Personal Information Full Name: Ahmed Abdelhamid Ahmed Abdelrasool. Date of Birth: 27/11/1984 (Riyadh, K.S.A) Gender: Male. Nationality: Egyptian. Religion: Muslim Marital Status: Married. Military Status: Final Exemption Contact Details Mobile Number: +971-521010594 / +971-526458985 E-Mail Address: [email protected] Address : Springs 6, Emirates hills, Dubai - UAE Education Bachelor of Engineering, Architectural department, Ain Shams University, (Cairo, Egypt). (FEAD) 2007. (Design Section) - Over all degree: Good. (PRMG) Professional Program in Project Management, American University, (Egypt - 2010) (YPDC) Yat Professional Diploma in Civil engineering, Yat institute (Cairo, Egypt - 2011) Preparation of PMP Project management Professional (Polaris Human development, Doha Qatar) Work Experiences 1- Construction Manager for finishing and fit out works at Pilot Contracting and Trading Company. Doha,Qatar (From February 2013 till now). 2- Senior Architect at Saudi Ben Laden Group for Construction and Contracting Works.(S.B.G) Riyadh,K.S.A (From September 2007 to January 2013). Skills and Abilities Languages : - Mother tongue / Arabic. - Other languages : English (Fluent: Reading, Writing, Conversation) Computer Skills : - AutoCAD Program. - Primavera P6. - Photoshop Program and presentation works. - Microsoft Office Programs.

Upload: doandiep

Post on 16-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Personal Information

Full Name: Ahmed Abdelhamid Ahmed Abdelrasool. Date of Birth: 27/11/1984 (Riyadh, K.S.A)

Gender: Male.

Nationality: Egyptian.

Religion: Muslim

Marital Status: Married.

Military Status: Final Exemption

Contact Details

Mobile Number: +971-521010594 / +971-526458985 E-Mail Address: [email protected] Address : Springs 6, Emirates hills, Dubai - UAE

Education

Bachelor of Engineering, Architectural department, Ain Shams University, (Cairo, Egypt).

(FEAD) 2007. (Design Section) - Over all degree: Good.

(PRMG) Professional Program in Project Management, American University, (Egypt - 2010) (YPDC) Yat Professional Diploma in Civil engineering, Yat institute (Cairo, Egypt - 2011) Preparation of PMP Project management Professional (Polaris Human development, Doha Qatar)

Work Experiences

1- Construction Manager for finishing and fit out works at Pilot Contracting and Trading Company. Doha,Qatar (From February 2013 till now).

2- Senior Architect at Saudi Ben Laden Group for Construction and Contracting Works.(S.B.G) Riyadh,K.S.A (From September 2007 to January 2013).

Skills and Abilities

Languages :

- Mother tongue / Arabic. - Other languages : English (Fluent: Reading, Writing, Conversation)

Computer Skills :

- AutoCAD Program. - Primavera P6.

- Photoshop Program and presentation works. - Microsoft Office Programs.

Page 2: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Projects:

Educational City (College Of Media and Communications)

- (From November 2014 till now)

- Location: Gharafah Area, Doha Qatar

- Client: Qatar Foundation

- Consultant: Louis Berger

- Reporting to: Projects Director

- Meetings with : Client, Consultant and subcontractors.

- Team members : (Planning engineer, QA/AC & QS engineers, Site engineers, HSE engineer, Supervisors)

Responsibilities:

Working as a Construction Manager for the finishing works at the project.

Responsible for all finishing and fit out works from the tendering stage till the handing over stage.

Evaluate the received quotations from the subcontractors and prepare the Comparison and

Compliance sheets for the commercial and technical packages to select the suitable one.

Meet the Vendor list suppliers to insure that the selected materials are complying with the required

specifications from the client, and prepare the delivery and manufacturing plans.

Approve the monthly invoices for the subcontractors and the materials suppliers.

Following up the daily production at site and evaluate the progress.

Following up the site execution for HSE plan, and evaluate the HSE performance at the project.

Prepare the handing over plans and the time frame schedule for the site activities.

Prepare the cost studies to control the budget and follow up the commercial issues with the financial

team (Performa invoices, LC/LG and payment certificates).

Lead the daily meetings with the site team to avoid any delay for the planned time schedule.

Attend the weekly and the monthly meetings with the client to review the current progress and

following up contractual the financial issues (monthly invoices , variations)

The Pearl Qatar

- (From Feb. 2013 to October 2014) - Location: West Bay, Doha Qatar

- Client: The Land - ACC Company - Consultant: Hill international and ECG

- Reporting to: Project Manager.

- Team members : Site engineers, Supervisors, QA/QC, QS engineers, HSE officers and draftsmen.

- Meetings with : Client, Consultant and subcontractors

Page 3: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Responsibilities:

Working as a Project Architect for tower Porto Arabia 2B.

Lead the team members to Control the daily finishing activities at the site, and organize the required

meetings with the subcontractors to evaluate the progress and raise the reports to the top managers.

Giving the technical support and solve the problems at site.

Responsible engineer for handing over all the finishing works and the snag list to the consultant.

Following up the (material submittals, mock up and variation orders) with the consultant.

Following up any required variations (design changing) from the client to review it with the

consultant and get the final approval from the technical office.

Design coordinator for the Facades work for Viva Bahriya towers VB (12-13-14).

The Gate Tower, ( Renovation and fitting out tender).

- Location: Dafnah Area, Doha Qatar - Client: EZC Company and Astad - Consultant: AEB.

- Reporting to: General manager - Meetings with : Client and Project Management (Astad).

- Team members : (Quantity Surveyor, Supervisors, draftsmen and MEP suppliers).

