perception erp & evms

79
PERCEPTION® A Shipbuilder’s Enterprise Resource Planning (ERP) & Earned Value Management (EVM) System

Upload: lukman-tarigan-sumatra

Post on 10-Nov-2014

10 views

Category:

Documents


1 download

DESCRIPTION

Preception

TRANSCRIPT

Page 1: Perception Erp & Evms

PERCEPTION®

A Shipbuilder’s Enterprise Resource Planning (ERP) &

Earned Value Management (EVM) System

Page 2: Perception Erp & Evms

The task of estimating costs, planning and

scheduling men and materials and then

controlling these resources to maximize

production output, while minimizing costs,

can be a very difficult job.

These efforts become more complex with the These efforts become more complex with the

increase in the size of the shipyard

organization and the scope of the yard

operations. Modern-day shipbuilding poses

no mean management challenge.

Page 3: Perception Erp & Evms

A very basic problem has been job

progress visibility, or lack thereof.

Without it, management must operate

blindly. Cause and effect relationships

become blurred in the midst of daily become blurred in the midst of daily

shipyard production problems and drain

away the capacity to direct production

effectively and economically.

Page 4: Perception Erp & Evms

Knowing precisely, and in a timely

manner, the exact status of men and

material, a responsible management

can rectify problems quickly before

they become critical.

Page 5: Perception Erp & Evms

PERCEPTION helps integrate and coordinate

activities across shipyard departments

Page 6: Perception Erp & Evms

Engineering CAD

Cost PlanningScheduling

Purchasing

ManpowerControl

Drawing Control

Material Control

PerformanceReporting

CustomerBillings

AccountingSystems

Accounts Payable

Accounts Receivable

3rd Party Software 3rd Party Software

Cost

Estimating Scheduling Control Reporting Billings

Time Charges

PERCEPTION helps manage the full flow of shipyard information

Page 7: Perception Erp & Evms

• By Systems Work Breakdown Structure (SWBS)

Costs and schedules can be summarized by

several different project work breakdown

structures (WBS) simultaneously:

• By Systems Work Breakdown Structure (SWBS)

• By Product Work Breakdown Structure (PWBS)

• By Shipyard Organization (COA)

• By Contract Line Item (CLIN)

Page 8: Perception Erp & Evms

Flexible, Multi-View Work Breakdown Structures

Page 9: Perception Erp & Evms

Consistent &

Compatible

WBS for

•Cost Estimates,

• Labor Cost

Management &

•Material Cost

Management

Page 10: Perception Erp & Evms
Page 11: Perception Erp & Evms

Engineering CAD

PERCEPTION interfaces with a variety of different

engineering CAD systems. These interfaces can be used

to down-load detailed bills of material for

• Cost Estimating• Cost Estimating

• Purchase Requisitions

• Work Order Bills of Materials

Page 12: Perception Erp & Evms

Ship Design

&

Engineering

System

Immediate

Cost Estimate

of the Ship

Design

Page 13: Perception Erp & Evms

Options to Automate Transfer of BOM from

CAD systems.

AutoCAD

PERCEPTION

CAD

System

PERCEPTION

Purchase

Requisitions

Production

Control

Page 14: Perception Erp & Evms

PERCEPTION has been linked to various Ship Design and

Engineering systems:

• Albacore’s ShipConstructor

• Proteus Engineering’s Flagship suite

• Intergraph’s GSCAD

• Autodesk’s AutoCAD general design system

• Rebis’ AutoPLANT piping system design and engineering

system

• Bentley’s MicroStation general design system

• The U.S. Navy’s ASSET Ship Concept Model

Page 15: Perception Erp & Evms

Cost Estimating

PERCEPTION was developed to permit cost estimating that can

reflect modern ship design and production methods.

Using product- and process-based information, cost estimates can

be generated quickly and accurately at any level of detail:

• Parametric cost estimates based upon modifiable ship

design and mission characteristics

• Standard shipbuilding & ship repair interim products &

services

• Detail cost estimates based upon engineered bills of material

and equipment specifications.

Page 16: Perception Erp & Evms

PERCEPTION allows the cost estimate to link directly

to production data.

Page 17: Perception Erp & Evms

For user convenience, standard cost estimating relationships

(CERs) can be cataloged in different database tables:

1. Structural work CERs

2. Machinery work CERs

3. Pipe work CERs

4. Electrical work CERs

5. HVAC work CERs

6. Outfit work CERs

7. Paint work CERs

8. Miscellaneous work CERs

9. Parametric Equations

Page 18: Perception Erp & Evms

PERCEPTION also provides for libraries of standard

work packages. A Standard Package is a set of cost items

that define the scope of work and material requirements

for a specific production process or product.

