Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz Using the EPPI – Enterprise Process Performance Improvement Methodology-Set Guy W. Wallace Version: 2018

Upload: others

Post on 17-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement

From Macro to Micro and Back

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Using the EPPI – Enterprise Process Performance Improvement Methodology-Set

Guy W. Wallace

Version: 2018

Page 2: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Guy has been primarily influenced by Geary Rummler, Bob Mager, Joe Harless, Ray Svenson, Richard E. Clark - and the Worldwide TQM Movement - beginning in 1979. He has served 85+ clients since 1982.

Page 3: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Preamble

Page 4: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Preamble

Page 5: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Preamble

Page 6: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Feedback

Inputs

Expectations People Info/Data Materials Equipment Etc.

Inputs

Expectations People Info/Data Materials Equipment Etc.

Feedback

Inputs

Expectations People Info/Data Materials Equipment Etc.

Feedback

Outputs As Input

M M M M M M M M M M M M M

M Measurements as Established by the Stakeholders … and Their Stakeholders, Etc.

Preamble

M

Page 7: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Stakeholders establish

Requirements for

Outputs and/or the

Process

Preamble

M

a.k.a.: Outcomes

Page 8: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 9: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 10: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

1. The Big Picture of Enterprise

Performance

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 11: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 12: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 13: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 14: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required depends on the balanced Performance Requirements of all of the Stakeholders

What is Required depends on both the Performance Requirements and the Environmental capabilities available

What is Required depends on both the Performance Requirements and the Human capabilities available

The Process

The Human Assets

The Environmental Assets

Page 15: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Review…

Page 16: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 17: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 18: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

2. Process Performance Variables

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 19: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required of the Process depends on the balanced Performance Requirements of all of the Stakeholders

Process - Processes

Upstream Processes

Process - Processes Downstream Processes

Adapted from the Ishikawa Diagram

Page 20: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required of the HA depends on both the Performance Requirements and the Environmental capabilities available

Page 21: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required of the EA depends on both the Performance Requirements and the Human capabilities available

Page 22: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Review…

Process - Processes

Upstream Processes

Process - Processes Downstream Processes

Page 23: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 24: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 25: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

3. Human Performance Variables

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 26: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required of the HA depends on both the Performance Requirements and the Environmental capabilities available

Page 27: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Assets – Awareness/Knowledge/Skills

Examples:

Enterprise Marketplace Customers Competitors Software Policies Laws/regulations/codes Interpersonal skills Management skills

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 28: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Assets – Physical Attributes

Examples:

Sight Hearing Dexterity Weight Height Reach

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 29: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Assets – Psychological Attributes

Examples:

Empathy Extroversion Introversion Conscientiousness

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 30: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Assets – Intellectual Attributes

Examples:

Abstract thinking Concrete thinking Systems thinking Strategic thinking Tactical thinking Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 31: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Assets – Personal Values

Examples:

Customer Satisfaction Servant Leadership Tolerance for other cultures Tolerance for other religions Honesty Neatness Consistency

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 32: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Review…

Page 33: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 34: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 35: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

4. Environmental Performance Variables

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 36: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required of the EA depends on both the Performance Requirements and the Human capabilities available

Page 37: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Assets – Data/Information

Examples:

Strategic Plans Operational Plans Operational Budgets Policies Procedures Work Orders/ Instructions Safety Guidelines Stakeholder & Customer Satisfaction Survey Results Employee Satisfaction Survey Results Raw and Processed data specific to the targeted Process’ outputs and tasks

Etc.

What Would You Add?

Use the Language of Your Enterprise

Page 38: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Assets – Materials/Supplies

Examples:

Paper Printer cartridges Pens, pencils Other Process consumables: sub-assemblies, chemicals, glue, nuts and bolts, gas, oil, etc. Forms Templates

Etc. What Would

You Add?

