performing commercial mechanical plan reviews · performing commercial mechanical plan reviews ......

220
Performing Commercial Mechanical Plan Reviews Based on the 2012 Michigan Mechanical Code and the 2012 International Fuel Gas Code `

Upload: others

Post on 01-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Commercial Mechanical

Plan ReviewsBased on the 2012 Michigan Mechanical Code

and the 2012 International Fuel Gas Code

`

Page 2: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Welcome

▪ I am…

▪ You are…

▪ What do you do?

▪ Where are you from?

▪ How familiar are you with the IMC and/or IFGC?

▪ What do you hope to get out of this seminar?

2Copyright 2009, International Code Council

Page 3: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Overview

▪ General Mechanical Code Plan Reviews

▪ Performing Appliance Reviews

▪ Reviewing Fireplaces and Solid Fuel Appliances

▪ Performing Plan Reviews of Piping Systems

3Copyright 2009, International Code Council

Page 4: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Overview

▪ Performing Ventilation Plan Reviews

▪ Reviewing Inspections of Combustion Air Provisions

(Gas) and NonGas

▪ Performing Venting Systems Plan Reviews

▪ Performing Plan Reviews of Exhaust Systems

4Copyright 2009, International Code Council

Page 5: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Overview

▪ Reviewing Ducts and Plenums

▪ Performing Refrigeration Plan Reviews

▪ Plan Review of Gas Piping Installations

5Copyright 2009, International Code Council

Page 6: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

GENERAL MECHANICAL

INSPECTION

Module 2

Page 7: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Required General

Inspections

1. Check underground installations.

IMC section 107.2 (1)/IFGC Section 107.2 (1)

2. Check rough-in components.

IMC section 107.2 (2)/IFGC Section 107.2 (2)

3. Perform the final inspection.

IMC section 107.2 (3)/IFGC Section 107.2 (3)

4. Review evaluations and inspection reports.

IMC section 107.2.5/IFGC Section 107.2.5

7Copyright 2009, International Code CouncilWorkbook Page 9-10

Page 8: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Observing/Verifying Tests

1. Check for Apparatus, Material and labor for Tests.

IMC Section 107.3.2/IFGC Section 107.3.2

2. Verify and/or observe tests.

IMC Section 107.3/IFGC Section 107.3

3. Retest failures.

IMC Section 107.3.3/IFGC Section 107.3.3

8Copyright 2009, International Code CouncilWorkbook Page 11-12

Page 9: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Clearance to Combustibles

Inspections

Two tasks:

1. Inspect clearances (only one step).

IMC Section 308.2/IFGC Section 308.2

2. Inspect clearance reduction methods.

IMC Table 308.6/IFGC Table 308.2

9Copyright 2009, International Code CouncilWorkbook Page 13

Page 10: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

How To Measure

▪ IMC Table 308.6/IFGC Table 308.210Copyright 2009, International Code Council

Workbook Page 14

Page 11: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Clearances

▪ While performing an inspection you find a finished

wood door that opens to within an inch of an

appliance that requires a minimum clearance of

12 inches (305 mm). An installer tries to convince

you that a fire hazard is not present since the door

is mechanically closed automatically.

▪ As a code official, what would you do?

▪ How would you explain your position to the contractor?

11Copyright 2009, International Code CouncilWorkbook Page 14

Page 12: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Clearance Reduction

1. Check that reduction is allowed.

IMC Section 308.2

2. Check listed appliances and equipment.

3. Check protective assembly construction and installation.

IMC Section 308.3

4. Check allowable reduction.

12Copyright 2009, International Code CouncilWorkbook Page 15-16

Page 13: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Reduced Clearance for 3 ½ -inch Brick

Wall

13Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm

Workbook Page 15-16

Page 14: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Reduced Clearance to Combustibles Using

Protective Assemblies

14Copyright 2009, International Code CouncilWorkbook Page 15-16

Page 15: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Protection of Structure

Inspections

Four tasks:

1. Inspect structural safety.

IMC Section 302.1/IFGC Section302.1

2. Inspect cutting, notching and boring in wood framing.

3. IMC Section 302.3/IFGC Section 302.3

4. Inspect alterations to trusses.

IMC Section 302.4/IFGC Section 302.4

5. Inspect cutting, notching and boring in steel framing. IMC

Section 302.5/IFGC Section 302.5

15Copyright 2009, International Code Council

Workbook Page 17

Page 16: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Structural Safety

1. Check for structure weakening.

IMC Section 302.3.2/IFGC Section 302.3.4

2. Check structural condition after structural alterations.

IMC Section 302.1/IFGC Section 302.1

3. Check protection of penetrations of floor/ceiling assemblies

and fire-resistance-rated assemblies.

IMC Section 302.2/IFGC Section 302.2

16Copyright 2009, International Code CouncilWorkbook Page 18

Page 17: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Cutting, Notching and

Boring in Wood Framing

1. Check joist notching.

IMC Section 302.3.1/IFGC Section 302.3.2

2. Check stud cutting and notching.

IMC Section 302.3.2/IFGC Section 302.3.3

3. Check bored holes.

IMC Section 302.3.3/IFGC Section 302.3.4

4. Check engineered wood products.

IMC Section 302.3.4/IFGC Section 302.3.1

17Copyright 2009, International Code CouncilWorkbook Page 19-20

Page 18: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Limitations for Cutting, Notching and

Bored Holes

18Copyright 2009, International Code CouncilWorkbook Page 19-20

Page 19: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Bored Hole Limitations

For SI: 1 inch = 25.4 mm

19Copyright 2009, International Code CouncilWorkbook Page 19-20

Page 20: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Alterations to Trusses

1. Check truss condition.

IMC Section302.4/IFGC Section 302.4

2. Check for alterations that add to loads of trusses.

IMC Section302.4/IFGC Section 302.4

20Copyright 2009, International Code CouncilWorkbook Page 21

Page 21: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Cutting, Notching and

Boring in Steel Framing

1. Check cutting, notching and boring holes in structural steel

framing.

IMC Section 302.5.1/IFGC Section 302.5

2. Check cutting, notching and boring holes in cold-formed steel

framing.

IMC Section 302.5.2/IFGC Section 302.6

3. Check cutting, notching and boring holes in nonstructural cold-

formed steel wall framing.

IMC Section 302.5.3/IFGC Section 302.7

21Copyright 2009, International Code CouncilWorkbook Page 22

Page 22: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING APPLIANCE

INSPECTIONS

Module 3

Page 23: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Appliance Location

Inspections

Three tasks:

1. Inspect general locations.

IMC Section 303.1/IFGC Section 303.1

2. Inspect indoor locations.

IMC Section 303.5/IFGC Section 303.5

3. Inspect outdoor locations.

IMC Section 303.6/IFGC Section 303.6

23Copyright 2009, International Code CouncilWorkbook Page 25

Page 24: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect General Locations

1. Check for hazardous locations.

IMC Section 303.2 and 304.3/ IFGC Section 303.2 and

305.2

2. Check for prohibited locations.

IMC Section 303.3/ IFGC Section 303.3

3. Check for protection from damage.

IMC Section 303.4/ IFGC Section 303.4

24Copyright 2009, International Code CouncilWorkbook Page 26

Page 25: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Indoor Locations

1. Check room volume.

IMC Section 303.5/IFGC Section 303.5

2. Check fuel-fired furnaces and boilers installed in closets

and alcoves.

IMC Section 303.5/IFGC Section 303.5

3. Check elevator shafts.

IMC Section 303.8/IFGC Section 301.15

25Copyright 2009, International Code CouncilWorkbook Page 27

Page 26: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Outdoor Locations

1. Check for outdoor listings and labels.

IMC Section 303.6/IFGC Section 303.6

26Copyright 2009, International Code CouncilWorkbook Page 27

Page 27: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Appliance Access

Inspections

Five tasks:

1. Inspect appliances in rooms.

IMC Section 306.2/IFGC Section 306.2

2. Inspect appliances in attics.

IMC Section 306.3/IFGC Section 306.3

3. Inspect appliances under floors.

IMC Section 306.4/IFGC Section 306.4

4. Inspect equipment and appliances on roofs and elevated

structures.

