93,682

L.I.D. �> Capital Cost ~ $61/foot of Street Frontage

Page 25: Pervious Concrete Projects in Beaverton

Street Improvements

7th Street

Before

After - Oct. 2009

Page 26: Pervious Concrete Projects in Beaverton

Street Improvements

7th Street

Before

After - Oct. 2009

Page 27: Pervious Concrete Projects in Beaverton

Thank You.

Page 28: Pervious Concrete Projects in Beaverton

City of Beaverton, Oregon

Deborah Martisak