Use the Language of Your Enterprise

Page 39: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Assets – Tools/Equipment

Examples:

Cars/trucks/vehicles Trailers Overhead cranes Heavy machinery Fork lifts Computers Printers Copy machines Phones Video Players Cameras

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 40: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Assets – Facilities/Grounds

Examples:

Office building Parking lot Office spaces Conference rooms Storage rooms Restrooms Water lines Gas lines Phone systems Lighting Receiving dock ramps

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 41: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Assets – Budget/Headcount

Examples:

Capital budget Reserve budget Operational budget Headcount/staff budget Outsourcing budget

Etc.

What Would

You Add?

Use the Language of Your Enterprise

Page 42: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Assets – Culture/Consequences

Examples:

Open or Closed door policy/practice Customer and Supplier or Self Orientation People First or Business First practices Punishing good performers with more work Rewarding everyone equally or differentiating based on an equitable approach Incentives

Etc. What Would

You Add?

Use the Language of Your Enterprise

Page 43: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Review…

Page 44: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 45: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 46: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

5. Asset Management Systems

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 47: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Asset Provisioning Systems

Environmental Asset Provisioning Systems

a.k.a.: The Process & Enablers

Page 48: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Asset Provisioning Systems

Page 49: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Use This Straw Model to Determine Who Owns These Responsibilities in your Enterprise

If There Isn’t Any Designated Group

– It’s Up To Management of the Process(es)

Sometimes it is a Shared Responsibility

Page 50: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Environmental Asset Provisioning Systems

Page 51: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Use This Straw Model to Determine Who Owns These Responsibilities in your Enterprise

If There Isn’t Any Designated Group

– It’s Up To Management of the Process(es)

Sometimes it is a Shared Responsibility

Page 52: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Human Asset Provisioning Systems

Environmental Asset Provisioning Systems

Review…

a.k.a.: The Process & Enablers

Page 53: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 54: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 55: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

6. Improvement Projects Planning & Management

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 56: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

2 Stage Approach

Page 57: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Targeting - EPPI Stage I Targeting Enterprise Process Performance Improvement – Stage I

Gap/Value Analysis & Improvement Planning

Phase 1- Plan the Project and Review the Plan & Kick-Off the Effort

Phase 2- Analyze the Current State for Problem & Opportunity Gaps and Target Improvements and Review the Analysis Phase 3- High-Level (Macro) Design Future State for the Promising Future State and Review the Design Phase 4- High-Level (Macro) Implementation Plan for ROI and Guidance for Stage 2

Page 58: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Once You’ve Uncovered the Gaps from a Feasible Ideal – You May Need Deeper Expertise Than You Yourself Have In Order to See the Potential and Likely Costs for Addressing Those Gaps

Page 59: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

EPPI Stage II – Intervention Initiatives Targeting Enterprise Process Performance Improvement – Stage II

Intervention Initiatives Planning & Management

Revision & Release

EPPI II Phase 6

Development/ Acquisition Analysis Design Pilot Test

Project Planning & Kick-off

EPPI II Phase 1 EPPI II Phase 2 EPPI II Phase 3 EPPI II Phase 4 EPPI II Phase 5

©2002 EPPIC, Inc.

Phase 1- Plan the Project and Review the Plan & Kick-Off the Effort

Phase 2- Analyze the Current State in Detail for the Targeted Improvements and Review the Analysis data Phase 3- Micro Design Future State for the Promising Future State and Review the Design

Phase 4- Intervention Development and Alpha & Beta Testing

Phase 5- Full Destructive Pilot Testing and Review of the Results

Phase 6- Final Revisions and Release/Rollout

Page 60: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

EPPI Stage II – Intervention Initiatives Targeting Enterprise Process Performance Improvement – Stage II

Intervention Initiatives Planning & Management

Process ReDesign

IT ReDesign

L&D ReDesign

Page 61: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

EPPI Stage II – Intervention Initiatives Targeting Enterprise Process Performance Improvement – Stage II

Intervention Initiatives Planning & Management

Revision & Release

EPPI II Phase 6

Development/ Acquisition Analysis Design Pilot Test

Project Planning & Kick-off

EPPI II Phase 1 EPPI II Phase 2 EPPI II Phase 3 EPPI II Phase 4 EPPI II Phase 5

©2002 EPPIC, Inc.