IMC Section 306.5/IFGC Section 306.5

5. Inspect appliances on sloped roofs.

IMC Section 306.5.1/IFGC Section 306.5.1

27Copyright 2009, International Code CouncilWorkbook Page 28

Page 28: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Appliances in Rooms

1. Check for compliance with access requirements.

IMC Section 306.2/IFGC Section 306.2

2. Check central furnaces installed in compartments or

alcoves. IMC Section 306.1.1

28Copyright 2009, International Code CouncilWorkbook Page 29

Page 29: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Appliances in Attics

1. Check for compliance with access requirements.

IMC Section 306.3/IFGC Section 306.3

2. Check for compliance with electrical requirements.

IMC Section 306.4.1/IFGC Section 306.3.1

29Copyright 2009, International Code CouncilWorkbook Page 30

Page 30: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Attic Location Requirements

30Copyright 2009, International Code CouncilWorkbook Page 30

Page 31: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Appliances Under

Floors

1. Check for compliance with access requirements.

IMC Section 306.4/IFGC Section 306.4

2. Check for compliance with electrical requirements.

IMC Section 306.4.1/IFGC Section 306.4.1

31Copyright 2009, International Code CouncilWorkbook Page 31

Page 32: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Equipment and Appliances on Roofs

and Elevated Structures

1. Check for permanent approved means of access.

IMC Section 306.5/IFGC Section 306.5

2. Check for obstacles to access and access safety.

IMC Section 306.5/IFGC Section 306.5

3. Check permanent ladders.

IMC Section 306.5/IFGC Section 306.5

4. Check catwalks.

IMC Section 306.5/IFGC Section 306.5

32Copyright 2009, International Code CouncilWorkbook Page 32-33

Page 33: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Sloped Roofs

1. Check for level platforms.

IMC Section 306.5.1/IFGC Section 306.5.1

2. Check platform dimensions.

IMC Section 306.5.1/IFGC Section 306.5.1

3. Check for guards on platform.

IMC Section 306.5.1/IFGC Section 306.5.1

33Copyright 2009, International Code CouncilWorkbook Page 34

Page 34: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Access Platform On Roof

34Copyright 2009, International Code CouncilWorkbook Page 34

Page 35: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Appliance Installation

Inspections

Eight tasks:

1. Examine installation information.

IMC Section 304.1/IFGC Section 305.1

2. Resolve conflicts (if applicable).

IMC Section 304.2/IFGC Section 305.1

3. Inspect installations having ignition sources.

IMC Section 304.3/IFGC Section 305.3

4. Inspect ventilation for hydrogen generating and refueling

operations.

IMC Section 304.5.1 through 304.5.3/IFGC Section 703.1.1

through 703.1.3305.1

35Copyright 2009, International Code CouncilWorkbook Page 35

Page 36: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Appliance Installation

Inspections

Eight tasks (cont.):

5. Inspect garages. IMC Section 304.6 and 304.7/IFGC Section 305.19 and 305.10

6. Inspect for boiler and furnace rooms. IMC Section 305.5

7. Inspect for Guards IMC Section 304.11/IFGC Section 306.6

8. Verify clearance from grade.IMC Section 304.10/IFGC Section 305.7

36Copyright 2009, International Code CouncilWorkbook Page 35

Page 37: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Examine Installation

Information

1. Check the manufacturer’s installation instructions.

IMC Section 304.1/IFGC Section 305.1

2. Check the applicable IMC/IFGC code sections.

IMC Section 304.1/IFGC Section 305.1

3. Compare the two.

37Copyright 2009, International Code CouncilWorkbook Page 36

Page 38: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Resolve Conflicts

1. Identify if installation information contains conflicts.

IMC Section 304.2/IFGC Section 305.1

2. Resolve the conflict.

IMC Section 304.2/IFGC Section 305.1

38Copyright 2009, International Code CouncilWorkbook Page 37

Page 39: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Installations Having

Ignition Sources

1. Check if the ignition source is located in a hazardous

location or other listed locations.

IMC Section 304.3/IFGC Section 305.3

2. Check the elevation of ignition source.

IMC Section 304.3/IFGC Section 305.3

39Copyright 2009, International Code CouncilWorkbook Page 38

Page 40: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Oil-fired Water Heater Installation in a

Hazardous Area

For SI: 1 inch = 25.4 mm

40Copyright 2009, International Code CouncilWorkbook Page 38

Page 41: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Ventilation for Hydrogen Generating

and Refueling Operations

1. Check for compliance with code requirements.

IMC Section 304.4/IFGC 703.1

2. Check natural ventilation

IMC Section 304.5/IFGC 703.1.1

3. Check mechanical ventilation

IMC Section 304.5.2/IFGC 703.1.2

4. Check specially engineered installations (if applicable). IMC

Section 304.5.3/IFGC 703.1.3

41Copyright 2009, International Code CouncilWorkbook Page 39-40

Page 42: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Garages

1. Check public garages.

IMC Section 304.6/IFGC 305.4

2. Check private garages.

IMC Section 304.7/IFGC 305.5

42Copyright 2009, International Code CouncilWorkbook Page 41

Page 43: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Appliance Installation in a Public

Garage

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.

43Copyright 2009, International Code Council

1

Workbook Page 41

Page 44: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 6: Inspect Boiler and Furnace

Rooms

Verify that boiler and furnace rooms are protected as

required by the International Building Code.

IMC Section 304.8/IFGC Section .305.6

44Copyright 2009, International Code CouncilWorkbook Page 41

Page 45: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 7: Inspect for Guards

1. Check that guards are present where required.

IMC Section 304.11

2. Check guard extensions.

IMC Section 304.11

3. Check the top of the guard(s).

IMC Section 304.11

4. Check guard construction.

IMC Section 304.11

45Copyright 2009, International Code CouncilWorkbook Page 42

Page 46: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Guards

46Copyright 2009, International Code CouncilWorkbook Page 42

Page 47: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Guards – Plan View

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

47Copyright 2009, International Code CouncilWorkbook Page 42

Page 48: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 8: Verify Clearance from Grade

1. Check for appliance supports

IMC Section 304.10/IFGC Section 305.7

48Copyright 2009, International Code CouncilWorkbook Page 43

Page 49: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING INSPECTIONS

OF FIREPLACES AND SOLID

FUEL APPLIANCES

Module 4

Page 50: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Three Tasks

1. Inspect masonry fireplaces.

IMC Section 902

2. Inspect factory-built fireplaces.

IMC Section 903

3. Inspect fireplace stoves and room heaters, pellet fuel

appliances, and barbecue appliances.

IMC Section 904 through 906

50Copyright 2009, International Code CouncilWorkbook Page 45

Page 51: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Masonry Fireplaces

▪ One step: Check that masonry fireplaces are built according

to the IBC.

IMC Section 902.1

51Copyright 2009, International Code CouncilWorkbook Page 47

Page 52: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Factory Built Fireplaces

1. Check fireplace and chimney installation.

IMC Section 905.2 and IFGC Section 903.1

2. Check hearth extensions.

IMC Section 903.2

3. Check appliance installed in fireplaces.

IMC Section 903.3 and UL 127

52Copyright 2009, International Code CouncilWorkbook Page 47-48

Page 53: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Typical Factory-build Fireplace With

Hearth

53Copyright 2009, International Code Council

Workbook Page 47

Page 54: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Fireplace Stoves and Room

Heaters, Pellet Fuel Appliances and Barbecue

appliances

1. Check installation.

IMC Section 905/IFGC

Section 602

2. Check for pellet fuel burning

appliances vent connection.

IMC Section 904

3. Check barbecue appliances

for compliance with IMC and

IFGC.

IMC Section 906 and IFGC

Section 623

54Copyright 2009, International Code CouncilWorkbook Page 48-49

Page 55: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING INSPECTIONS

OF PIPING SYSTEMS

Module 5

Page 56: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Four Parts

1. Performing inspections of hydronic piping

IMC Chapter 12

2. Performing inspections of refrigerant piping

IMC Chapter 11

3. Performing inspections of condensate piping

IMC Section 307/IFGC Section 307

4. Performing inspections of fuel piping and storage

systems

IMC Chapter 13

56Copyright 2009, International Code CouncilWorkbook Page 51

Page 57: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Hydronic

Piping

Three tasks:

1. Inspect piping materials.

IMC Section 1202

2. Inspect piping installation.

IMC Section 1206

3. Inspect transfer fluid.

IMC Section 1207

57Copyright 2009, International Code CouncilWorkbook Page 53

Page 58: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Refrigerant

Piping

Three tasks:

1. Inspect piping materials.

IMC Section 1107

2. Inspect joints.

IMC Section 1107.6/IFGC Section 1107.7

3. Inspect stop valves.

IMC Section 1107.8

58Copyright 2009, International Code CouncilWorkbook Page 59

Page 59: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Condensate

Piping

Three tasks:

1. Inspect fuel-burning appliances.

IMC Section 307.1/IFGC Section 307.2

2. Inspect drain pipe materials and sizes.

IMC Section 307.2.2 and Table 607.2.2/IFGC Section 307.3

3. Inspect evaporators and cooling coils.

IMC Section 307.2/IFGC Section 307.1

59Copyright 2009, International Code CouncilWorkbook Page 63

Page 60: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Fuel Burning

Appliance Drain

1. Check collection and discharge.

IMC Section 307.1/IFGC Section 307.2.