Each package item is developed in a way similar to the Each package item is developed in a way similar to the

development of cost items in a project estimate. However,

the standard package can be made parametric and it can

be used as many times as necessary in a project estimate.

Page 19: Perception Erp & Evms

Sample Summary Cost Proposal

Page 20: Perception Erp & Evms

Commercial Vessels:

•Double Hulled Fuel Barges

•Tankers & Product Carriers

•Container Ships

Naval Vessels

Frigates

Mono-hull Transport

Ships

Catamaran Transport

Ships

Trimaran Transport

Ships

Powerful Parametric Cost Models

also are available to generate

estimates quickly and with excellent

precision.

•Container Ships

•Bulk Carriers

•Hydrographic & Research

Vessels

•Mono-Hull Ships

•Catamaran Ships

•Trimaran Ships

•SWATH Ships

Ships

Coast Guard Vessels

Patrol Boats

Cutters

Buoy Tenders

Work Barges

Towboats

Page 21: Perception Erp & Evms

Planning & Scheduling

PERCEPTION has features for planning and scheduling

all project activities:

• Schedule Design & Engineering Activities

• Schedule Engineering Drawings

• Schedule Production Work Orders

• Schedule Work Order Material Pallets

• Schedule Purchased Material Deliveries

• Schedule Subcontractors

• Schedule Tests & Trials

Page 22: Perception Erp & Evms

Developing the Build Strategy

Production

Engineering

Plan

Structural Parts

Fabrication

&

Assembly

Plan

Outfit Systems

Fabrication

&

Assembly

Plan

Hull Block Hull Block

Erection

Sequence

Plan

Equipment

&

Outfit Module

Erection

Sequence

Plan

On-Board

Zone Outfit

Plan

Tests & Trials Plan

Page 23: Perception Erp & Evms

A plan that fully integrates manufacturing, assembly &

erection operations with support services, purchasing and

material control = A better, less costly executable plan.

Page 24: Perception Erp & Evms

PERCEPTION can schedule and track

various stages of material schedules.

Page 25: Perception Erp & Evms

Material Deliveries Must Be Scheduled

to Meet Required Delivery DatesR

eq

uir

ed

De

livery

Date

Nee

d D

ate

Re

qu

ired

De

livery

Date

Nee

d D

ate

Stores BufferTime

Work OrderSchedule

Production

Planned Start Date

Production

Planned Finish Date

Page 26: Perception Erp & Evms

Drawing Control

Material requirements for a project can begin with

requisitions.

However, requisitions can be preceded by engineering However, requisitions can be preceded by engineering

drawings and their bills of material (BOMs).

Drawing BOMs can be entered manually or via down-

loading this detail information from CAD systems.

Page 27: Perception Erp & Evms

Drawings

Linked to Requisitions

With PERCEPTION, a

drawing BOM can be used drawing BOM can be used

to generate one or more

requisitions.

Page 28: Perception Erp & Evms

Drawings

Linked to Work Order Pallets

With PERCEPTION, a

drawing BOM can be used to drawing BOM can be used to

generate one or more work

order pallets.

The pallets then can be used

to generate a requisition.

Page 29: Perception Erp & Evms

Purchasing

PERCEPTION generates a variety of purchase orders:

• Normal POs formulated directly from purchase

requisitionsrequisitions

• QUICK PO for items not entered on a requyisition.

• Blanket Purchase Agreement

• Bulk Purchase Order

Page 30: Perception Erp & Evms

• Purchase Requisitions

• Requests for Quotations (RFQs)

• Purchase Orders

PERCEPTION manages all purchasing and

material control cost and schedule functions:

• Expediting Functions & Reports

• Receiving Functions

• Vendor Invoice Control

• Transactions To Accounting System’s Accounts

Payable (A/P) & General Ledger (G/L)

Page 31: Perception Erp & Evms

Tab to open purchase order items

Sample Purchase Order Cover Record

Page 32: Perception Erp & Evms

Sample Purchase Order Item

Page 33: Perception Erp & Evms

Sample Purchase

Order Document

Using Domestic

Funds

Page 34: Perception Erp & Evms

Sample Purchase

Order Document

Using Foreign

Funds

Page 35: Perception Erp & Evms

Planning & Scheduling

Material Purchases & Deliveries

Page 36: Perception Erp & Evms

Discrete

Work

Order

Time Phased

Level-of-Effort

Work Order

Product-Oriented

Distributed

Work Order

Process-Oriented

Incremental

Work Order

Four Types of Work Orders Provide

Extra Flexibility

WBSShip

Systems

ProductZones & Unit

Modules

Product Stage ofConstruction (Work

Centers)

Page 37: Perception Erp & Evms

Sample Work Order Data

Tabs: Sub-Tasks (if any); Trade Breakdown; & Pallet Material Requirements;

Page 38: Perception Erp & Evms

Manpower Control

PERCEPTION provides features for planning and

forecasting shipyard manpower requirements by

project, by work center, and by trade.

