performance measures & planning process · underlying planning process. performance‐driven,...
TRANSCRIPT
![Page 1: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/1.jpg)
2040 Long Range Transportation Plan & Project Priority List
Performance Measures & Planning Process
![Page 2: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/2.jpg)
Underlying Planning Process
PERFORMANCE‐DRIVEN, OUTCOME‐BASED APPROACH TO PLANNING: 450.306(a)
The MPO, in cooperation with the State and public transportation operators, shall develop LRTPs and TIPs through a performance driven, outcome‐based approach to planning for metropolitan areas of the State that meet the Federal Planning Factors.
Performance Measures and
Indicators
Long Range Transportation
Plan
Trends & Conditions
Project Priority List
Transportation Improvement
Program
![Page 3: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/3.jpg)
Underlying Planning Process
Planning Factors:
a) support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency;
b) increase the safety of the transportation system for motorized and non-motorized users; c) increase the security of the transportation system for motorized and non-motorized users; d) increase the accessibility and mobility of people and for freight; e) protect and enhance the environment, promote energy conservation, improve the quality of
life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns;
f) enhance the integration and connectivity of the transportation system, across and between modes, for people and freight;
g) promote efficient system management and operation; h) emphasize the preservation of the existing transportation system; i) improve the resiliency and reliability of the transportation system and reduce or mitigate
stormwater impacts of surface transportation; and j) enhance travel and tourism.
![Page 4: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/4.jpg)
Performance Based
Planning Process
![Page 5: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/5.jpg)
Long Range Plan Development
Cost Feasible List of Projects
Project Priority List (20 year list)
Submit for Funding in Work Program
Adopt Transportation Improvement Program
Old Planning Process
MetroPlan Orlando Process
![Page 6: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/6.jpg)
Performance Measures & Targets
Long Range Plan & CF list of projects
Trends and Conditions report (performance measures and corridor rankings)
Project Priority List (to meet measures & targets)
Adopt Transportation Improvement Program
New Planning Process
New - MetroPlan Orlando Process
![Page 7: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/7.jpg)
Safety Travel Time Reliability
Bridge Condition
Pavement Condition
Performance Measures & Target Development
Evacuation Multimodal SystemAccessibility to
Attractions / Airport / Convention
Accessibility to Activity Centers
Environmental Justice
Off –Peak Period Congestion
Air Quality Actively Managed Corridors
Environmental / Storm water Issues
Federal Performance Measures (National Highway System)
MetroPlan Orlando Performance Measures (all Federal Aid Corridors)
![Page 8: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/8.jpg)
Federal Performance Measures & Targets
![Page 9: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/9.jpg)
MetroPlan Orlando Performance Measures & Targets
![Page 10: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/10.jpg)
![Page 11: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/11.jpg)
![Page 12: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/12.jpg)
Federal Performance Measures (National Highway System)
Top Ranked Corridors
High crash corridors
Worst travel time corridors
Poor Bridge Condition
Poor Pavement Condition
![Page 13: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/13.jpg)
Performance Based Planning Process
National Highway System
State Roads Complete Streets
Bike / Ped TSMO Transit
Top Ranked Corridors
Old
Proj
ect P
riorit
y Li
st
National Highway System & State
RoadsFederal Aid
System
Regional Trails Transit
New
Pro
ject
Prio
rity
List
![Page 14: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/14.jpg)
Corr
idor
Ra
nkin
g
![Page 15: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/15.jpg)
TIMELINE PROJECT PLANNING
Goals Performance Measures & Targets
Long Range Plan – Cost Feasible Plan (more than widening)
January / February - Trends and Conditions Report / Corridor Rankings
April & May - Draft Project Priority List & Request for Project Applications
July - Transportation Improvement Program / Work Program Opens
October - Final Draft of Project Priority List
Ever
y Fiv
e (5
) ye
ars
Annu
al P
roce
ss
![Page 16: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/16.jpg)
What’s Next?
![Page 17: Performance Measures & Planning Process · Underlying Planning Process. PERFORMANCE‐DRIVEN, OUTCOME ‐BASED APPROACH TO PLANNING: 450.306(a) The MPO, in cooperation with the State](https://reader036.vdocuments.mx/reader036/viewer/2022071102/5fdba3c605dc383f48384241/html5/thumbnails/17.jpg)
Thank You!Nick Lepp| [email protected] | (407) 481-5672
250 S. Orange Ave., Suite 200, Orlando, FL 32801