2. Check horizontal slope.

IMC Section 307.1/IFGC Section 307.2.

3. Check for corrosion resistance.

IMC Section 307.1/IFGC Section 307.3.

4. Check drain size. IMC Section 307.2.2 and Table 37.2.2/IFGC Section 307.3.

60Copyright 2009, International Code CouncilWorkbook Page 64

Page 61: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Drain Pipe Materials

and Sizes

1. Check component materials.

IMC Section 307.2.2/IFGC Section 307.3.

2. Check material selection.

IMC Section 307.2.2/IFGC Section 307.3.

3. Check condensate waste and drain line size.

IMC Section 307.2.2and Table 307.2.2/IFGC Section .

61Copyright 2009, International Code CouncilWorkbook Page 65

Page 62: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Evaporators and

Cooling Coils

1. Check condensate disposal point.

IMC Section 307.2.1

2. Check auxiliary and secondary drain systems.

IMC Section 307.2.3/IFGC Section 307.5.

3. Check traps.

IMC Section 307.2.4/IFGC Section 307.4.

62Copyright 2009, International Code CouncilWorkbook Page 66

Page 63: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Fuel Piping

and Storage Systems

Two tasks:

1. Inspect fuel oil piping.

IMC Table 305.4 and 1302.3.

3. Inspect hydrogen piping.

IMC Table 305.4 and IFGC Section 704, 705.

63Copyright 2009, International Code CouncilWorkbook Page 67

Page 64: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Fuel Oil Piping

1. Check for IFC

compliance.

IMC Section 1301.1.

2. Check materials.

IMC Section 1302.

3. Check joints and

connections.

IMC Section 1301.

4. Check fuel oil system

installation.

IMC Section 1305.

5. Check fill piping.

IMC Section 1305.6.

6. Check vent piping.

IMC Section 1305.7 .

64Copyright 2009, International Code CouncilWorkbook Page 68-70

Page 65: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Hydrogen Piping

1. Check piping. IMC Section 704

2. Check use. IMC Section 704.2

3. Verify tests.IMC Section 705

4. Check location. IFGC Section 706

5. Check for IFC compliance. IFGC Section 704.3

65Copyright 2009, International Code CouncilWorkbook Page 75-76

Page 66: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING VENTILATION

INSPECTIONS

Module 6

Page 67: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Four Tasks

1. Inspect exit enclosure ventilation.

IMC Section 601.3

2. Inspect openings.

IMC Section 401.4

3. Inspect natural ventilation.

IMC Section 402

4. Inspect mechanical ventilation.

IMC Section 403

67Copyright 2009, International Code CouncilWorkbook Page 77

Page 68: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Exit Enclosure

Ventilation

1. Check intake openings.

IMC Section 401.4

2. Check exhaust openings.

IMC Section 501.2.1.

3. Check opening protection.

IMC Section 401.5.

4. Check contaminant sources.

IMC Section 401.6.

68Copyright 2009, International Code CouncilWorkbook Page 79-80

Page 69: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Air Intake Opening Locations

69Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 79-80

Page 70: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Openings

▪ One step – Check Intake opening.

IMC Section 401.4 and 501.2.1

70Copyright 2009, International Code CouncilWorkbook Page 81-82

Page 71: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Natural Ventilation

1. Check for natural ventilation openings. IMC Section 402.1.

2. Check ventilation area required. IMC Section 402.2.

3. Check adjoining spaces. IMC Section 402.3.

4. Check openings below grade (if present).IMC Section 402.4.

71Copyright 2009, International Code CouncilWorkbook Page 83

Page 72: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Mechanical Ventilation

1. Check the ventilation means. IMC Section 403.1.

2. Determine the ventilation rate. IMC Table 403.3.

3. Check the ventilation rate. IMC Table 403.3.

4. Check the recirculation of air. IMC Section 403.2.1.

5. Check transfer air, if being utilized. IMC Section 403.2.2.

6. Check common ventilation systems.IMC Section 403.2.3

72Copyright 2009, International Code CouncilWorkbook Page 84-89

Page 73: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

An Energy-conserving Alternative to

Natural Ventilation

73Copyright 2009, International Code CouncilWorkbook Page 84-89

Page 74: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING INSPECTIONS OF

COMBUSTION AIR PROVISIONS

(GAS) AND NONGAS

Module 7

74

Page 75: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Five Parts

1. Performing inspections of indoor air (gas).

IFGC Section 304.5.

2. Performing inspections of outdoor air provisions.

IFGC Section 304.6.

3. Performing inspection of combination indoor/outdoor air.

IFGC Section 304.7.

4. Performing inspections of engineered systems and

mechanical combustion air supply.

IFGC Section 304.8.

75Copyright 2009, International Code CouncilWorkbook Page 91

Page 76: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Five Parts (cont.)

5. Performing inspection of nongas fuel installation.

Mechanical Combustion Air Supply.

IFGC Section 304.9

76Copyright 2009, International Code CouncilWorkbook Page

91

Page 77: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Indoor Air

(Gas)

1. Determine the required indoor volume.

IFGC Section 304.5.1 and 304.5.2

2. Check indoor opening size and location.

IFGC Section 304.5.3.

77Copyright 2009, International Code CouncilWorkbook Page 92

Page 78: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

All Air from Inside the Building

78Copyright 2009, International Code CouncilWorkbook Page 92

Page 79: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections for Outdoor

Air (Gas) Provisions

Three tasks:

1. Inspect air opening dimensions.

IFGC Section 304.6.

2. Inspect two-permanent-opening method.

IFGC Section 304.6.1.

3. Inspect one-permanent-opening method.

IFGC Section 304.6.2.

79Copyright 2009, International Code CouncilWorkbook Page 95

Page 80: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Air Opening

Dimensions

One step - Check minimum dimension of any air

opening.

IFGC Section3 04.5.3, 304.5.3.1 and 304.5.3.2.

80Copyright 2009, International Code CouncilWorkbook Page 96

Page 81: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Two-Permanent-

Opening Method

1. Check opening location.

IFGC Section304.5.3.

2. Check communication to the outdoors.

IFGC Section 304.6

81Copyright 2009, International Code CouncilWorkbook Page 96

Page 82: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Inlet Air from Ventilated Crawl Space and

Outlet Air to Ventilated Attic

82Copyright 2009, International Code CouncilWorkbook Page 96

Page 83: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Inlet Air from Inlet Duct and Outlet Air

to Ventilated Attic

83Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 96

Page 84: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

All Air from Outdoors

84Copyright 2009, International Code CouncilWorkbook Page 96

Page 85: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect One-Permanent-

Opening Method

1. Check opening location.

IFGC Section 304.6.2.

2. Check communication to the outdoors.

IFGC Section 304.7.1.

3. Check clearances.

IFGC Section 304.7.1.

85Copyright 2009, International Code CouncilWorkbook Page 97

Page 86: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

One-Permanent-Opening Method, All

Air from the Outdoors

86Copyright 2009, International Code CouncilWorkbook Page 97

Page 87: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Combination

Indoor/Outdoor Air

Three tasks:

1. Inspect indoor openings.

IFGC Section 304.7.1.

2. Inspect outdoor opening location.

IFGC Section 304.7.2.

3. Inspect outdoor opening(s) size.

IFGC Section 304.7.3.

87Copyright 2009, International Code CouncilWorkbook Page 98

Page 88: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Indoor Openings

1. Check for the minimum free area.

IFGC Section 304.7.3.

2. Check opening locations.

IFGC Section 304.7.3.

