pepper pot monitor for the linac3 itl line
DESCRIPTION
Pepper Pot monitor for the Linac3 ITL Line. MSWG– 13- Aug -2013 F.Roncarolo , A.Ravni. Introduction. SCOPE Provide emittance measurement after the ITL spectrometer CONSTRAINTS Only space available is diagnostic tank presently hosting slit+ SEM grid + Farady cup Beam not round - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/1.jpg)
Pepper Pot monitor for the Linac3 ITL Line
MSWG– 13- Aug -2013
F.Roncarolo, A.Ravni
![Page 2: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/2.jpg)
F.Ro
ncar
olo
2
Introduction
SCOPE Provide emittance measurement after the ITL spectrometer
CONSTRAINTS Only space available is diagnostic tank presently hosting slit+ SEM grid
+ Farady cup Beam not round Limited resources in BI
PROPOSED SOLUTION Buy a commercial pepper pot system to be integrated into the
diagnostics tank at the place of the SEM grid
13-A
ug-2
013
![Page 3: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/3.jpg)
F.Ro
ncar
olo
3
Linac 3 - LEBT
Existing Diagnostic Tank
13-A
ug-2
013 Source
ITL
![Page 4: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/4.jpg)
F.Ro
ncar
olo
4
ABP - Request
1. single charge state ion beam from an ECR ion source after the spectrometer
2. intensity: 200 eμA for Pb29+, but could be >1emA for other (lighter) ions3. time structure: 10Hz, 50ms heating pulses with beam extracted, plus ~2ms
afterglow4. beam energy: 2.5 keV/u for interesting beam, other charge states/species
from same potential
5. dimensions of the beam: x = +-1.5 mm, xp = +-130 mrad, y = +-9 mm, yp= +-9.5 mrad,
6. nominal lead beam, 100% beam envelope
7. the system needs to be retractable from the beam line8. the system should be made of UHV compatible components
13-A
ug-2
013
![Page 5: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/5.jpg)
F.Ro
ncar
olo
5
Offers
Detlef Kuchler contacted - Helmholtz-Zentrum Dresden-Rossendorf- Kernfysisch Versneller Instituut (KVI), Groningen, the Netherlands
- PANTECHNIK S.A. , France- Commercialization of KVI system, especially developed to meas. Emittance
at ECR sources front-end- Pepperpot ‘pinhole’ mask, tungsten foil with a vertical row of 20 holes
(20um diameter, 2mm pitch, changeable at the moment of ordering)– X,X’ + Y,Y’ reconstruction by scanning the vertical row along the hor
axis- MCP plate + phosphor screen- CCD camera- Control-Acquisition-Analysis SW
PANTECKNIK offer recognized as the best (D.Kuckler, R.Scrivens, E.Bravin, J-J.Gras, F.Roncarolo) started to investigate integration into existing tank (A.Ravni, BI-ML)
13-A
ug-2
013
![Page 6: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/6.jpg)
F.Ro
ncar
olo
6
PANTECHNIK system
BEAM
Pepper pot plateMCP, PHOSPHOR
Mirror
Camera
13-A
ug-2
013
![Page 7: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/7.jpg)
F.Ro
ncar
olo
7
Integration into existing tank (A.Ravni)
Faraday Cup
SLITPepper Pot
13-A
ug-2
013
![Page 8: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/8.jpg)
F.Ro
ncar
olo
8
Integration into existing tank (A.Ravni)
Variable Diameter
S-Shaped
Faraday Cup
SLIT
Faraday Cup
SLIT
Pepper Pot
Pepper Pot
This tank design
• verified with main workshop• allows keeping SLIT and FC
mechanisms as existing
13-A
ug-2
013
![Page 9: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/9.jpg)
F.Ro
ncar
olo
9
Integration into existing tank (A.Ravni)
Tank modifications w.r.t. existing one- Slit moved forward of 50 mm (maximum allowed, A.Lombardi)- Tank diameter reduced of 46 mm (300 254 mm)- Tank length increased of 70 mm (310 380 mm) shorter bellow on 1
side) - to avoid interference w. Pepper Pot
- FC side diameter opening changed - Slit side tank with S-shape (angle)
Still to be decided: interconnection to upstream pipe, being discussed with Vacuum (J.Hansen), to avoid having bellow directly soldered on pipe (as proposed by BI-ML)
13-A
ug-2
013
![Page 10: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/10.jpg)
F.Ro
ncar
olo
10
Timing and gating13
-Aug
-201
3
Linac3 requirements: 50ms pulse + 2 ms (max) afterglow, 10Hz rep. rate- want to sample afterglow emittance with 100us (max) sampling rate
Pantechnik proposed:-Camera: SONY XCL-U1000
shutter trigger rate 15Hz (max)shutter gate length from 100us to 66ms
-Phosphor: P431.2 ms decay time
So, we looked at alternative phosphors-R42, P47 fast enough-P47 better radiation hard
![Page 11: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/11.jpg)
F.Ro
ncar
olo
11
13-A
ug-2
013
Camera sensitivity matches better R42 than P47, but P47 has twice the emissivity (see table previous slide)
Conclusion: Pantechnik accepted to provide P47 for same price as P43
![Page 12: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/12.jpg)
F.Ro
ncar
olo
12
Conclusions
Commercial Pepper Pot Order approved by purchasing officer on Aug 9th Design of new tank finished
- Slit and FC as they are- If approved by all concerned people
- Launch tank fabrication Delays
- From Pantechnik offer: 5 month (Aug. Excluded) - Need to follow up to ensure reception and installation for ~Feb2014
Costs- 90kEu - Tank costs to be estimated
Operation&Control- It is not foreseen to integrate the system into the CO infrastructure- System to be used on stand-alone PC (control + data processing via Labview provided by
Pantechnik) ‘VIA fellow’ (shared by ABP and BI), from end of 2013, supposed to look also
into emittance measurements at Linac3
13-A
ug-2
013
![Page 13: Pepper Pot monitor for the Linac3 ITL Line](https://reader035.vdocuments.mx/reader035/viewer/2022081514/5681616c550346895dd0f983/html5/thumbnails/13.jpg)
F.Ro
ncar
olo
13
13-A
ug-2
013