Perspective View 03 Two new street trees have been proposed to Cremorne Street. 3 horizontal bicycle rails providing a total of 6 available visitor bike space have been proposed on Cremorne Street. A hospitality tenancy occupies the front corner of the ground level, engaging with Cremorne Street and inviting visitors to occupy the pocket park. A freestanding fire hydrant and booster assembly is proposed at the ground level, eliminating the need for cupboards that would reduce visual permeability. A landscaped edge continues along the full extent of the northern boundary, offering a considered boundary condition to the adjoining properties and private external terraces for the ground floor offices. A dedicated main entry to the building is located on Cremorne Street between the car park entry and the pocket park. Design Features General Note HD render is of lodged desing. Refer RFI08 - Additional Renders for current design p. 39 116 Cremorne Street, Cremorne Design Proposal Design Report Rev B

Upload: others

Post on 03-Apr-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Perspective View 03 - City of Yarra · 2020. 11. 19. · CNC03 - Pre-cast Concrete (Dark grey) 4. CNCO4 - Pre-cast Concrete (Ribbed/Fluted) 5. MTL01 - Brass / Bronze Metal Finish

Perspective View 03

– Two new street trees have been proposed to Cremorne Street.

– 3 horizontal bicycle rails providing a total of 6 available visitor bike space have been proposed on Cremorne Street.

– A hospitality tenancy occupies the front corner of the ground level, engaging with Cremorne Street and inviting visitors to occupy the pocket park.

– A freestanding fire hydrant and booster assembly is proposed at the ground level, eliminating the need for cupboards that would reduce visual permeability.

– A landscaped edge continues along the full extent of the northern boundary, offering a considered boundary condition to the adjoining properties and private external terraces for the ground floor offices.

– A dedicated main entry to the building is located on Cremorne Street between the car park entry and the pocket park.

Design Features

General Note HD render is of lodged desing. Refer RFI08 - Additional Renders for current design

p. 39116 Cremorne Street, CremorneDesign Proposal

Design Report Rev B

Page 2: Perspective View 03 - City of Yarra · 2020. 11. 19. · CNC03 - Pre-cast Concrete (Dark grey) 4. CNCO4 - Pre-cast Concrete (Ribbed/Fluted) 5. MTL01 - Brass / Bronze Metal Finish

Perspective View 04

– Varying setbacks and chamfers to the western portion of the podium and upper form provides generous separation from the western properties, while also providing external terraces to the offices on selected levels.

– Terrace planting creates a buffered zone between the building edge and habitable terraces areas.

Design Features

General Note HD render is of lodged desing. Refer RFI08 - Additional Renders for current design

p. 40116 Cremorne Street, CremorneDesign Proposal

Design Report Rev B

Page 3: Perspective View 03 - City of Yarra · 2020. 11. 19. · CNC03 - Pre-cast Concrete (Dark grey) 4. CNCO4 - Pre-cast Concrete (Ribbed/Fluted) 5. MTL01 - Brass / Bronze Metal Finish

Material Palette

p. 41116 Cremorne Street, CremorneMaterial Palette

Design Report Rev B

Page 4: Perspective View 03 - City of Yarra · 2020. 11. 19. · CNC03 - Pre-cast Concrete (Dark grey) 4. CNCO4 - Pre-cast Concrete (Ribbed/Fluted) 5. MTL01 - Brass / Bronze Metal Finish

1. CNC01 - Precast Concrete

2. CNC02 - Exposed Aggregate Concrete

3. CNC03 - Pre-cast Concrete (Dark grey)

4. CNCO4 - Pre-cast Concrete (Ribbed/Fluted)

5. MTL01 - Brass / Bronze Metal Finish

6. MTL02 - Annodised Aluminum

7. MTL03 - Metal Finish (Black)

8. GS01 - Clear Glazing

9. GS02 - Fluted Glazing

Material Palette

Material Palette

The proposed material palette is deliberately restrained to create a legible architectural gesture of podium and upper form. The nominated materials have inherent qualities of durability and will age well over the life of the building in the Cremorne context.

p. 42116 Cremorne Street, CremorneMaterial Palette

Design Report Rev B

Page 5: Perspective View 03 - City of Yarra · 2020. 11. 19. · CNC03 - Pre-cast Concrete (Dark grey) 4. CNCO4 - Pre-cast Concrete (Ribbed/Fluted) 5. MTL01 - Brass / Bronze Metal Finish