88Copyright 2009, International Code CouncilWorkbook Page 98

Page 89: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Outdoor Opening

Location

One step – Check opening locations.

IFGC Section 304.7.3 and 304.10

89Copyright 2009, International Code CouncilWorkbook Page 99

Page 90: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Outdoor Opening(s)

Size

One step – Check outdoor opening sizes.

IFGC Section 304.6,304.6.1 and 304.6.2.

90Copyright 2009, International Code CouncilWorkbook Page 99

Page 91: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Performing Inspections of Engineered Systems

and Mechanical Combustion Air Supply

Two tasks:

1. Inspect engineered systems.

IFGC Section 304.8.

2. Inspect mechanical combustion air supply.

IFGC Section 304.9.

91Copyright 2009, International Code CouncilWorkbook Page 100

Page 92: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Engineered Systems

One step – Verify that engineered systems meet the

intent of the code.

IFGC Section 304.8.

92Copyright 2009, International Code CouncilWorkbook Page 100

Page 93: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Mechanical

Combustion Air Supply

1. Check outdoor air supply rate.

IFGC section 304.9

2. Check makeup air.

IFGVC Section 304.9.1.

3. Check appliance interlock.

IFGC Section 304.9.2.

4. Check combined combustion air and ventilation air system.

IFGC Section 304.9.3.

93Copyright 2009, International Code CouncilWorkbook Page 101

Page 94: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Mechanical Combustion Air Supply

System

94Copyright 2009, International Code CouncilWorkbook Page 101

Page 95: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Mechanical Combustion Makeup Air

Supply System

95Copyright 2009, International Code CouncilWorkbook Page 101

Page 96: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Mechanical Combustion Makeup Air

Supply System

96Copyright 2009, International Code CouncilWorkbook Page 101

Page 97: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING VENTING

SYSTEMS INSPECTIONS

Module 8

Page 98: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Five Tasks

1. Inspect for general compliance.

IFGC Section 501.1 and 501.2.

2. Inspect vents.

IFGC Section 502 and 503.1.

3. Inspect chimneys.

IFGC Section 501.3.

4. Inspect connectors.

IFGC Section 503.10 and 504.3.2.

5. Inspect appliance venting.

IFGC Section 503.

98Copyright 2009, International Code CouncilWorkbook Page 103

Page 99: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect for General Requirements

Compliance

▪ Only 1 step

IFGC Section 501.2 and 503.

▪ The critical operating characteristics are as follows:

▪ Positive or nonpositive (negative or neutral) pressure

within the venting system.

▪ Whether the flue gas generated has a temperature

that approaches the dew point making excessive

condensation likely.

99Copyright 2009, International Code CouncilWorkbook Page 105

Page 100: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Appliance Categories

Pressure Excessive Condensation

Positive Non-Positive Avoids Creates

Category I X X

Category

II

X X

Category

III

X X

Category

IV

X vented X

Copyright 2009, International Code Council

Workbook Page 105100

Page 101: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Vents

1. Only one step

IFGC Section 502.1, 503 and 504.

▪ There are six types of venting systems that must be

inspected:

1. Type B gas vent.

2. Type BW gas vent.

3. Type L vent.

4. Chimney.

5. Single-wall metal pipe.

6. Plastic pipe and stainless steel special venting systems.

101Copyright 2009, International Code CouncilWorkbook Page 106

Page 102: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Chimneys

1. Check masonry

chimneys.

IFGC Section 501.3

2. Check for common

chimneys or flue-ways.

IFGC Section 501.9.

3. Check gas-fired

appliances.

IFGC Section 503.5.6.

4. Check for decorative

shrouds.

IFGC Section 503.6.4.1.

5. Check existing chimneys

and vents.

IFGC Section 501.15.

6. Check sizing of venting

systems.

IFGC Section 501.15.1

102Copyright 2009, International Code CouncilWorkbook Page 107-112

Page 103: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Decorative Shrouds

103Copyright 2009, International Code CouncilWorkbook Page 107-112

Page 104: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Existing Chimneys and Vents

OUTSIDE WALL

REPLACEMENT BOILER-CATEGORY III VENTEDTHROUGH WALL

REMOVED APPLIANCE,PREVIOUS CHIMNEY-CONNECTED BOILER

EXISTING MASONRY CHIMNEY

EXISTING WATER HEATER

CLEAN-OUT

104Copyright 2009, International Code CouncilWorkbook Page 107-112

Page 105: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Vent System Performance Factors

105Copyright 2009, International Code CouncilWorkbook Page 107-112

Page 106: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Connectors

1. Check for potential condensate production.

IFGC Section 503.1 and 503.9.

2. Check connector location.

IFGC Section 503.10 through 503.15.

3. Check combined connectors.

IFGC Section 503.10.3.3.

4. Check offsets.

IFGC Section 503.10.9, 504.2.3 and 504.3.2.

5. Check connector length limit.

IFGC Section 504.3.2 and 503.10.9.

106Copyright 2009, International Code CouncilWorkbook Page 113-115

Page 107: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Connectors

107Copyright 2009, International Code CouncilWorkbook Page 113-115

Page 108: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Vent System

Which vent system is designed more efficiently?

108Copyright 2009, International Code Council

A = 20 percent capacity reduction

Water Heater

40MBH

NAT

40MBH

NAT

80MBH

FAN

80MBH

FAN

Water HeaterFurnace Furnace

HEIGHT20´

3”

4”

5” 5”OFFSET

LENGTH

SYSTEM A

B = 10 percent capacity reduction

LENGTH

MANIFOLD

ELBOWOR

TEE

SYSTEM B

HEIGHT

Note: = Connectors

20´

1 MBH = 1000 Btu/h

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 113-115

Page 109: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Vent System: Answers

▪ Determine the correct maximum connector length

▪ Compare to the actual length

IFGC TABLE 504.3.2 with no reduction

IFGC Sections 504.3.4 and 504.3.5 you must take

reductions so there are not as efficiently

109Copyright 2009, International Code CouncilWorkbook Page 115

Page 110: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Connector Length Limit

110Copyright 2009, International Code Council

A 3" diameter

B 4" diameter

C 6" diameter

2.5'

4.5'

2'

1'

9.5'

FANOR

DRAFTHOOD

APPLIANCEDRAFTHOODDRAFTHOOD

DRAFTHOOD

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 116

Page 111: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Connector Length Limit - Answer

▪ A: Actual connector length = 2.5

Max. allowed = 4.5▪ B: Actual connector length = 4.5

Max. allowed = 6.0▪ C:Actual connector length = 9.5

Max. allowed = 9.0

111Copyright 2009, International Code CouncilWorkbook Page 117

Page 112: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Connectors

6. Check for length alternative.

IFGC Section 503.10.9 or 504.3.2.

7. Check for common vent offsets.

IFGC Section 503.6.9.2 or 504.3.5.

8. Check for vent capacity reduction.

IFGC Section 504.3.6.

9. Check for connector capacity reduction.

IFGC Section 504.3.3.

10. Check seven times rule.

IFGC Section 504.2.8.

112Copyright 2009, International Code CouncilWorkbook Page 117-123

Page 113: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Step 6 Check for length altenative

▪ If a furnace is served by a 5-inch (127 mm) vent

connector that is 12 feet (3658 mm) in length,

the 11/2 feet (457 mm) for every inch of

connector diameter is exceeded by 41/2 feet

(1402 mm). Therefore, the maximum capacity of

the connector would be reduced by 10 percent.

113Copyright 2009, International Code CouncilWorkbook Page 117

Page 114: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Length Alternative

114Copyright 2009, International Code Council

3' R

ISE

5-INCH DIAMETERDOUBLE-WALL CONNECTOR

CL

DOUBLE-WALLCONNECTOR

FROM 2ndCATEGORY IAPPLIANCE

HOT WATER BOILERFAN-ASSISTED82% EFFICIENT135,000 Btu/h

20 ftTOTALVENT

HEIGHT

Workbook Page 118

Page 115: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Length Connector

A. Determine maximum allowable vent

connector length

▪ Use Table 504.3.2

▪ 5 inch (127 mm) connector diameter is 7 ½

feet (2286 mm).

225

115Copyright 2009, International Code CouncilWorkbook Page 118

Page 116: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Length Connector

B. Determine absolute maximum allowable

vent connector length

▪ Use Section 503.10.9

▪ 5 inch (127 mm) connector diameter 20 feet

(6096 mm).