Responsibilities:

Responsible for the tender documents submission and the coordination process with the Client.

Responsible for the interior design concepts and prepare the technical submittals and shop drawings.

Advise the site team about the technical solutions and following up the client comments at the site.

King Abd El. Aziz University For Health And Sciences. (P.1411)

- (From January 2011 to January 2013) - Location : (Khurais Road,Riyadh Saudi Arabia)

- Total Coast: 20 Billion Saudi Riyals - Client: Saudi National Guards.

- Consultant: Dar Alhandasah. - Reporting to: Project Manager.

- Team members : (Architect site engineer, Civil and mechanical engineers , supervisors , QA/QC and QS)

- Meetings with : Designer , Consultant , Civil and MEP engineers.

Responsibilities :

Wporking as a Senior architect for The Sports And Recreation Area.

The coordinator between Pre-cast cladding Panels and the (Aluminum work, steel structural system)

for the project Elevations.

Design coordinator for the finishes and the MEP services.

Responsible engineer for handing over the architectural works at health care zone to the consultant.

Study the materials specifications and submit it to the consultant to get the final approvals.

Following up the shop drawings (IFC, AFC) and the As built works with the technical office.

Following up the inspections with the consultant to close the (RFIT , NCR and SI).

Page 4: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Princess Noura University for Women (P.1099)

- (From April 2009 to December 2010)

- Location : (Riyadh Airport Road, Saudi Arabia)

- Total Coast : 54 Billion Saudi Riyals

- Client: Saudi Ministry Of Finance

- Consultant: Dar Alhandasah

- Reporting to: Finishing Chief Manager

- Team members : (Civil and MEP engineers, Quality control engineer , supervisors and installation teams)

- Meetings with : Consultant , Civil engineer and subcontractors

Responsibilities :

The Responsible Architect for the Pre-Cast and GRC elevations work at the Colleges Zone.

The coordinator between the Precast cladding work and the civil, MEP works.

Responsible engineer for handing over the elevations finishing works to the consultant in the project.

Prepare the Time Schedule for the erection work, and prepare the delivery plan from the factory.

Responsible for the erection of Parapets and Segments pieces for the Auto Drive Train bridge.

The Erection Engineer of Hollow Core and Double T Slabs in the project.

Development of The Ministry Of Interior. (P. 999)

- From September 2007 to March 2009

- Location: (Riyadh-Dammam Road, Saudi Arabia).

- Total Coast : 12 Billion Saudi Riyals

- Client: Saudi Ministry Of Interior

- Consultant: Dar Alhandasah

- Reporting to: HQ Area Manager

- Meetings with : Consultant , Civil engineer and MEP engineer

- Team members : (Architect,Civil and mechanical engineers, supervisors and Quality control inspector)

Responsibilities :

Working as a site engineer responsible of the following buildings at the Head Quarter zone (HQ)

HQ 115 (Hospital) HQ 116 (Data Center Building) HQ 104 (Mosque) HQ 103 (Restaurant)

Responsible for all the civil,Architectural,and finishing works in these buildings

Raise the R.F.I and follow up the inspections and closing the consultant site comments (NCR and SI).

Responsible engineer for the coordination between the electro-mechanical and Finishing works.

The coordinator engineer between the civil work and elevation cladding works.

Page 5: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Educational City (College Of Media And communications)

Acoustical Ceiling Panels at the Mosque

Sound Insulation process at Black Theater Room

Tectum Cladding Panels at Black Studio Room

Finishing works at Projection Theater room

Finishing works at The Entrance lobby

Page 6: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Educational City (College Of Media and communications)

Wooden Ceiling Cladding Work at Large event Room

Wooden Finishing Works at the meeting room

Aluminum and Steel works at the Library Hall

Page 7: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

The Pearl Qatar (Porto Arabia and Viva Bahriya Towers)

Precast Cladding Works

Viva Bahriya Towers VB (12,13,14)

Elevations Rendering

Clay Tiles fixation at the roof

Page 8: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

The Pearl Qatar (Porto Arabia and Viva Bahriya Towers)

Finishing work at corridors

Finishing works at Gazebo and pool deck area

Apartments Finishing works

Kitchens finishing works

Page 9: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

King Abd El. Aziz University For Health And Sciences

Elevations works at Hospital

Elev. works at Administration

Finishing Works at Library Finishings at Manager Room

Ceilings Finishing Works Gypsum Board Works

Page 10: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

King Abd El. Aziz University For Health And Sciences

Finishing works at Stadium Finishing works at Food Court

Finishing works at Swimming Pool

Finishing works at Health Center

Finishing works at Courts Area

Finishing works at Main Corridor

Page 11: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

Princess Noura University for Women

Erection of Precast panels on Steel Linkage Bridge

Erection of Precast panels at colleges entrances

Erection of I-Beams Precast Pieces at Gates

Erection of Precast panels at Housing Area

Erection of Precast panels at Research Center

Erection of D.T.S Slabs on the Train Bridge

Page 12: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

The Development Of The Ministry Of Interior

Finishing works at Mosque

Finishing works at Laboratory in Hospital Building

Finishing works at the theater in Data Center Building

Finishing works at Patients Rooms in Hospital Building

Finishing works at Restaurant Elevations works at Restaurant

Page 13: Personal Information - InterCare · PDF filePreparation of PMP Project management Professional ... (Quantity Surveyor, ... Working as a site engineer responsible of the following buildings

The Development Of The Ministry Of Interior

Concrete works at Mosque Building

Finishing works at the entrance of Hospital building

Finishing works at the Data Center’s corridor

Finishing works at the Hospital’s corridor