PERCEPTION provides for a full compliment of

features for developing work orders and for

collecting time charges.

Page 39: Perception Erp & Evms

• Manpower Planning & Forecasting

• Work Order Budgeting & Scheduling

• Work Order Authorization & Release

• Work Order Time Charging

PERCEPTION manages all labor planning,

cost and schedule management functions:

• Work Order Time Charging

• Work Order Closings

• Exception Reporting (Late Start & Finish, Budget

Variances, Rework, Premium Time Charges, etc.)

• Time Charge Transactions To Accounting System’s

Payroll

Page 40: Perception Erp & Evms
Page 41: Perception Erp & Evms

Sample Work Order Ticket Pages

Work Order Ticket Cover

with budget, schedule, &

trade requirements

Detail work instructions Work Order Material

Requirements List

Page 42: Perception Erp & Evms

Work Order Ticket CAD Drawing Page

Page 43: Perception Erp & Evms

Sample Manpower “Proposal” Graphic Report

Integrating New Work with On-Going Contracts

Page 44: Perception Erp & Evms

Manpower planning & forecasting, by project, by

work center, and by trade across the yard.

Reporting Actual Manpower Against Planned & Forecast

Page 45: Perception Erp & Evms
Page 46: Perception Erp & Evms

Material Control

PERCEPTION has many features for managing

material throughout the shipyard operations.

Page 47: Perception Erp & Evms

• Material Storage & Buffer Areas Management

• Work Order Material Requirements (Pallets)

• Electronic Interfaces With Engineering CAD

Drawing Systems

• Stock Requisitions• Stock Requisitions

• Manufactured Parts Control

• Stock Inventory Control & Replenishment

• Small Tools Control

Page 48: Perception Erp & Evms

PERCEPTION supports a Parts Catalog that can be used in the

following areas of the system’s capabilities:

• Cost estimating that identifies detail material

requirements using Part IDs from the catalog.

• Stock inventory control, where stock items are managed in

the Parts Catalog.

• Standard Direct Purchase Material Items that provide the • Standard Direct Purchase Material Items that provide the

means for bulk purchasing benefits.

• Production pallet planning and management functions

using standard parts (stock and/or direct purchase items)

from the catalog.

• Engineering drawing bills of material using standard

parts (stock and/or direct purchase items) from the catalog.

Page 49: Perception Erp & Evms

If part attributes are to be used, open the next tab window

and enter attribute values.

Pictures, drawings & spec files also can be identified here.

Page 50: Perception Erp & Evms

Earned Value Performance

Reporting

The process of tracking and managing contract

performance requires accurate and timely feedback of

costs and schedules which can be measured against a costs and schedules which can be measured against a

baseline of budgets and planned schedules.

PERCEPTION can produce a wide variety of reports

that provide visibility of project performance at

different levels of detail.

Page 51: Perception Erp & Evms

• BAC: Budget At Completion

• MR: Management Reserves

• BCWS: Budgeted Cost of Work

• EAC: Estimated Cost At

Completion

• EAC Trend for 100% Progress

For any level of the project’s WBS,

PERCEPTION summarizes cost and schedule

performance:

• BCWS: Budgeted Cost of Work

Scheduled

• BCWP: Budgeted Cost of Work

Performed

• ACWP: Actual Cost of Work

Performed

• EAC Trend for 100% Progress

• Planned & Actual Progress

• Calendar Schedule Variance

• Calendar Variance Trend for

100% Progress

Page 52: Perception Erp & Evms

OnOn--Line Reporting of Line Reporting of

Cost/Schedule StatusCost/Schedule Status

Page 53: Perception Erp & Evms

Summary Progress Reports by Any WBS Level

Page 54: Perception Erp & Evms

Summary Progress Reports by Production Summary Progress Reports by Production

Work Centers

Page 55: Perception Erp & Evms

Summary Progress Reports by Production Summary Progress Reports by Production

Modules & Ship Zones

Page 56: Perception Erp & Evms

Summary Progress Reports by Summary Progress Reports by

Shipyard Trade/Craft

Page 57: Perception Erp & Evms

The PERCEPTION Steel Report Summarizes progress

and planned/forecast man-hours per ton for each unit

and block type for 5 stages of construction:

(Pats Fabrication, Sub-Assembly, Assembly, Erection &

On-Board Weld-out) plus total

Page 58: Perception Erp & Evms

Tracking ProgressTracking Progress• By project total

• By WBS Cost

Account Group

• By WBS Cost

Account

• By Product WBS

(assemblies, units,

& blocks)

• By Ship Zone

• By shipyard work

center

• By shipyard trade

group.

