Performance Verification of Linear
Fresnel on the Example of PE2
Joint Saudi-German CSP Research
Workshop 19.12.2013
PE2 - World’s first utility-scale power station based on linear
Fresnel technology
Sucessful Markt Introduction of a new
and cost competitive CSP Technology by
in close R&D Collaboration with
Overview on NOVATEC SOLAR´s CSP Plant PE1 and PE2
3
Puerto Errado 2 (PE2)
30MWel commercial plant
In operation since 2012:
Mirror surface of 300,000m²
Puerto Errado 1 (PE1)
9MWth/1.4MWel test plant
In operation since 2009
Mirror surface of 18,000m²
Supernova Demonstrator
In operation since 2011:
Demonstrates superheated
steam generation at 550°C
DMS Demonstrator
Realization scheduled for 2013
Will demonstrate direct molten
salt as heat transfer fluid
confidential
Puerto Errado 2 Project Overview
Project Stakeholders
Project
Company
PE2
EPC Contractor
Off-taker
Lenders
Owner (5 Swiss utilities)
Lenders Advisors
O&M Contractor
Owner’s Technical Advisor
85 %
4 confidential
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for Project Site
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for PE2 site
Apr 08 Performance Verification of NOVA-1
Technology (270°C, 55 bar direct solar
steam) at PE1
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for PE2 site
Apr 08 Performance Verification of NOVA-1
Technology (270°C, 55 bar direct solar
steam) at PE1
Jun 08 Computer modeled Net Energy Yield
Calculations for PE2
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for PE2 site
Apr 08 Performance Verification of NOVA-1
Technology (270°C, 55 bar direct solar
steam) at PE1
Jun 08 Computer modeled Net energy Yield
Calculations for PE2
Jun 08 Performance Verification of
NOVATEC´s Cleaning Machines
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for PE2 site
Apr 08 Performance Verification of NOVA-1
Technology (270°C, 55 bar direct solar
steam) at PE1
Jun 08 Computer modeled Net energy Yield
Calculations for PE2
Jun 08 Performance Verification of NOVATEC´s
cleaning machines
Nov 11 Performance Verification of
NOVATEC´s High Temperature
SUPERNOVA Technology (>500°C)
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for PE2 site
Apr 08 Performance Verification of NOVA-1
Technology (270°C, 55 bar direct solar
steam) at PE1
Jun 08 Computer modeled Net energy Yield
Calculations for PE2
Jun 08 Performance Verification of NOVATEC´s
cleaning machines
Nov 11 Performance Verification of NOVATEC´s
High Temperature SUPERNOVA
Technology (>500°C)
Jul 12 Verification of PE2 solar field
performance during PAT
Verification Process of NOVATEC SOLAR´s Technology by DLR
confidential
DLR contribution
Jan 08 DNI data Verification for PE2 site
Apr 08 Performance Verification of NOVA-1
Technology (270°C, 55 bar direct solar
steam) at PE1
Jun 08 Computer modeled Net energy Yield
Calculations for PE2
Jun 08 Performance Verification of NOVATEC´s
cleaning machines
Nov 11 Performance Verification of NOVATEC´s
High Temperature SUPERNOVA
Technology (>500°C)
Jul 12 Verification of PE2 solar field
performance during PAT
Jul 13 DNI verification during PE2 Final
Acceptance Tests
Conclusions
Power Demand of KSA requires on a mid term further CSP Technology
Development towards low Cost & Base Load Solar Power Generation
Applying the proven Concept of close Collaboration of R&D Entities and
the CSP Industry is the Key Success Factor for reaching this Target