195

116Copyright 2009, International Code CouncilWorkbook Page 119

Page 117: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Length Connector

C. Evaluate steps 1 and 2

▪ Apply the more restrictive criteria, or

▪ Apply connector length alternative provisions

of Section 504.3.3

30

117Copyright 2009, International Code CouncilWorkbook Page 119

Page 118: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Length Connector

D. Apply provisions of Section 504.3.3

▪ Use Tables 504.3(2) and 504.3(1)

▪ Extend vent connector maximum length to 15 feet (4572 mm)

▪ Apply 10 percent capacity reduction

▪ Maximum input capacity of 176,000 Btu/h (51 535 W)

▪ [176,000 x .90] = 158,400 Btu/h (46 381 W)

▪ 158,400 Btu > 135,000 Btu/h (46 381 W > 39 529 W)

▪ Boiler exceeds minimum required input of 59,000 Btu/h

(17 276 W) in Table 504.2(1)

118Copyright 2009, International Code Council

(A/B × C) + D

(2.5/5 × 30) + 195 =

1/2 × 30) + 195 =

15 + 195 = 210

Workbook Page 119

Page 119: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Offsets

119Copyright 2009, International Code CouncilWorkbook Page 122

Page 120: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Step 10 - Seven Times Rule

Flow area of vertical vent must not be larger

than seven times the area of the smallest

appliance vent connection.

120Copyright 2009, International Code CouncilWorkbook Page 123

Page 121: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Appliance Venting

1. Check sizing of category I appliance venting systems.

IFGC Section504.2.2.

2. Check sizing of venting systems for a single appliance.

IFGC Section 504.2.2.

3. Check minimum size.

IFGC Section 504.2.2 (1-5).

4. Check vent offsets.

IFGC 504.2.3.

121Copyright 2009, International Code CouncilWorkbook Page 124-125

Page 122: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Appliance Venting

5. Check multiple input rate appliances.

IFGC 504.2.6.

6. Check chimney and vent locations.

IFGC 504.2.9.

7. Check liner system sizing.

IFGC 504.2.7.

8. Check vent area and diameter.

IFGC Section 504.2.8.

122Copyright 2009, International Code CouncilWorkbook Page 126

Page 123: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Appliance Venting

9. Check table interpolation.

IFGC Table 504.3 (1) and 504.3 (2).

10. Check sizing of a venting system for two of more

appliances.

IFGC Table 504.3 (1) through 504.3 (7).

11. Check height and rise measurement.

IFGC Table 504.3 (1) through 504.3 (7).

12. Check vent fittings.

IFGC Section 504.3.17.123Copyright 2009, International Code Council

Workbook Page 127-132

Page 124: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Table Interpolation

IFGC Table 504.2(1)

▪ Vent type is Type B from

furnace connection to

terminal

▪ Input rating of draft hood

furnace = 210,000 Btu/h (61

545 W)

▪ Vertical design height of

vent = 121/2 feet (3810 mm)

▪ Diameter of vent = 6 inches

(152 mm)

▪ Length of lateral = 2 feet

(610 mm)

124Copyright 2009, International Code CouncilWorkbook Page 128

Page 125: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Table Interpolation

IFGC Table 504.2(1)

A. Find the maximum vent capacity (MAX) at the

first height entry greater than 121/2 feet (3810

mm), [i.e., 15 feet (4572 mm)].

225

B. Find the maximum vent capacity (MAX) at the

next height entry lower than 121/2 feet (3810

mm), [i.e., 10 feet (3048 mm)].

195

125Copyright 2009, International Code CouncilWorkbook Page 128

Page 126: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Table Interpolation

IFGC Table 504.2(1)

C. Determine the difference between the two maximum vent

capacities.

330

D. Determine the maximum vent capacity for a 121/2-foot-

high (3810 mm) vent.

126Copyright 2009, International Code Council

(A/B × C) + D

(2.5/5 × 30) + 195

(1/2 × 30) + 195

15 + 195 = 210

Workbook Page 128

Page 127: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing Type B Vent System

127Copyright 2009, International Code CouncilWorkbook Page 131

Page 128: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing Type B Vent System

A. Find each connector size:

a. Select correct table:

Table number: ____________________

b. Determine the least total height of vent and the rise for

each connector.

Vent height: ____________________

Water heater rise: ____________________

Furnace rise: ____________________

c. Determine the vent connector size per the applicable

table:

Water heater: ____________________

Furnace: ____________________128Copyright 2009, International Code Council

504.3(1)

15 feet (4572 mm)

1 foot (305 mm)

3 feet (914 mm)

4 inch (102 mm)

5 inch (127 mm)

Workbook Page 133

Page 129: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing Type B Vent System

B. Find common vent size:

a. Determine the total Btu/h input:

Combined input rating: ____________________

b. Using the common vent portion of the same table used

to size the connectors, determine the size of the

common vent.

Size of common vent: ____________________

129Copyright 2009, International Code Council

140,000 Btu/h (40,994 W)

5 inch (127 mm)

Workbook Page 133

Page 130: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Appliance Venting

13. Check vent terminations.

IFGC Section 503.6.4 and Table 503.6.4.

14. Check multistory installations.

IFGC Section503.6.10.

15. Check direct-vent, integral vent, mechanical vent and

ventilation/ exhaust hood venting.

IFGC Section 505

130Copyright 2009, International Code CouncilWorkbook Page 135-146

Page 131: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

131Copyright 2009, International Code Council

455'

6'

12

18

Gas Vent Termination

▪ Determine which diagram shows correct vent

termination requirement

CorrectIncorrect,

[needs 7'6" (2286 mm)]

Workbook Page 137

Page 132: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Venting Systems

▪ Given the following information, size the entire

venting system.

▪ Water heater- 40,000 Btu/h (11,717 W)

Natural Draft

3-inch (76 mm) Draft hood

▪ Furnace 80,000 Btu/h (23,425 W)

Fan Assisted

4-inch (102 mm) Flue Collar

132Copyright 2009, International Code CouncilWorkbook Page 138

Page 133: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Venting Systems

Work the problem here.

A. Diameter for the water heater connector.

4 inches

B. Diameter for the furnace connector.

4 inches

C. Percent capacity reduction for common vent.

20 percent, Sections 504.3.5 and 505.3.6

133Copyright 2009, International Code CouncilWorkbook Page 138

Page 134: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Venting Systems

Work the problem here.

D. Diameter of common vent.

5 inches, (159,000 Btu/h ´ 0.80 = 127,200 Btu/h)

(46,557 W × 0.80 = 37,245.6 W)]

E. Maximum allowable horizontal connector length.

6 feet (1829 mm) or in accordance with Sections

504.3.2 and 503.10.9 the MAX Length allowed is

12.75' (3886 mm) [75% × 17' (5182 mm) =

12.75 (75% × 5182 = 3886)]134

Copyright 2009, International Code Council

Workbook Page 138

Page 135: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Venting Systems

Work the problem here.

F. Maximum allowable length of common vent

offset.

7.5 (191 mm)

G. Is interpolation necessary?

No

135Copyright 2009, International Code CouncilWorkbook Page 138

Page 136: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

136Copyright 2009, International Code Council

Sizing of Venting Systems for Two or

More Appliances

Workbook Page 141

Page 137: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing of Venting Systems for Two

or More Appliances

▪ Determine the venting system sizing for the two

appliances.

▪ Find the size of the common vent based on

least total height and the combination of

connected appliances

137Copyright 2009, International Code CouncilWorkbook Page 141

Page 138: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing of Venting Systems for Two or

More Appliances

Consider the system to have the following characteristics:

▪ A two-appliance FAN + NAT system, combining a water

heater (NAT) equipped with a draft hood with a fan-

assisted Category I furnace (FAN).

▪ Single-wall pipe connectors are used.

▪ Vent height is 35 feet (10 668 mm).

▪ Furnace connector rise is 4 feet (1219 mm).

▪ Water heater connector rise is 2 feet (610 mm).

▪ Furnace input is 75,000 Btu/h (21,961 W).

▪ Water heater input is 42,000 Btu/h (12,298 W).

