peo land systems marine corps brief to industry · peo land systems marine corps. brief to ... peo...

12
1 PEO LAND SYSTEMS MARINE CORPS Brief to Industry 19 Sep 2017 Michael D. Halloran Director S&T, PEO LS

Upload: buiduong

Post on 09-May-2018

226 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

1

PEO LAND SYSTEMS MARINE CORPSBrief to Industry

19 Sep 2017Michael D. Halloran

Director S&T, PEO LS

Page 2: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

PEO LS

2

• Established in 2007 to enhance acquisition

oversight and focus on an expanding Marine

Corps portfolio of ACAT I & II ground and

amphibious weapons systems.

• Current PEO LS Portfolio consists of

Twenty Two (22) Programs totaling $8.3B

dollars across the FYDP.

Page 3: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

3

ASN (RD&A)

Program Executive Officer Land Systems Marine Corps

Mr. John M. GarnerDPEO/ Col Andrew BiancaChief of Staff/ Don Kelley

PEO LAND SYSTEMS CORE STAFF

AAV: 1 AUG 2011MOTOR T: 2 DEC 2011C4I: 30 JAN 2012MRAP: 29 JUL 2013

ASN (RD&A) Program Transitions

to PEO LS

CMC

MACCS

G/ATOR

GBADCAC2S

CTN

LW155

TBMCS

JLTV

HMMWV

ITV

GBAD-G/ATORGround Based Air Defense

Ground Air TaskOriented Radar

AC2SNAir Command Control

and Sensor Netting

M&HTVMedium & HeavyTactical Vehicles

TASTowed

Artillery Systems

MTVR

TRAILERS

MATV

BUFFALO

COUGAR

FRC

LVSR

P-19

ACV 1.1

AAV SU

AAV

AAAAdvanced

Amphibious Assault

MARCORSYSCOM Competency Aligned Staff

CONTRACTS

CONGRESSLIAISON & PAO

COST ESTIMATING

ENGINEERING

FINANCE

JOINT CENTER

LOGISTICS

MPT

SAFETY

SCIENCE &TECHNOLOGYBUSINESS

MANAGEMENTPROGRAM

MANAGEMENT

LTVLight

Tactical Vehicles

UTV

PEO LS WORKFORCEMILITARY: 47CIVILIAN: 324

Page 4: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

Denotes Lead Engineer also serving as the S&T Representative

PEO LS S&T ORGANIZATION

PM M&HTVJim Bohley

[email protected](703) 432-4371

LW155Joe Lipinski

[email protected](973) 724-4343

PM AAAJoe Was

[email protected](703) 780-2024

GBAD-G/ATORMaj Mike Wade

[email protected](703) 432-4248

PM AC2SNFran Bonner

[email protected](703) 432-4352

PM LTVDave Moyer

[email protected](703) 432-5087

PEO LS DIR S&TMr. Mike Halloran

[email protected](703) 432-5604

Page 5: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

5

‘FOCUSING THE FUTURE FASTER’

MANTRA

1. Accomplished through Concept-aligned,

Capability-based technology transitions into

Programs of Record (PORs).

2. Success through engagement, collaboration &

communication across the S&T Enterprise to

better inform, influence and align investments.

Page 6: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

6

S&T Concept to Capability Process

MAGTFCapabilities

List*MAGTF

Gap List* STO’s

Requirements Technology Matchups

Venues $$-FNC -SBIR-JCTD -STTR-INP -ATOs

TTA signed by“3 Circle”

Membership

PPBES/POM

Program of Record

BS&T

Developer

ACombat

Developer

CMaterial

Developer

“3 Circle Collaboration”

PEO LSS&T

PMs Identify Top Program Issues

Power & EnergySurvivability & MobilityModeling & Simulation

Open Plug & Play Comm. Architecture

Concepts

* Subject to change with the approval of the Marine Corps Force Development System (MCFDS)

1. Identify Strategic Concepts

2. Identify and Align Concept/Core Capabilities

3. Identity and Align to MGL – determine

all Deltas

4. STO Alignment to Issues or Identified

Deltas

7. Signed Agreement for Transitioning

Technology

6. Matching Gaps in Technology to Venue/

Resources/$$’s

5. Matching Requirements with Technology or Identified Deltas

8. Budget for the Technology Insertion/Active role in POM

9. Transition Technology intoProgram of Record

10. Capability – Leverage all S&T Resources to Close Warfighter Gaps

Focus

FollowThrough

Finish

Page 7: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

The ATIP serves as a ‘roadmap’ on how industry/Warfare Centers can best support PEO LS Program Managers and

their associated Technology needs!

1. Identifies the Top Technical Issues within PEO LS 2. Informs, Influences and Aligns S&T Investments 3. Resolve Capability Gaps & Technology Issues 4. Support Technology Insertion and Transition into PORs

72016 ATIP was published in February 2016! Available Electronically @ the Defense Innovation Marketplace (DIM):http://www.defenseinnovationmarketplace.mil/USMC.html

Page 8: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

The Result-ATIP

8

ACV 1.1 Technical Issue #1 Survivability

Page 9: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

S&T FOCUS AREAS

• Power and EnergyFuel EfficiencyPower/ Thermal Management

• Survivability/MobilityAutonomy/ CorrosionCrew Visibility/Fire SuppressionWeight Reduction/Transparent Armor

• Modeling and Simulation• Open Plug & Play C4I Architecture

9

Page 10: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

Follow TheMoney

Informed Investments = Affordable Solutions

10

• $4.4M in RIF Funding/ year• $35M in SBIR Funding• $250M in S&T Funding across the FYDP

Average ~ $42M / PMO of S&T $$$

Page 11: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

• Autonomy – Man-Machine Unmanned Teaming• Moving toward programs that support Autonomous Amphibious

Operations (swarming the beachhead with autonomous craft) • Looking at capabilities that support tactical maneuver of forces through

the use of unmanned autonomous systems capable of collaborating and sharing information to reduce the operator workload

• Cyber Secure Platforms

• Counter UAS

• Active Protection Systems

Where We’re Going

11

Page 12: PEO LAND SYSTEMS MARINE CORPS Brief to Industry · PEO LAND SYSTEMS MARINE CORPS. Brief to ... PEO LS S&T ORGANIZATION PM M&HTV. Jim ... * Subject to change with the approval of the

12

QUESTIONS