Page 59: Perception Erp & Evms

• By project total

• By WBS Cost

Account Group

• By WBS Cost

Account

• By Product WBS

(assemblies, units,

& blocks)& blocks)

• By Ship Zone

• By shipyard work

center

• By shipyard trade

group.

Page 60: Perception Erp & Evms
Page 61: Perception Erp & Evms
Page 62: Perception Erp & Evms

Tracking & Forecasting Tracking & Forecasting

Schedule VarianceSchedule Variance

Page 63: Perception Erp & Evms

Tracking

Dollar Costs

Page 64: Perception Erp & Evms
Page 65: Perception Erp & Evms
Page 66: Perception Erp & Evms

Earned Value Management is a project

management technique designed to:

� Ensure work is properly & adequately planned,

budgeted & scheduled

� Isolate problems for corrective action� Isolate problems for corrective action

� Measure cost & schedule performance of work

accomplished

� Measure true cost condition

� Forecast completion date & final cost

Page 67: Perception Erp & Evms

PERCEPTION determines WBS level performance

from work order performance.

Page 68: Perception Erp & Evms
Page 69: Perception Erp & Evms

PERCEPTION ties together all areas of

Earned Value Management:

1. Cost Estimating

2. Planning, Budgeting & Scheduling

3. Labor Work Order & Manpower Management

4. Purchasing & Inventory Control4. Purchasing & Inventory Control

5. Change Order Management

6. Earned Value Performance Measurement Reporting

7. Cost & Schedule Forecasting

8. Cost Analysis For Future Work Estimating

Page 70: Perception Erp & Evms

Comparing Production

Performance With Estimate

The performance of production costs should be monitored

and compared against the original estimate.

PERCEPTION generates summary reports at any level of PERCEPTION generates summary reports at any level of

the project WBS comparing the estimate against the

current budgets, actual costs charged to date, and the

estimated costs at completion.

Page 71: Perception Erp & Evms

Comparing Production Costs with Estimate

Page 72: Perception Erp & Evms

Customer Billings

PERCEPTION generates customer bills quickly and easily:

• Time & Material Charges

• Progress Payments Billings• Progress Payments Billings

• Fixed Price Services

• Transactions To Accounting System’s Accounts

Receivable (A/R) and General Ledger (G/L)

Page 73: Perception Erp & Evms

• Time & Material

Charges

• Progress Payments

Billings

• Fixed Price Services• Fixed Price Services

• Transactions To

Accounting System’s

Accounts Receivable

(A/R) and General

Ledger (G/L)

Page 74: Perception Erp & Evms

Accounting Systems

PERCEPTION generates transactions that can be

electronically input into accounting systems:

• Purchase Orders & Receipts• Purchase Orders & Receipts

• Vendor Invoices

• Time Charges

Page 75: Perception Erp & Evms

Accounting Systems Interfaces:

• Great Plains

• Peachtree

• Solomon

• Quick Books• Quick Books

• Generic Interface Transactions to many

other accounting software products.

Page 76: Perception Erp & Evms

Training Tutorials

PERCEPTION system includes a wide range of training

tutorials depending upon the user’s specific needs and

scope of system functions authorized to use.

Page 77: Perception Erp & Evms

Getting Started – General System Features

Starting A New Project

ESTI-MATE Cost Estimating Libraries

ESTI-MATE Estimating New Construction

ESTI-MATE Estimating Ship Repair

MAT-PAC Starting From Scratch for Material Planning,

Purchasing & Inventory Control.

MAT-PAC Managing Drawings

MAT-PAC Managing Stock Inventories

MAT-PAC Material Requisition

MAT-PAC Purchase Orders

MAT-PAC Receiving & Warehousing

MAT-PAC The Parts Catalog

MAT-PAC Tool Room Management Control

MAT-PAC Withdrawing Material

MAT-PAC Work Order Pallets

Training Tutorials:

PERT-PAC Integrated Scheduling

PERT-PAC Scheduling Hull Block Construction

WORK-PAC Starting From Scratch for Work Order

Planning & Management

WORK-PAC Generating Work Orders

WORK-PAC Project Manpower Planning & Forecasting

WORK-PAC Shipyard Total Manpower Modeling

Project Manager Activities

Reports - Labor Cost & Work Progress

Reports - Material Cost &Schedule Status

Accounting New Project Setup

Accounting Customer Billings

Accounting Interface Setup

Accounting Time Charges

Accounting Vendor Invoices

Page 78: Perception Erp & Evms

System Security

All users are required to log into the system with their name

and password.

Each user also is formally assigned authorized areas of the

software to access and restricted from all others.software to access and restricted from all others.

Page 79: Perception Erp & Evms

Over 35 Years Serving the Shipbuilding &

Repair Industry