138Copyright 2009, International Code CouncilWorkbook Page 141

Page 139: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing of Venting Systems for Two or

More Appliances

A. Furnace Connector

Material:

Size:

B. Water Heater

Connector Material:

Size:

C. Common Vent Size:

▪ Type B

▪ 4 inches, [Table 504.3(1)]

▪ Single-wall

▪ 4 inches, [Table 504.3(2)]

▪ 4 inches (102 mm) [10%

reduction for offset, 132,000

Btu/h × 0.9 = 118,800

Btu/h (38,651 W × 0.9 =

34,785.9 W)]139Copyright 2009, International Code Council

Workbook Page 142

Page 140: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Sizing of Venting Systems for Two

or More Appliances

D. Interpolation Necessary? No

E. Any Noted Violations?

140Copyright 2009, International Code CouncilWorkbook Page 142

Page 141: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Common Vent Sizing For Two or More

Appliances

▪ Workbook page 143

▪ In groups of 3-4

▪ Answer the A through M

141Copyright 2009, International Code CouncilWorkbook Page 143

Page 142: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING INSPECTIONS

OF EXHAUST SYSTEMS

Module 9

1422009 IMC® Fundamentals

Page 143: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Six Tasks

1. Inspect for required systems compliance.

IMC Section 502.

2. Inspect motors and fans.

IMC Section 503.

3. Inspect clothes dryer exhaust. IMC Section 504.

4. Inspect commercial kitchen exhaust systems.

IMC Section 506 through 509.

5. Inspect hazardous exhaust systems.

IMC Section 510.

6. Inspect energy recovery ventilation systems.

IMC Section 514.

143Copyright 2009, International Code CouncilWorkbook Page 147

Page 144: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect for Required Systems

Compliance

1. Check exhaust location.

IMC Section 501.2.1 and 5502.1.1.

2. Check areas requiring exhaust systems.

IMC Section501.1

3. Check for recirculation.

IMC Table 403.3.

4. Check termination points.

IMC Section 501.2.1.

144Copyright 2009, International Code Council

Workbook Page 149-150

Page 145: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Motors and Fans

1. Check sizes.

IMC Section 503.1.

2. Check fan protection.

IMC Section 503.2.

3. Check fans in areas with corrosives.

IMC Section 503.4.

4. Check for required Fan Interlocks.

IMC Section 503

145Copyright 2009, International Code CouncilWorkbook Page 151

Page 146: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Clothes Dryer Exhaust

1. Check installation.

IMC Section 504.1.

2. Check exhaust penetrations.

IMC Section 504.2.

3. Check exhaust installation.

IMC Section 504.4.

146Copyright 2009, International Code CouncilWorkbook Page 152-153

Page 147: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Multiple Dryer Installation

147Copyright 2009, International Code CouncilWorkbook Page 152-153

Page 148: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Commercial Kitchen

Exhaust Systems

1. Check for the presence of exhaust systems where required.

IMC Section507.2, 507.2.1, 507.2.1.1 and 507.2.2

2. Check grease duct clearances.

IMC Section 506.3.6

3. Check grease duct enclosure.

IMC Section 506.3.10, 506.3.10.1, 506.3.10.2 and

506.3.10.3.

4. Check terminations through an exterior wall, if present.

IMC Section 506.3.3.12.2.

148Copyright 2009, International Code CouncilWorkbook Page 154-155

Page 149: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Termination Through Exterior Wall

149Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 154-155

Page 150: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Commercial Kitchen

Exhaust Systems

5. Check ducts.

IMC Section 506.1 through 506.3, 506.3.1, 506.3.1.1,

506.3.1.2 and 506.3.2.

6. Check type I hoods.

IMC Section 507.2.1.

7. Check type II hoods.

IMC Section 507.2.2.

8. Check type I and II materials.

IMC Section 507.4 and 507.5.

150Copyright 2009, International Code CouncilWorkbook Page 155-156

Page 151: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Commercial Kitchen

Exhaust Systems

9. Check capacity of the hoods.

IMC Section 507.13.

10. Check fuel burning appliances.

IMC Section 507.3.

11. Check commercial kitchen makeup air.

IMC Section 508.

12. Verify or observe the capture and containment test.

IMC Section 507.16.1.

151Copyright 2009, International Code CouncilWorkbook Page-156-157

Page 152: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Canopy Hood - Elevation

152Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 156

Page 153: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Canopy Hoods

153Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 156-157

Page 154: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Back-To-Back Type Canopy Hood

154Copyright 2009, International Code Council

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 156-157

Page 155: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Makeup Air Supplied to Hood

155Copyright 2009, International Code CouncilWorkbook Page 156-157

Page 156: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Hazardous Exhaust

System

1. Check for hazardous exhaust systems where required.

IMC Section 510.2.

2. Check design.

IMC Section 510.3.

3. Check operation.

IMC Section 510.3.

156Copyright 2009, International Code CouncilWorkbook Page 158

Page 157: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 6: Inspect Energy Recovery

Ventilation Systems

1. Check IECC compliance, if necessary.

IMC Section 514.1.

2. Check if installation is allowed.

IMC Section 514.2.

157Copyright 2009, International Code CouncilWorkbook Page 159

Page 158: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING INSPECTIONS

OF DUCTS AND PLENUMS

Module 10

Page 159: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Six Tasks

1. Inspect egress

elements.

IMC Section 601.2.

2. Inspect plenums.

IMC Section 602.

3. Inspect duct

construction and

installation.

IMC Section 603.

4. Inspect insulation.

IMC Section 604.

5. Inspect smoke

detection systems

control.

IMC Section 606.

6. Inspect ducts and air

transfer openings.

IMC Section 607.

159Copyright 2009, International Code CouncilWorkbook Page 161

Page 160: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect Egress Elements

1. Check air movement in egress elements.

IMC Section 601.2.

2. Check the corridor ceiling.

IMC Section 601.2.1.

3. Check the exit enclosure for compliance.

IMC Section 601.3.

4. Check for the air movement in egress situations.

160Copyright 2009, International Code CouncilWorkbook Page 162-163

Page 161: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Inspect Plenums

1. Check locations of supply, return, exhaust, relief and

ventilation air plenums.

IMC Section 602.1.

2. Check plenum construction.

IMC Section 602.2.

3. Check materials exposed within plenums.

IMC Section 602.2..1.

4. Check stud cavity and joist space plenums.

IMC Section 602.3.

5. Check for flood hazard.

IMC Section 602.4. 161Copyright 2009, International Code Council

Workbook Page 164-165

Page 162: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Typical Floor/Ceiling Return and

Plenum

162Copyright 2009, International Code CouncilWorkbook Page 164-165

Page 163: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Mechanical Room Used as Return Air

Plenum

163Copyright 2009, International Code CouncilWorkbook Page 164-165

Page 164: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Acceptable Stud and Joist Space

Plenum Installation

164Copyright 2009, International Code CouncilWorkbook Page 164-165

Page 165: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Unacceptable Stud and Joist Space

Plenum Installation

165Copyright 2009, International Code CouncilWorkbook Page 164-165

Page 166: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Duct Construction and

Installation

1. Check duct sizing.

IMC Section 603.2.

2. Check duct classification.

IMC Section 603.3.

3. Check metallic ducts.

IMC Section 603.4.

4. Check nonmetallic ducts.

IMC Section 603.5.

166Copyright 2009, International Code CouncilWorkbook Page 166-167

Page 167: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Duct Construction and

Installation

5. Check flexible air ducts and flexible air connections.

IMC Section 603.6.

6. Check underground ducts.

IMC Section 603.8.

7. Check duct joints and supports.

IMC Section 603.9 and 603.10.

8. Check furnace connections.

IMC Section 603.11.

167Copyright 2009, International Code CouncilWorkbook Page 167-168

Page 168: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Flexible Connector

168Copyright 2009, International Code CouncilWorkbook Page 167-168

Page 169: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Duct Construction and

Installation

9. Check condensation.

IMC Section 603.12.

10. Check location.

IMC Section 603.14.

11. Check for protection.

IMC Section 603.15 and 603.16.

12. Check registers, grilles and diffusers.

IMC Section 603.17.

169Copyright 2009, International Code CouncilWorkbook Page 168-169

Page 170: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Insulation

1. Check for IECC compliance.

IMC Section 604.1.

2. Check surface temperature.

IMC Section 604.2.

3. Check coverings and linings.

IMC Section 604.3.

4. Check foam plastic insulation.

IMC Section 604.4.

