1 Performance Verification of Linear Fresnel on the Example of PE2 Joint Saudi-German CSP Research Workshop 19.12.2013

Upload: phamhuong

Post on 19-Jan-2019

228 views

Category:

Documents


0 download

TRANSCRIPT

1

Performance Verification of Linear

Fresnel on the Example of PE2

Joint Saudi-German CSP Research

Workshop 19.12.2013

PE2 - World’s first utility-scale power station based on linear

Fresnel technology

Sucessful Markt Introduction of a new

and cost competitive CSP Technology by

in close R&D Collaboration with

Overview on NOVATEC SOLAR´s CSP Plant PE1 and PE2

3

Puerto Errado 2 (PE2)

30MWel commercial plant

In operation since 2012:

Mirror surface of 300,000m²

Puerto Errado 1 (PE1)

9MWth/1.4MWel test plant

In operation since 2009

Mirror surface of 18,000m²

Supernova Demonstrator

In operation since 2011:

Demonstrates superheated

steam generation at 550°C

DMS Demonstrator

Realization scheduled for 2013

Will demonstrate direct molten

salt as heat transfer fluid

confidential

Puerto Errado 2 Project Overview

Project Stakeholders

Project

Company

PE2

EPC Contractor

Off-taker

Lenders

Owner (5 Swiss utilities)

Lenders Advisors

O&M Contractor

Owner’s Technical Advisor

85 %

4 confidential

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for Project Site

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for PE2 site

Apr 08 Performance Verification of NOVA-1

Technology (270°C, 55 bar direct solar

steam) at PE1

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for PE2 site

Apr 08 Performance Verification of NOVA-1

Technology (270°C, 55 bar direct solar

steam) at PE1

Jun 08 Computer modeled Net Energy Yield

Calculations for PE2

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for PE2 site

Apr 08 Performance Verification of NOVA-1

Technology (270°C, 55 bar direct solar

steam) at PE1

Jun 08 Computer modeled Net energy Yield

Calculations for PE2

Jun 08 Performance Verification of

NOVATEC´s Cleaning Machines

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for PE2 site

Apr 08 Performance Verification of NOVA-1

Technology (270°C, 55 bar direct solar

steam) at PE1

Jun 08 Computer modeled Net energy Yield

Calculations for PE2

Jun 08 Performance Verification of NOVATEC´s

cleaning machines

Nov 11 Performance Verification of

NOVATEC´s High Temperature

SUPERNOVA Technology (>500°C)

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for PE2 site

Apr 08 Performance Verification of NOVA-1

Technology (270°C, 55 bar direct solar

steam) at PE1

Jun 08 Computer modeled Net energy Yield

Calculations for PE2

Jun 08 Performance Verification of NOVATEC´s

cleaning machines

Nov 11 Performance Verification of NOVATEC´s

High Temperature SUPERNOVA

Technology (>500°C)

Jul 12 Verification of PE2 solar field

performance during PAT

Verification Process of NOVATEC SOLAR´s Technology by DLR

confidential

DLR contribution

Jan 08 DNI data Verification for PE2 site

Apr 08 Performance Verification of NOVA-1

Technology (270°C, 55 bar direct solar

steam) at PE1

Jun 08 Computer modeled Net energy Yield

Calculations for PE2

Jun 08 Performance Verification of NOVATEC´s

cleaning machines

Nov 11 Performance Verification of NOVATEC´s

High Temperature SUPERNOVA

Technology (>500°C)

Jul 12 Verification of PE2 solar field

performance during PAT

Jul 13 DNI verification during PE2 Final

Acceptance Tests

Conclusions

Power Demand of KSA requires on a mid term further CSP Technology

Development towards low Cost & Base Load Solar Power Generation

Applying the proven Concept of close Collaboration of R&D Entities and

the CSP Industry is the Key Success Factor for reaching this Target