Yes – This Is ADDIE-like – a NPD - New Product Development Framework Used for Instruction or Any Intervention-Set

But Please Note – Many Organizations Have Their Own NPD Framework – and You Should Always Use That Instead – For Selling & Political Purposes

Page 62: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

2 Stage Approach

Page 63: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

This Book From 2011 Includes Provides a Straw Model of All of the Set of Starter Tasks for Each Phase in both Stage I and Stage II

Page 64: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Likelihood of Other Possible Interventions Being Needed Suggests That You Involve Others With the Potential, Broader Expertise From Day 1 On The Project Work Team

Review…

Page 65: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 66: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 67: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

7. Back to the Macro

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 68: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 69: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

What is Required depends on the balanced Performance Requirements of all of the Stakeholders

What is Required depends on both the Performance Requirements and the Environmental capabilities available

What is Required depends on both the Performance Requirements and the Human capabilities available

The Process

The Human Assets

The Environmental Assets

Page 70: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Process Most Likely Has Accepted Business Metrics That Your Improvement Effort Should Impact. Use Those to Determine Gap Values & ROI.

As the late Geary Rummler preached – give the People the Benefit of the Doubt and 1st Look Elsewhere For Gap Causes (the Process Itself & the Environment)

Once a Gap Here Is Determined As Likely – Look Upstream to the Provisioning Systems for Gaps & Causes in Their Systems (Repeating the Analysis)

Comment on: The Process

Comment on: The Human Assets

Comment on: The Environmental Assets

Page 71: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 72: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 73: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 74: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 75: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Processes Are Often Invisible

Often Vary From One Use to the Next

Are Often Not Measured

Are Often Informal and Not Managed

Are Often at the Root of Gaps Elsewhere

What Else Would You Add?

Page 76: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Review…

Page 77: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Proceeding

Page 78: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Agenda 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 79: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Performance Improvement From Macro to Micro and Back

8. Session Wrap Up & Close

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 80: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Summary 1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 81: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Summary

1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 82: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Summary

1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 83: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The Session Summary

1.The Big Picture of Enterprise Performance 2.Process Performance Variables 3.Human Performance Variables 4.Environmental Performance Variables 5.Asset Management Systems 6.Improvement Projects Planning &

Management 7.Back to the Macro 8.Session Wrap Up & Close

Preamble

Page 84: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Q & A Before Ending

Page 85: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

2 of Guy’s Books On This

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

1994 Out of Print but Available Used Online

2011 Available Online as a Kindle and Paperback

Page 86: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Hundreds of Free Resources Are Available At: www.eppic.biz

Audio Podcasts, Videos, Articles, Chapters, Books, Presentations

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Page 87: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Hundreds of Free Resources Are Available At: www.eppic.biz

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

This Presentation Is Available As a Free PowerPoint Show

https://eppic.biz/resources/powerpoint-show-collection/

In the EPPI Section Near the Bottom of the Page

Page 88: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Remember…

Page 89: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Guy has been in the Performance-based Instructional Design and Human Performance Improvement business since 1979 and has been an external consultant since 1982. He has served 85+ Clients and conducted over 250 projects – all aimed at improving business metrics. Guy may be reached via email at:

[email protected]

Page 90: Performance Improvement From Macro to Micro and Back...2018/02/18  · Performance Improvement From Macro to Micro and Back Guy W. Wallace Pursuing Performance EPPIC Inc. Using the

[email protected]

www.eppic.biz

Thank You For Your

Participation! Your Feedback Is Always Appreciated!