170Copyright 2009, International Code CouncilWorkbook Page 170-171

Page 171: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Duct Coverings

171Copyright 2009, International Code CouncilWorkbook Page 170-171

Page 172: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Insulation

5. Check appliance testing and labeling.

IMC Section 604.5.

6. Check penetration of assemblies.

IMC Section 604.6.

7. Check identification.

IMC Section 604.7.

8. Check lining installation.

IMC Section 604.8.

172Copyright 2009, International Code CouncilWorkbook Page 171

Page 173: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Insulation

9. Check for thermal

continuity.

IMC Section 604.9.

10. Check service openings.

IMC Section 604.10.

11. Check vapor retarders.

IMC Section 604.11.

12. Check weatherproof

barriers.

IMC Section 604.12.

13. Check internal insulation.

IMC Section 604.13.

173Copyright 2009, International Code CouncilWorkbook Page 171-172

Page 174: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Smoke Detection

Systems Control

1. Check that required controls are present.

IMC Section 606.1.

2. Check location of controls.

IMC Section 606.2.

3. Check installations.

IMC Section 606.3.

4. Check controls operation.

IMC Section 606.4.

174Copyright 2009, International Code CouncilWorkbook Page 173-174

Page 175: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Duct Smoke Detectors

175Copyright 2009, International Code CouncilWorkbook Page 173-174

Page 176: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Return Riser

176Copyright 2009, International Code CouncilWorkbook Page 173-174

Page 177: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 6: Inspect Ducts and Air Transfer

Openings

1. Check installation. IMC Section 607.2.

2. Verify damper testing and ratings. IMC Section 607.3.

3. Check location requirements. IMC Section 607.5.

4. Check horizontal assemblies. IMC Section 607.6.

5. Check Membrane penetrations. IMC Section 607.6.2.

6. Check flexible ducts and air connectors.IMC Section 607.7.

177Copyright 2009, International Code CouncilWorkbook Page 175-176

Page 178: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

PERFORMING REFRIGERATION

INSPECTIONS

Module 11

Page 179: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Three Tasks

1. Inspect for general requirements compliance.

IMC Section 1102.1.

2. Inspect classification.

IMC Section 1102.2 and Table 1103.3 and 1103.

3. Inspect machinery room.

IMC Section 1104.2.

179Copyright 2009, International Code CouncilWorkbook Page 177

Page 180: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect for General

Requirements Compliance

1. Check factory-built equipment and appliances. IMC Section 1101.2.

2. Check for protection. IMC Section 1101.3.

3. Check water connection. IMC Section 11041.4.

4. Check fuel gas connection. IMC Section 1101.5.

180Copyright 2009, International Code CouncilWorkbook Page 178

Page 181: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect for General

Requirements Compliance (cont)

5. Check for changes in refrigerant type. IMC Section 1101.8.

6. Looking for access port caps. IMC Section 1101.10.

7. Verify field test. IMC Section 1108.

181Copyright 2009, International Code CouncilWorkbook Page 179

Page 182: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Determine Classification

1. Determine the refrigeration system’s classification.

IMC Section 1102.1 and 1103.1.

2. Determine the refrigerant classification.

IMC Section 1102.2 and Table 1103.1.

3. Determine the maximum allowable quantity of refrigerant.

IMC Table1103.1.

4. Determine the system enclosure requirements.

IMC Section 1103.3, 1103.3.1 and 1102.3.2.

5. Check refrigeration equipment location and installation.

IMC Section 1105 and 1106.

182Copyright 2009, International Code CouncilWorkbook Page 180-185

Page 183: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Low-Probability Systems

183Copyright 2009, International Code CouncilWorkbook Page 180-185

Page 184: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

High-Probability Systems

184Copyright 2009, International Code CouncilWorkbook Page 180-185

Page 185: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Machinery Room

1. Check refrigerant detector. IMC Section 1105.3.

2. Check fuel-burning appliances. IMC Section 1105.5.

3. Check rate for normal ventilation. IMC Section 1105.6.

4. Check quantity for emergency conditions. IMC Section 1105.6.4.

5. Check for compliance with special requirements. IMC Section 1106.

6. Refrigerant piping. IMC Section 1107.

185Copyright 2009, International Code CouncilWorkbook Page 186-187

Page 186: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

GAS PIPING INSTALLATIONS

Module 12

Page 187: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Five Tasks

1. Inspect for proper identification.

IFGC Section 401.5.

2. Review gas piping system plan.

3. Inspect piping materials.

IFGC Section 403.

4. Inspect piping system installation.

IFGC Section 404.

5. Inspect gas flow controls.

IFGC Section 410.

187Copyright 2009, International Code CouncilWorkbook Page 189

Page 188: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 1: Inspect for Proper Identification

1. Check exposed gas piping. IFGC Section 403.8.

2. Check multiple meter installations. IFGC Section 401.7.

188Copyright 2009, International Code CouncilWorkbook Page 190

Page 189: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 2: Review Gas Piping System Plan

1. Determine maximum gas demand.

IFGC Section 402.2.

2. Determine length to most remote outlet.

IFGC Section 402.4.1 and 402.4.2.

3. Select the correct table.

IFGC Table 402.4 (1)-(35).

4. Locate gas-demand figures.

IFGC Table 402.4 (1)-(35).

5. Locate nominal size of pipe required.

IFGC Table 402.4 (1)-(35).

189Copyright 2009, International Code CouncilWorkbook Page 191

Page 190: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

A Gas Piping System Plan

190Copyright 2009, International Code CouncilWorkbook Page 193

Page 191: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas System Sizing Problem

191Copyright 2009, International Code Council

Outlet B40-gal Water Heater45,000 Btu/hr Outlet AClothes Dryer20,000 Btu/hr

Point ofDelivery Outlet C Range73,000 Btu/hr

Outlet DFurnace133,000 Btu/hr

15 ft15 ft20 ft

10 ft

25 ft

12 ft

5 ft 5 ftSection 4 Section 3 Section 2 15 ftSec tion 1Section 5

Outlet B40-gal Water Heater45,000 Btu/hr Outlet AClothes Dryer20,000 Btu/hr

Point ofDelivery Outlet C Range73,000 Btu/hr

Outlet DFurnace133,000 Btu/hr

15 ft15 ft20 ft

10 ft

25 ft

12 ft

5 ft 5 ftSection 4 Section 3 Section 2 15 ftSec tion 1Section 5

Outlet B40-gal Water Heater45,000 Btu/hr Outlet AClothes Dryer20,000 Btu/hr

Point ofDelivery Outlet C Range73,000 Btu/hr

Outlet DFurnace133,000 Btu/hr

15 ft15 ft20 ft

10 ft

25 ft

12 ft

5 ft 5 ftSection 4 Section 3 Section 2 15 ftSec tion 1Section 5

Outlet B40-gal Water Heater

45,000 Btu/hr

Outlet AClothes Dryer20,000 Btu/hr

Point ofDelivery

Outlet C Range73,000 Btu/hr

Outlet DFurnace

133,000 Btu/hr

15 ft15 ft

20 ft

10 ft

25 ft

12 ft

5 ft 5 ft

Section 4 Section 3

Section 215 ft

Sectio

n 1

Section 5

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 195

Page 192: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas System Sizing Problem

1. Determine maximum gas demand:

Outlet A: 20 cfh (0.57m3/hr)

Outlet B: 45 cfh (1.27m3/hr)

Outlet C: 73 cfh (2.07m3/hr)

Outlet D: 133 cfh (3.76m3/hr)

Maximum gas demand: 271 cfh (7.86m3/hr)

192Copyright 2009, International Code CouncilWorkbook Page 195

Page 193: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas System Sizing Problem

2. Determine length to the most remote outlet:

Section 1: 15 ft. (4572 mm)

Section 2: 25 ft. (7620 mm)

Section 3: 5 ft. (1524 mm)

Section 4: 5 ft. (1524 mm)

Section 5: 30 ft. (9144 mm)

Total pipe length to most remote outlet: 80 ft.

(24 384 mm)

193Copyright 2009, International Code CouncilWorkbook Page 196

Page 194: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas System Sizing Problem

3. Select applicable table:

Specific gravity: 0.60

Gas pressure: 10 IN WC (254 mm)

Pressure drop: 0.5 IN WC (12.7 mm)

Type of material: Steel Pipe

Special conditions: NA

Table Used: 402.4(2)

194Copyright 2009, International Code CouncilWorkbook Page 196

Page 195: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas System Sizing Problem

4. Locate gas demand figures:

▪ Horizontal row showing length of piping

▪ Indicates length from point of delivery to most remote outlet

▪ If not exact, use next longer distance

▪ Use this row for all gas demand figures

195Copyright 2009, International Code CouncilWorkbook Page 196

Page 196: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas System Sizing Problem

5. Locate nominal size of pipe required:

▪ Outlet C:

▪ 73 cfh requires 3/4 inch pipe

▪ (2.07 m3/hr requires 19.1 mm)

▪ Outlet D:

▪ 133 cfh requires 1 inch pipe

▪ (3.76 m3/hr requires 25.4mm)

▪ Pipe Section 4 (A,B,C):

▪ 138 cfh requires 1 inch pipe

▪ (3.91 m3/hr requires 25.4mm)

▪ Pipe Section 5 (A,B,C,D):

▪ 271 cfh requires 1 ¼ inch pipe

▪ (7.67 m3/hr requires 31.8mm)

196Copyright 2009, International Code CouncilWorkbook Page 196

Page 197: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Branch Length Method

▪ Determine the size of gas piping

sections

197Copyright 2009, International Code CouncilWorkbook Page 197

Page 198: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Branch Length Method

198Copyright 2009, International Code Council

GAS GRILL

20 MBH

CSST

20’ F

RANGE

60 MBH WATER

HEATER

40 MBH

FURNACE 75

MBH

CLOTHES DRYER 35

MBH (MBH = 1,000 Btu/h)

SCHEDULE 40 STEEL

TRUNKLINE

LONGEST RUN

15’J 15’I 15’G

H 20’

POINT OF

DELIVERY

SPECIFIC

GRAVITY

0.60

A

10’

B

10’

D15’

E5’

C25’

ALL BRANCHES

CSST

9” WC

PRESSURE

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm

Workbook Page 197

Page 199: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Branch Length Method

▪ Determine the size of trunk line sections

▪ Determine load for each section of pipe

▪ A = 230 MBH

▪ B = 170 MBH

▪ C = 135 MBH

▪ D = 95 MBH

▪ E = 20 MBH

▪ Determine the table to use = 402.4(2)

▪ Because longest run length of pipe is between

rows, use next higher row.

199Copyright 2009, International Code CouncilWorkbook Page 198

Page 200: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Branch Length Method

▪ Determine the size of trunk line sections

▪ Determine size for each section of pipe

▪ A = 1 ¼ inch (31.8 mm)

▪ B = 1 inch (25.4 mm)

▪ C = 1 inch (25.4 mm)

▪ D = ¾ inch (19.1 mm)

▪ E = 3/8 inch (9.5 mm)

200Copyright 2009, International Code CouncilWorkbook Page 198

Page 201: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

▪ Determine the load for the following branch

sections

▪ Section F: 20 cfh (0.71 m3/hr)

▪ Section G: 60 cfh (1.7 m3/hr)

▪ Section H: 35 cfh (0.99 m3/hr)

▪ Section I: 40 cfh (1.13 m3/hr)

▪ Section J: 75 cfh (2.12 m3/hr)

201Copyright 2009, International Code CouncilWorkbook Page 201

Page 202: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

▪ Determine the length for each branch

▪ Section F: 85 ft. (25 908 mm)

▪ Section G: 25 ft. (7620 mm)

▪ Section H: 40 ft. (12 192 mm)

▪ Section I: 60 ft. (18 288 mm)

▪ Section J: 75 ft. (22 860 mm)

▪ Determine the table to use

▪ Table 402.4(13)

202Copyright 2009, International Code CouncilWorkbook Page 201

Page 203: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

▪ Determine the size for each section of gas pipe.

203Copyright 2009, International Code Council

Pipe Section Length (ft.) Load (MBH) Size

F 85 20 18

G 25 60 19

H 40 35 18

I 60 40 23

J 75 75 30

Workbook Page 201

Page 204: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

204Copyright 2009, International Code Council

9 INCHES

WC

METER

SERVICE

REGULATOR

5 PSIG

A

90’

SCHEDULE 40 STEEL PIPING THROUGHOUT

RTU

1

200 MBH

10’ B

“POUNDS-TO-INCHES” REGULATORS

10’ D

RTU

2150 MBH

I

20’

F

40’

C

75’

RTU

3

RTU

4

H 15’

J 15’

E 25’

10’ G

125 MBH

150 MBH

9 INCHES

WC

Workbook Page 202

Page 205: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

Parallel System – 6” WC

205Copyright 2009, International Code CouncilWorkbook Page 205

Page 206: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

▪ Required Size (CSST)

▪ A 37

▪ B 25

▪ C 19

▪ D 23

▪ E 23

▪ F 18

▪ G 18

206Copyright 2009, International Code CouncilWorkbook Page 205

Page 207: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

Medium Pressure System

207Copyright 2009, International Code CouncilWorkbook Page 207

Page 208: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

▪ Required Size (CSST)

▪ A 18

▪ B 15

▪ C 13

▪ D 13

▪ E 15

▪ F 13

▪ G 13

208Copyright 2009, International Code CouncilWorkbook Page 207

Page 209: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

Branch Length Method

209Copyright 2009, International Code CouncilWorkbook Page 211

Page 210: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Check Your Learning: Answers

▪ Required Size (Schedule

40)

▪ A 1 ¼” (31.8 mm)

▪ B 1 ¼” (31.8 mm)

▪ C 1” (25.4 mm)

▪ D 1” (25.4 mm)

▪ E ¾” (19.1 mm)

▪ F ¾” (19.1 mm)

▪ G 1/2” (12.7 mm)

210Copyright 2009, International Code Council

• Required Size (CSST)

– H 13

– I 23

– J 15

– K 18

– L 15

– M 18

– N 13

Workbook Page 211

Page 211: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

211Copyright 2009, International Code CouncilWorkbook Page 212

Page 212: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 3: Inspect Piping Materials

1. Check corrugated stainless steel tubing.

IFGC Section 403.5.4.

2. Check plastic tubing.

IFGC Section 403.11.

3. Check copper tubing.

IFGC Section 403.5.2.

4. Check protective coating and wrapping.

IFGC Section 403.8.

5. Check number and length of threads.

IFGC Section 403.9.

212Copyright 2009, International Code CouncilWorkbook Page 213-215

Page 213: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Piping System Installation

1. Check prohibited location. IFGC Section 404.1.

2. Check piping in concealed locations. IFGC Section 404.3.

3. Check piping through foundation walls is prohibited, underground penetration prohibited. IFGC Section 404.4.

4. Check protection against physical damage. IFGC Section 404.5.

5. Check piping in solid floors. IFGC Section 404.6, 404.6.1 and 404.6.2.

213Copyright 2009, International Code CouncilWorkbook Page 216-217

Page 214: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Piping Through Foundation Wall

214Copyright 2009, International Code CouncilWorkbook Page 216-217

Page 215: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Alternative Piping Through Solid Floors

215Copyright 2009, International Code CouncilWorkbook Page 216-217

Page 216: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 4: Inspect Piping System Installation

6. Check minimum burial depth.

IFGC Section 404.10.

7. Check individual outdoor appliances.

IFGC Section 404.10.1.

8. Check inspection, testing and purging.

IFGC Section 406.

9. Check appliance isolation.

IFGC Section 406.3.2.

10. Inspect gas flow control.

IFGC Section 410.

216Copyright 2009, International Code CouncilWorkbook Page 218-220

Page 217: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas Flow Controls

217Copyright 2009, International Code CouncilWorkbook Page 218-220

Page 218: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas Flow Controls

218Copyright 2009, International Code CouncilWorkbook Page 218-220

Page 219: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Gas Pressure Regulator

219Copyright 2009, International Code CouncilWorkbook Page 218-220

Page 220: Performing Commercial Mechanical Plan Reviews · Performing Commercial Mechanical Plan Reviews ... Workbook Page 22. PERFORMING APPLIANCE INSPECTIONS Module 3. Performing Appliance

Task 5: Inspect Gas Flow Controls

1. Check MP regulators.

IFGC Section 410.2.

2. Check venting regulators.

IFGC Section 410.3.

3. Check appliance connections.

IFGC Section 411.1.

4. Check protection from damage.

IFGC Section 411.1.2.

5. Check movable appliances.

IFGC Section 411.1.4.

220Copyright 2009, International Code CouncilWorkbook Page 221-223